Experience of grouting works in the bed of the Bureya HPP dam

  • É. S. Argal
  • K. P. Kudrin
  • G. G. Tuzhikhin
Article
  • 33 Downloads

Keywords

Energy Source Power Generation Power Engineer Renewable Energy Source Structural Foundation 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. 1.
    É. S. Argal and G. G. Tuzhikhin, “Cutoff devices in the bed of the dam of the Bureya waterworks facility (experience of design and first results of implementation),” Gidrotekh. Stroit., No. 8, 14–21 (2001).Google Scholar
  2. 2.
    VSN-34-83. Grouting of Rock Beds of Hydrotechnical Structures, Izd. Minénergo SSSR [in Russian].Google Scholar

Copyright information

© Springer Science+Business Media, Inc. 2005

Authors and Affiliations

  • É. S. Argal
  • K. P. Kudrin
  • G. G. Tuzhikhin

There are no affiliations available

Personalised recommendations