Surgery is one of the key functions in hospitals; it generates significant revenue and admissions to hospitals. In this paper we address the decision of choosing a case-mix for a surgery department. The objective of this study is to generate an optimal case-mix plan of surgery patients with uncertain surgery operations, which includes uncertainty in surgery durations, length of stay, surgery demand and the availability of nurses. In order to obtain an optimal case-mix plan, a stochastic optimization model is proposed and the sample average approximation method is applied. The proposed model is used to determine the number of surgery cases to be weekly served, the amount of operating rooms’ time dedicated to each specialty and the number of ward beds dedicated to each specialty. The optimal case-mix selection criterion is based upon a weighted score taking into account both the waiting list and the historical demand of each patient category. The score aims to maximizing the service level of the operating rooms by increasing the total number of surgery cases that could be served. A computational experiment is presented to demonstrate the performance of the proposed method. The results show that the stochastic model solution outperforms the expected value problem solution. Additional analysis is conducted to study the effect of varying the number of ORs and nurses capacity on the overall ORs’ performance.
Keywords
Healthcare management Operating rooms scheduling Stochastic case-mix problem Mixed integer programming Stochastic programming Sample average approximation1 Introduction
Healthcare is becoming one of the largest industries in the developed and developing countries [1]. There are many challenges facing healthcare systems, such as the limited resources, the high cost of medical technology and medication, the high demand, the high customer expectations and the shortage in planning and management decision support tools specially with the increasing complexity of healthcare systems. Consequently, hospitals are more and more aware of the need to use their resources as efficiently as possible, which urges healthcare organizations to increase emphasis on process optimization in order to control and minimize operating costs and improve the provided services levels.
Operating Rooms (ORs) are important assets for hospitals as they generate the largest revenue and, at the same time, represent the largest cost source. According to “Healthcare Financial Management Association” (HFMA), ORs account for a large share of hospital care services and expenditure, at the same time, ORs result in an estimated 40% of hospital revenue [2]. Therefore, small improvements in efficiency could translate into significant savings and benefits to the patient as well as the hospital. For these reasons, scheduling of ORs in order to meet the hospital goals and carry out the operations/surgeries with maximal efficiency is one of the areas that draw considerable attention from the healthcare community. The increase in efficiency of the OR schedule has a bearing on the number of surgery cases executed, the total hospital cost or profit and utilization of resources.
The ORs scheduling decisions can be divided into three different and related problems, namely (i) the Case-Mix Problem (CMP), (ii) the Master Surgery Scheduling Problem (MSSP), and (iii) the Surgery Scheduling Problem (SSP) [3, 4].
The CMP refers to the decision of allocating the ORs’ times to each patient category in order to optimize their performance, in other words, how the available ORs time is distributed among the different specialties. In the MSS problem, the ORs time is allocated to these surgical specialties over the scheduling window (typically, one week) in order to maximize and level resource utilization. Finally, the SSP refers to assigning each surgical case a start time, a day, and an OR with the target of minimizing the waiting time and maximizing resources utilization. In this paper, we are considering the CMP which involves the decision making on surgery cases volumes and capacity requirements of each patient category. For more illustration about the CMP, an example is presented. In this example, an OR is available for eight hours a day, five days a week with total of 40 working hours per week.There are five patient categories. The question that the CMP answers is how can these 40 hours get divided between those five patient categories?. The CMP determines the number of OR hours dedicated to each patient category based on factors like: demand of each patient category, cost and profit for each patient category.
Hospitals can be classified according to the main targets of health care providers into two categories: profit satisfiers and profit maximizers [5]. Profit satisfying hospitals are motivated by professional interests rather than economic returns. A profit satisfying hospital seeks for the preferred case-mix pattern or other preset objectives on condition that it can manage to breakeven without violating the capacity constraints. On the other hand, profit maximizing hospitals are assumed to be positioned in a competitive business environment and thus they are willing to choose the patient cases that will bring the maximum rewards. Most private sector hospitals can be categorized as profit maximizing hospitals, while most government supported hospitals can be classified as profit satisfying ones.
In this paper, a stochastic optimization model for the CMP is proposed. The model generates an optimal case-mix pattern that maximizes the ORs service level. In our study, the ORs service level can be defined as the ability to satisfy the surgery demand and increase the total number of surgery cases that could be served. This model tackles two main challenges in the CMP: nurses availability capacity constraints and the uncertainty in surgery operations.
A worldwide common problem in healthcare systems is nursing staff shortages [6]. Many studies show that the availability of qualified nursing staff continues to be well below the needs of healthcare systems [7]. With nurse shortages, hospital managers are in dire need to optimally utilize current available nurses efficiently and retain them. Capacity shortage of nurses in the surgery department will keep surgery cases from being processed and it will significantly deteriorate OR utilization. Although nursing services account for an important part of a hospitals’ annual operating budget, nurse capacity constraints have received limited interest in CMP literature. To the best of our knowledge, and as indicated by Guerriero and Guido [8], Abdelrasol et al. [9] and most recently by Hof et al. [10], there is a lack in the literature regarding the CMP with uncertainty in demand, uncertain surgery operations and nurse staff capacity constraints.
Uncertainty in demand and in surgery operations result from a variety of reasons. Demand uncertainty means that it is difficult to accurately project surgery demand in the future. Larger than average surgery demands result in shortages in ORs’ resources which are reflected on the ORs’ service level. Demand uncertainty results from a variety of reasons. For instance, seasonality effects, unpredictable diseases and accidents. Furthermore, surgery operations have case-dependent durations and there is often a large variation between scheduled durations and actual durations. Length Of Stay (LOS) is also uncertain as well. Emergency surgeries are another important source that introduces more uncertainty to the problem. Uncertainty in demand and in surgery operations creates a burden on hospitals, this poses a significant challenge because it makes the mission of controling and managing the ORs is hard.
The objective is to maximize a weighted score under resources capacity constraints.The objective function aims to maximizing the service level of the operating rooms by increasing the total number of surgery cases that could be served. The case-mix selction criterion is based upon a weighted score taking into account both the waiting list and the historical demand of each patient category. The considered objective function is a service level measure of performance rather than a financial one. Thus, it can be applied in both profit satisfying and profit maximizing hospitals planning studies.
The objective of this paper is to solve a stochastic CMP while considering nurses capacity constraints. The contributions of this study are as follows: We formulate the CMP under nurses capacity constraints as a stochastic mixed integer programming model. Surgery durations, LOS, surgery demand and nurses daily availability are considered as random parameters with known distributions. A sampling based approach (Sample Average Approximation (SAA)) is applied to deal with the uncertainty in surgery operations and nurses capacity and to solve the proposed model.
The remainder of this paper is structured as follows. Section 2 contains a focused literature review on the CMP. The motivation for conducting this study is presented by the end of the literature review section. In Section 3, we present the proposed stochastic optimization model. In Section 4, the solution approach is introduced with description. Numerical experiments are presented in Section 5. Moreover, a numerical experiment is conducted to evaluate how the proposed stochastic model is performing in comparison with the corresponding deterministic model. Finally, concluding remarks are described in Section 6.
2 Literature review
Many review papers discussed the ORs scheduling problems. For recent reviews on this topic we refer to Cardoen et al. [11], Guerriero and Guido [8], Abdelrasol et al. [12] and the most recently Hof et al. [10]. Guerriero and Guido [8] presented a structured literature review on how Operations Research can be applied to the surgical planning and scheduling processes. They classified the research contributions by distinguishing three different decision levels, namely: strategic, tactical and operational. Abdelrasol et al. [12] reviewed the three ORs scheduling problems, they are: the CMP, the MSSP and the SSP. Furthermore, they introduced a research framework for an integrated planning method for the three problems. Most recently, Hof et al. [10] provided the first literature review focusing only on the CMP. They provided a comprehensive, structured literature review classifying CMPs according to modeling approaches, uncertainty of demand and supply, goals of using CMPs, means to achieve desired case mixes, and factors impacting the freedom of choosing case mixes. By the end of the paper, they presented possible directions for future research.
Hof et al. [10], and Guerriero and Guido [8] pointed out many references in the strategic level; however, most of these references discussed the case mix problem on the hospital level (The hospital case mix selection problem (HCMSP)). In this study, only the literature of the CMP for the surgery patient categories is considered. The CMP literature is discussed based on three variants: (1) The models objective functions; (2) The considered resources capacity constraints; and (3) The models with uncertainty on surgery operations and demand.
2.1 The models objective functions
Hospitals can be classified according to the main targets of health care providers into two categories: profit maximizers and profit satisfiers [5]. Objective functions could be classified based on the main targets into: financial related objective functions; and service level and utilization related ones. The first category is willing to choose the case-mix plan that will bring the maximum rewards; it is most suitable for most private sector hospitals. The second category seeks for the preferred case-mix pattern or other preset objectives on condition that it can manage to break-even without violating the capacity constraints; it is most suitable for non-profit and government supported hospitals. Also, it is applicable for private sector hospital as they may target such service level and utilization oriented measures.
The majority of the publications in the CMP considered financial related objective functions. A variety of financial related performance measures for hospitals are applied such as: Maximizing the hospital revenues, Calichman [13]; maximizing the contribution margins, Ma and Demeulemeester [3] and Dexter et al. [14]; maximizing the profits, Ma et al. [15]; and minimizing the hospital total or variable costs, Dexter et al. [16]. Furthermore, achieving the preferred physicians payments and revenues beside the hospital goals has attracted some researchers such as: Blake and Carter [17]; Mulholland et al. [18]; and Kuo et al. [19]. Under stochastic demand for surgeries: Gupta [20] targeted maximizing the expected revenues depending on the allocated OR time, similarly Fügener [21]; where Dexter et al. [22] considered the mean contribution margin per OR hour in their model.
On the other hand, Testi et al. [4] solved the CMP with the objective function of maximizing the total benefits. However the total benefits looks like a financial related measure, the calculation of these benefits is more related to the service level of the system. In their study, the calculation of the benefits were depending on both: The historical demand, the number of sessions which have been assigned weekly to each patient category; and the waiting list, the number of sessions necessary to clear the waiting list for each patient category. Based on the explored literature, there is a lack in the literature regarding the CMP with service level and utilization oriented measures.
2.2 The considered resources capacity constraints
The most expensive resource in most hospitals is the OR. Furthermore, ORs are clearly connected with other resources, for example: operating staff, surgeons and nurses; the intensive care unit (ICU); and the general patient wards required by the patients once they leave the OR. The majority of the CMP literature considered the beds in wards as capacity constraints; where, other resources are rarely considered.
A few papers considered the ICU capacity as a capacity constraint while solving the CMP. Dexter et al. [14] targeted to determine the mix of surgeons OR time allocations that maximize the contribution margin. They believed that different surgeons used differing amounts of hospital ward and ICU time. So, they solved their problem under the capacity constraints of hospital ward and ICU time. They concluded that to achieve substantive improvement in a hospitals perioperative financial performance despite restrictions on available OR, hospital ward beds, or ICU time should be considered when OR time is allocated; Similarly, Dexter et al. [16]. Mulholland et al. [18] optimized the financial outcomes for both the hospital and physicians under the capacity constraints of general care beds, ICU beds, OR times and recovery room times. Most recently, Fügener [21] combined a strategic and a tactical OR planning problems. The developed model decided how many (strategic) and what (tactical) OR blocks to assign to each medical specialty while considering the impact on the downstream resources ICUs and general patient wards.
Furthermore, a limited publications considered the CMP under nurses capacity constraints; however, most of them are pretty old or discussed the case mix problem on the hospital level (HCMSP): Feldstein [23], Dowling [24], Hughes and Soliman [25], Robbins and Tuntiwongpiboom [26], Rifai and Pecenka [27], and Meyer et al. [28].
2.3 The CMP under uncertainty
In order to provide a more accurate representation of the ORs scheduling problem, the developed models need to incorporate more realistic aspects. In the ORs planning problems, the optimally allocated time must balance the costs of allocating too much time, which may results in idle time for ORs and staff, with the costs of allocating too little time, which may result in overtime charges. To reach this goal, uncertainty on surgery time, LOS, variation on demand and workloads should be taken into account. Most models followed a deterministic approach arguing that strategic problem uncertainties compensate each other or reserving a buffer capacity for variation and uncertainty on surgical demand. A very limited publications considered the CMP under uncertainty.
Dexter et al. [22] proposed a two-stage approach for the allocation of OR time at facilities where the strategic decision had been made to increase the number of ORs. They considered the stochastic nature of patient demand implemented uncertainty of demand in their resource allocation approaches.
Gupta [20] has addressed the surgery capacity allocation and two other different problems arising in the management of surgical suites. For each of them, a general mathematical formulation and potential solution approaches are presented. He formulated the CMP under uncertainty in surgery demand and proposed a multi-stage newsvendor model for the problem of the allocation of OR time to medical specialties. The main limitations of their work are the lack of investigation of the empirical behaviour of the proposed mathematical models and related solution approaches, and the lack of illustration of the applicability of their research thorough testing phase.However, both Gupta [20] and Dexter et al. [22] did not consider any other resources rather than the OR. They excluded other resources such as ward beds and nurses.
Most recently, Fügener [21] used stochastic patient paths to link case mix decisions with the design of an MSS while considering the stochastic downstream resource demand for the ICUs and general patient wards. Demand for these resources is modeled by a stochastic patient path model. They applied an integer programming model to provide the optimal allocation of how many (strategic planning problem) and what (tactical planning problem) OR blocks to assign to each medical specialty. However, he excluded nurses capacity from his proposed model.
As a conclusion from the CMP literature review, there are two main issues. The first one is related to the limited number of capacity constraints that has been considered. Usually such constraints were considered the ORs time, beds, and the ICU. Although nursing services account for an important part of a hospitals’ annual operating budget, nurse capacity constraints have received limited interest in CMP literature. To the best of our knowledge, and as indicated by Guerriero and Guido [8] and most recently by Hof et al.[10], there is a lack in the literature regarding the CMP under the consideration of nurse workforce capacity constraints. This emphasises the need to consider nursing staff workforce capacity constraints while representing the CMP. The second issue is related to uncertainty in demand and in surgery operations. Usually the CMP was solved by following a deterministic approach. To the best of our knowledge, and as indicated by Guerriero and Guido [8] and most recently by Hof et al. [10], there is a lack in the literature regarding the CMP with uncertainty in demand and uncertain surgery operations.
The CMP will be addressed under uncertain surgery operations, which includes uncertainty in surgery durations, length of stay, surgery demand and the availability of nurses. In order to obtain an optimal case-mix plan, a stochastic optimization model is proposed. To sum up, this paper contributes in applying the SAA approach on the CMP with the two aspects of uncertain surgery operations and nurse staff capacity. This research is motivated from the very limited literature on the CMP with those two aspects. Furthermore, there is a practical need supporting the academic needs for conducting this research.
3 The proposed mathematical model
In this research, a stochastic mixed integer linear programming model to address the CMP with uncertainty in surgery operations and daily nurse capacity is proposed. As discussed above, the CMP is concerned with the decision of selecting an optimal case-mix under given capacities and other constraints. Even though some other factors, such as the time of day and day of week, might be important in managing the ORs, these factors are usually considered in the more detailed plans. These detailed plans are constructed in the following levels such as the MSSP and the operational SSP. The CMP is mainly a resource allocation problem. Thus, these factors are out of the scope of this paper.
The considered CMP consists of determining how ORs times are assigned to surgeon groups, how many beds are allocated to each ward and how many patients from each category can be taken care of over the course of one week as presented by Testi et al. [4]. Because the solution of the CMP was considered as a constraint for the two lower level problems, the MSSP and the SSP, the same time window was used as one week.
Notation summary
| Indices | |
| p∈P | Index of patient category. |
| ξ∈Ξ | Index of scenario. |
| Parameters | |
| Φ(ξ) | The corresponding probability of scenario ξ. |
| o p | The corresponding weighting factor of patient category p. |
| C y p | The current/historical dedicated hours for patient category p (hours). |
| 6 W L p | The average waiting list of patient category p (surgery cases/week). |
| \(\bar {T}_{p}\) | The average surgery duration time for patient of category p (hours). |
| A | The target activity which is the target number of surgery cases over all patient categories (surgery cases/week). |
| \(T_{p}^{\xi }\) | The surgery duration time for patient of category p in scenario ξ (hours). |
| TT | The total number of ORs’ available working hours per week (hours/week). |
| \(L_{p}^{\xi }\) | The length of stay for patient of category p in scenario ξ (days). |
| D | Working days per week (days/week). |
| TB | The total number of beds available for all patient categories (beds). |
| S | The standard number of nurses required to serve one patient in ORs (nurse/patient). |
| N D ξ | The available number of nurses per day in scenario ξ (nurses/day). |
| H | Working hours per day (hours/day). |
| BU | Maximum beds utilization. |
| NU | Maximum nurses utilization. |
| \(UB_{p}^{\xi }\) | The upper bound on the number of patients of category p per week in scenario ξ (surgery cases/week). |
| \(LB_{p}^{\xi }\) | The lower bound on the number of patients of category p per week in scenario ξ (surgery cases/week). |
| Decision variables | |
| \(x_{p}^{\xi }\) | Number of patients who receive surgery of patient category p under scenario ξ (surgery cases/week). |
| y p | Number of OR hours dedicated to surgeon group who serve patient category p (hours/week). |
| z p | Number of beds assigned to patient category p (beds). |
Three resources have to be allocated, namely, the OR time, the beds and the nurses. Let P be a set of patient categories, for each patient category p∈P we associate the integer variable (x p ) to the number of patients that receive surgery in each patient category, the real variable (y p ) to the number of OR hours dedicated to each of surgeon group, and the integer variable (z p ) to the number of beds assigned to each patient category.
The randomness in surgery operations is denoted by a scenario ξ. A scenario defines the vector of outcomes of the parameters: surgery duration, LOS, surgery demand, and nurses capacity. Let Φ(ξ) be the corresponding probability of scenario ξ∈Ξ, and \({\sum }_{\xi \in {\Xi }} {\Phi }(\xi )\)=1. It should be mentioned that the probability distribution of Φ(ξ) is discrete, and the scenario set Ξ is finite.
For each patient category p∈P and each scenario ξ∈Ξ, the surgery duration and the LOS are represented by \(T_{p}^{\xi }\) and \(L_{p}^{\xi }\), respectively. Practically, surgery duration \(T_{p}^{\xi }\) depends on a procedure type and surgery team. For explicit representation, the parameter \(T_{p}^{\xi }\) can be redefined as \(T_{pq}^{\xi }\), where q indexes Q procedure types or Q surgery teams. However, this paper uses \(T_{p}^{\xi }\) instead of \(T_{pq}^{\xi }\) for simplification. Because the CMP is mainly a strategic and capacity planning problem, such details could be considered in the more detailled planing levels (MSSP and SSP). It is assumed that \(T_{p}^{\xi }\) is identical for the same patient category. N D ξ represents the available number of nurses in the day under the scenario ξ. The surgery demand randomness is represented by two parameters called the upper and lower demand limits. For each patient category p∈P and each scenario ξ∈Ξ, these two parameters are represented by \(UB_{p}^{\xi }\) and \(LB_{p}^{\xi }\), respectively. Here, for each scenario ξ∈Ξ, the value of the decision variable (x p ) depends on the randomness and is represented by (\(x_{p}^{\xi }\)).
The objective function (1) aims to maximize the weighted sum of the number of surgery cases that could be served by each patient category. As previously mentioned, there are three resources, namely the ORs time, beds and nurses, considered in the model. The constraints are classified into four groups: ORs time capacity constraints (2) and (3), beds capacity constraints (4) and (5), nurses’ capacity constraint (6) and demand bounds constraints (7) and (8). Constraint (2) indicates that the total required surgery time for each patient category cannot exceed the assigned hours to this patient category. Constraint (3) guarantees that the total hours dedicated to all patient categories cannot exceed the ORs’ total available working hours per week. Constraint (4) denotes that the bed occupancy for each of patient categories cannot exceed its allocated capacity. The maximum total capacity that can be allocated to a patient category is z p ⋅ D. However,this is an overestimation,because it does not consider the intermediate cleaning and idle time between patients. Therefore, we multiply the maximum total capacity by BU. The value of BU should be selected carefully in order not to overload beds. Constraint (5) ensures that the total number of beds dedicated to all patient categories cannot exceed the total available beds. Constraint (6) guarantees that the total required nurses’ capacity in man-hours per week cannot exceed the available number of nurses in man-hours per week. The maximum total available number of nurses in man-hours per week that can be allocated is H ⋅ D ⋅ N D. However,this is an overestimation,because it does not consider the intermediate idle time between to consecutive patients. Therefore, we multiply the maximum total capacity by NU. The value of NU should be selected carefully in order not to overload nurses. Constraints (7) and (8) ensures that the obtained case-mix will be within the upper and lower expected demand respectively, and finally, constraints (9) and (10) reflect the integer and real properties of the decision variables respectively.
Under certain conditions, the proposed model can be formulated in a closed form and hence an exact solution can be obtained. These conditions include the guarantee of: small problem size, and the stochastic parameters should be following the normal or uniform distributions. If the problem size gets larger, the closed form model is intractable. Furthermore, it is well known that the distribution of surgery duration is close to a lognormal distribution [29]. While there are computational benefits, due to the limitations of the closed form expression, this paper employs the SAA approach as a solution method.
4 Solution method using sample average approximation
5 Implementation of the proposed method
5.1 Case study data
In this section, an application of the proposed method based on real data collected at the surgery department in Karmoze Hospital, a non-profit hospital located in Alexandria, Egypt, is presented. The data used in this paper is collected based on database records and information derived through interviews with hospital’s surgery suites managers and staff. There are nine patient categories (|P|=9): General surgery-A (GS-A), General surgery-B (GS-B), General surgery-C (GS-C), Gynecology, Maxillofacial, Orthopedics, Otolaryngology, Urology, and Vascular. The surgery department in Karmoze hospital consists of three surgery suites, each of them consists of three ORs, with a total of nine ORs (identical ORs). The hospital includes many wards with 302 beds but only 178 beds are dedicated to the surgery department. The operating rooms are available Saturday through Thursday for 5 hours daily (from 9:00 AM to 2:00 PM). In total, the working hours for the ORs (TT) are 270 hours per week. In order to obtain the discrete distribution of surgery duration, LOS and surgery demand the actual data of surgery procedures is compiled and analyzed from ORs database from 2010 to 2012.
In order to obtain the discrete distribution of surgery duration, the actual data of surgery procedures is analyzed. Most distributions we derived from the data analysis are consistent with empirical studies by May et al. [29] and Spangler et al. [32] which conclude that a lognormal distribution fits in actual surgery durations. We assume that all patients in the same patient category follow identical distribution of surgery duration.
The average LOS in General surgery-A (GS-A), General surgery-B (GS-B), General surgery-C (GS-C), Gynecology, Maxillofacial, Orthopedics, Otolaryngology, Urology, and Vascular are 2.5 days, 2.5 days, 1.8 days, 1.5 days, 2.5 days, 2.25 days, 1.75 days, 3.0 days and 4.8 days, respectively. In order to obtain the discrete distribution of LOS, the actual data of surgery cases is analyzed. The distributions we derive from the data analysis are either Normal or Lognormal based on patient category. However the LOS may depend on the surgery duration, in this paper we assume that the relation between both of them is an uncontrolable part on the data.
Due to the random absence and vacations of the nurses, there is a significant variation in the daily number of available nurses. According to the ORs records, the available number of nurses per day (N D n ) ranges between 14 and 19 according to a uniform distribution.
Histogram for the total weekly demand
Box-plots for the weekly demand for each patient category
5.2 Experimental results
The mathematical model (11)–(20) describes the SAA problem of the SCMP is solved optimally with the commercial ILP solver LINGO 12.0 (LINDO Systems Inc.). All tests were run on an Intel Core i5 (2.6 GHz) with 4 GB of RAM, running under Windows 7.
In order to discuss the stability and robustness of the proposed stochastic model with respect to uncertainty, a sensitivity analysis for the number of scenarios is conducted. In this analysis the trade-off between sample size N and the quality of the solution is considered. First, the SCMP is solved at different number of sample sizes, (N =1, 5, 10, 20, 30, 40, 50, 100, 150, and 200). At each sample size five replications are conducted (M= 5).
Convergence of the objective function value
Numerical experiments procedure
The dotted line in Fig. 3 indicates the solution obtained by the Expected Value Parameters (EVP) of the corresponding stochastic problem. The solution of EVP is obtained by replacing the random parameters \({T_{p}^{n}}\), \({L_{p}^{n}}\), \(U{B_{p}^{n}}\), \(L{B_{p}^{n}}\) and N D n by their means and then solving the resulting deterministic problem [33]. The result shows that, compared to the SAA problem, the deterministic problem produced a poor solution. Numerical experiments are performed to evaluate the value of the stochastic optimization compared to the deterministic EVP. A detailed result is shown in the next section.
As ORs’ capacity and nurses’ capacity are two of the most critical surgical resources at any operating theatre, the proposed model is solved at different levels of ORs and nurses available capacities. The purpose of this analysis is to investigate the effect of varying the availability of both ORs and nurses on the overall performance. The comparisons are conducted in terms of the Number of Surgery Cases (NSCs), the ORs’ activity index and the model objective function score.
Effects of ORs capacity
| ORs | NSCs | ORs’ activity | Average objective value |
|---|---|---|---|
| 9 ORs | 288 | 0.96 | 34.61 |
| 8 ORs | 288 | 0.96 | 34.61 |
| 7 ORs | 259 | 0.86 | 31.15 |
Effects of ORs capacity
| Nurses | NSCs | ORs’ activity | Average objective value |
|---|---|---|---|
| ND | 288 | 0.96 | 34.61 |
| ND+2 | 303 | 1.01 | 37.19 |
| ND+4 | 313 | 1.04 | 38.55 |
In summary, the number of ORs can be reduced by one without any negative effect. Also, it can be seen that increasing the daily number of nurses by two and up to four enhances the overall ORs performance.
5.3 Evaluation of stochastic solutions
Numerical experiments are performed to compare two solutions which are obtained from the stochastic optimization problem (Stochastic) and the deterministic expected value problem (EVP). The comparison aims at evaluating the benefit of the stochastic model over its computational efforts. From the results, we claim that the stochastic model provides a better solution than EVP in terms of the robustness to the randomness in surgery operations.
Evaluation results: number of overcapacity cases
Summary of the evaluation performance measures
| Number of overcapacity occurrences (times) | Average number of overcapacity per scenario (cases) | |
|---|---|---|
| Stochastic | 34 | 11 |
| EVP | 79 | 21 |
6 Conclusions and recommendations
This study proposed a stochastic optimization model for the case-mix problem with considering nurses capacity constraints. To the best of our knowledge, this is the first time to attempt this problem. The sample average approximation algorithm is employed to solve the problem. Numerical experiments demonstrated the convergence of statistical bounds with moderate sample size for a given test problem. Finally, numerical experiments were conducted to show that the stochastic model solution outperforms the Expected Value Problem solution.
The optimal case-mix selction criterion is based upon a weighted score taking into account both the waiting list and the historical demand of each patient category. The score aims to maximizing the service level of the ORs by increasing the total NSCs that could be served.The optimal amount of ORs’ time and and the optimal number of ward beds dedicated to each patient category were determined. The proposed model was solved under three resource capacity constraints: ORs’ time, beds and nurses. Future work will be done on building a new time table based on the proposed case-mix plan through solving the MSSP. Then testing these proposed plans in the operational level by solving the SSP. Finally trying to integrate these three models together in order to obtain a more tunned solution.
Notes
Acknowledgments
This research project is sponsored by the Egyptian ministry of higher education grant and the Japanese International Cooperation Agency (JICA) in the scope of the Egypt Japan University of Science and Technology (E-JUST). The authors wish to thank the managers and all the Operating Rooms staff of Karmoze Hospital, Alexandria, Egypt for their support to this work and for providing the case study data. Furthermore, the authors would like to thank the three anonymous referees for their valuable comments which have helped in improving the quality of this paper.
References
- 1.Dey PK, Hariharan S, Brookes N (2006) Managing healthcare quality using logical framework analysis. Manag Serv Qual An Int J 16:203–222CrossRefGoogle Scholar
- 2.Association HFM (2003) Others Achieving operating room efficiency through process integration. Healthc Financ Manag J Healthc Financ Manag Assoc 57:suppl–1Google Scholar
- 3.Ma G, Demeulemeester E (2013) A multilevel integrative approach to hospital case mix and capacity planning. Comput Oper Res 40:2198–2207CrossRefGoogle Scholar
- 4.Testi A, Tanfani E, Torre G (2007) A three-phase approach for operating theatre schedules. Health Care Manag Sci 10:163–172CrossRefGoogle Scholar
- 5.Simon HA (1960) The new science of management decision. Harper & Row, New York, p 27CrossRefGoogle Scholar
- 6.Ulrich CM, Wallen G, Grady C, et al. (2002) The nursing shortage and the quality of care. N Engl J Med 347:1118–1119Google Scholar
- 7.Beliën J, Demeulemeester E (2008) A branch-and-price approach for integrating nurse and surgery scheduling. Eur J Oper Res 189:652–668CrossRefGoogle Scholar
- 8.Guerriero F, Guido R (2011) Operational research in the management of the operating theatre: a survey. Health Care Manag Sci 14:89–114CrossRefGoogle Scholar
- 9.Abdelrasol ZY, Harraz N, Eltawil A (2013) A Proposed Solution Framework for the Operating Room Scheduling Problems. In: Proceedings of the World Congress on Engineering and Computer Science 2013 (Vol II), San Francisco USA, 23–25Google Scholar
- 10.Hof S, Fügener A, Schoenfelder J, Brunner JO (2015) A research agenda for case mix planning in hospitals. Available under. http://ssrn.com/abstract=2588498
- 11.Cardoen B, Demeulemeester E, Beliën J (2010) Operating room planning and scheduling: A literature review. Eur J Oper Res 201:921–932CrossRefGoogle Scholar
- 12.Abdelrasol Z, Harraz N, Eltawil A (2014) Operating Room Scheduling Problems: A Survey and a Proposed Solution Framework. Trans Eng Technol Springer:717–731Google Scholar
- 13.Calichman MV (2005) Creating an optimal operating room schedule. AORN Journal 81:580–588CrossRefGoogle Scholar
- 14.Dexter F, Blake JT, Penning DH, Lubarsky DA (2002a) Calculating a potential increase in hospital margin for elective surgery by changing operating room time allocations or increasing nursing staffing to permit completion of more cases: a case study. Anesth Analg 94:138–142Google Scholar
- 15.Ma G, Beliën J, Demeulemeester E, Wang L (2009) Solving the strategic case mix problem optimally by using branch-and-price algorithms. In: On proceedings of the 35th International Conference on Operational Research Applied to Health Services (ORAHS), Belgium, p 2009Google Scholar
- 16.Dexter F, Blake JT, Penning DH, Sloan B, Chung P, Lubarsky DA (2002b) Use of linear programming to estimate impact of changes in a hospitals operating room time allocation on perioperative variable costs. Anesthesiology 96:718–724CrossRefGoogle Scholar
- 17.Blake JT, Carter MW (2002) A goal programming approach to strategic resource allocation in acute care hospitals. Eur J Oper Res 140:541–561CrossRefGoogle Scholar
- 18.Mulholland MW, Abrahamse P, Bahl V (2005) Linear programming to optimize performance in a department of surgery. J Am Coll Surg 200:861–868CrossRefGoogle Scholar
- 19.Kuo PC, Schroeder RA, Mahaffey S, Bollinger RR (2003) Optimization of operating room allocation using linear programming techniques. J Am Coll Surg 197:889–895CrossRefGoogle Scholar
- 20.Gupta D (2007) Surgical suites operations management. Prod Oper Manag 16:689–700CrossRefGoogle Scholar
- 21.Fügener A (2015) An integrated strategic and tactical master surgery scheduling approach with stochastic resource demand. J Bus Logist. doi: 10.2139/ssrn.2586684
- 22.Dexter F, Ledolter J, Wachtel RE (2005) Tactical decision making for selective expansion of operating room resources incorporating financial criteria and uncertainty in subspecialties future workloads. Anesth Analg 100:1425–1432CrossRefGoogle Scholar
- 23.Feldstein M (1967) Economic analysis for health service efficiency: Econometric studies of the British National Health Service. North-Holland Publishing Company, AmsterdamGoogle Scholar
- 24.Dowling WL (1976) Hospital production: A linear programming model. Lexington Books, LexingtonGoogle Scholar
- 25.Hughes WL, Soliman SY (1985) Short-term case mix management with linear programming. Hosp Health Serv Adm 30:52–60Google Scholar
- 26.Robbins WA, Tuntiwongpiboom N (1989) Linear programming a useful tool in casemix management. Healthc Financ Manag J 43:114–116Google Scholar
- 27.Rifai AK, Pecenka JO (1990) An application of goal programming in healthcare planning. Int J Oper Prod Man 10:28–37CrossRefGoogle Scholar
- 28.Meyer GC, Taylor JW, Damewood EZ (1992) Using the operations management modeling technique of linear programming to determine optimal case mix of three cardiac services. J Cardiop Rehab and Prevent 12:407–412CrossRefGoogle Scholar
- 29.May JH, Strum DP, Vargas LG (2000) Fitting the Lognormal Distribution to Surgical Procedure Times. Decis Sci 31:129– 148CrossRefGoogle Scholar
- 30.Shapiro A, Homem-de-Mello T, Kim J (2002) Conditioning of convex piecewise linear stochastic programs. Math Program 94:1–19CrossRefGoogle Scholar
- 31.Shapiro A, Homem-de-Mello T (2000) On the rate of convergence of optimal solutions of Monte Carlo approximations of stochastic programs. SIAM J Optim 11:70–86CrossRefGoogle Scholar
- 32.Spangler WE, Strum DP, Vargas LG, May JH (2004) Estimating procedure times for surgeries by determining location parameters for the lognormal model. Health Care Manag Sci 7:97–104CrossRefGoogle Scholar
- 33.Min D, Yih Y (2010) Scheduling elective surgery under uncertainty and downstream capacity constraints. Eur J Oper Res 206:642–652CrossRefGoogle Scholar
- 34.Haddock J, Rodriguez M (1985) Modelling a product-mix determination problem. Appl Math Model 9:370–374CrossRefGoogle Scholar
- 35.Macario A (2010) What does one minute of operating room time cost J Clin Anesth 22:233–236CrossRefGoogle Scholar
- 36.Weinbroum AA, Ekstein P, Ezri T (2003) Efficiency of the operating room suite. Am J Surg 185:244–250CrossRefGoogle Scholar
- 37.Brodsky J B (1998) Cost savings in the operating room. Anesthesiology 88:834–835CrossRefGoogle Scholar