Fuzzy Optimization and Decision Making

, Volume 4, Issue 2, pp 141–147 | Cite as

Single Machine Batch Scheduling Problem with Resource Dependent Setup and Processing Time in the Presence of Fuzzy Due Date

  • Kanthen K Harikrishnan
  • Hiroaki Ishii
Article

Abstract

We consider a batch scheduling problem on a single machine which processes jobs with resource dependent setup and processing time in the presence of fuzzy due-dates given as follows:

1. There are n independent non-preemptive and simultaneously available jobs processed on a single machine in batches. Each job j has a processing time and a due-date.

2. All jobs in a batch are completed together upon the completion of the last job in the batch. The batch processing time is equal to the sum of the processing times of its jobs. A common machine setup time is required before the processing of each batch.

3. Both the job processing times and the setup time can be compressed through allocation of a continuously divisible resource. Each job uses the same amount of the resource. Each setup also uses the same amount of the resource.

4. The due-date of each job is flexible. That is, a membership function describing non-decreasing satisfaction degree about completion time of each job is defined.

5. Under above setting, we find an optimal batch sequence and resource values such that the total weighted resource consumption is minimized subject to meeting the job due-dates, and minimal satisfaction degree about each due-date of each job is maximized. But usually we cannot optimize two objectives at a time. So we seek non-dominated pairs i.e. the batch sequence and resource value, after defining dominance between solutions.

A polynomial algorithm is constructed based on linear programming formulations of the corresponding problems.

Keywords

batching bi-criteria fuzzy due-date linear programming minimum satisfaction degree resource allocation scheduling 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Cheng, T.C.E., Kovalyov, M.Y. 1995“Single Machine Batch Scheduling with Deadlines and Resource Dependent Processing Times”Operations Research Letters21243249MathSciNetGoogle Scholar
  2. Cheng, T.C.E., Adam Janiak, , Kovalyov, M.Y. 1998“Bicriterion Single Machine Scheduling with Resource Dependent Processing Times”SIAM Journal Optimization8617630MATHGoogle Scholar
  3. Cheng, T.C.E., Adam Janiak, , Kovalyov, M.Y. 2001“Single Machine Batch Scheduling with Resource Dependent Setup and Processing Times”European Journal of Operational research135177183MATHMathSciNetGoogle Scholar
  4. Dobson, G., Karmarkar, U. S., Rummel, J. L. 1987“Batching to Minimize Flow Times on One Machine”Management Science33784799CrossRefMATHGoogle Scholar
  5. Sangsu Han, , Hiroaki Ishii, , Susumu Fujii,  1994“One Machine Scheduling Problem with Fuzzy Due-Dates”European Journal of Operational Research79112MATHGoogle Scholar
  6. Harikrishnan, Kanthen K., Ishii, H. 2001“Some Resource Constrained Scheduling Problems”Asia Pacific Management Review6477484Google Scholar
  7. Lawler, E.L., Moore, J.M. 1969A Functional Equation and its Applications to Resource Allocation and Sequencing Problems”Management Science167784MATHGoogle Scholar
  8. Muthusamy, Kanesan, Ishii, Hiroaki, Masuda, Teruo, Mohri, Shintaro 2002“Single Machine Batching Problem to Minimize the Sum o Completion Times with Number of Batches and Batch Size Limitations”Science Mathematicae Japonicae55369381MATHMathSciNetGoogle Scholar
  9. Naddef, D., Santos, C. 1988“One-Pass Batching Algorithms for the One-Machine Problem”Discrete Applied Mathematics21133145MATHMathSciNetGoogle Scholar
  10. Potts, C. N, Kovalyov, M. Y. 2000“Scheduling with Batching: A Review”European Journal of Operational Research120228249CrossRefMATHMathSciNetGoogle Scholar
  11. Shallcross, D. F. 1992“A Polynomial Algorithm for a One Machine Batching Problem”Operations Research Letters11213218MATHMathSciNetGoogle Scholar
  12. Sung, C.S., Joo., U.G. 1997“Batching to Minimize Weighted Mean Flow Time on a Single Machine with Batch Size Restrictions”Computers and Industrial Engineering32333340Google Scholar

Copyright information

© Springer Science+Business Media, Inc. 2005

Authors and Affiliations

  1. 1.Department of Operational Research, Faculty of Information Technology and Quantitative ScienceUniversity Technology MARASelangorMalaysia
  2. 2.Graduate School of Information Technology & Physical SciencesOsaka UniversityJapan

Personalised recommendations