Towards railway traffic management using switching Max-plus-linear systems

Structure analysis and rescheduling
  • Bart Kersbergen
  • János Rudan
  • Ton van den Boom
  • Bart De Schutter
Article

Abstract

In this paper we present a railway traffic model and a model predictive controller for online railway traffic management of railway networks with a periodic timetable. The main aim of the controller is to recover from delays in an optimal way by changing the departure of trains, by breaking connections, by splitting joined trains, and - in the case of multiple tracks between two stations - by redistributing the trains over the tracks. The railway system is described by a switching max-plus-linear model. We assume that measurements of current running and dwell times and estimates of future running times and dwell times are continuously available so that they can be taken into account in the optimization of the system’s control variables. The switching max-plus-linear model railway model is used to determine optimal dispatching actions, based on the prediction of the future arrival and departure times of the trains, by recasting the dispatching problem as a Mixed Integer Linear Programming (MILP) problem and solving it. Moreover, we use properties from max-plus algebra to rewrite and reduce the model such that the MILP problem can be solved in less time. We also apply the algorithm to a model of the Dutch railway network.

Keywords

Max-plus algebra Railway networks Rescheduling Model reduction MILP 

Notes

Acknowledgements

This research is supported by the Dutch Technology Foundation STW, project 11025 “Model-Predictive Railway Traffic Management; A Framework for Closed-Loop Control of Large-Scale Railway Systems”. STW is part of the Netherlands Organisation for Scientific Research (NWO), and which is partly funded by the Ministry of Economic Affairs. This research is also funded by TÁMOP-4.2.1./B-11/2/KMR-2011-002 and TÁMOP-4.2.2./B-10/1-2010-0014.

References

  1. Baccelli F, Cohen G, Olsder G, Quadrat J (1992) Synchronization and Linearity: An Algebra for Discrete Event Systems. Wiley, New YorkzbMATHGoogle Scholar
  2. Braker JG (1991) Max-algebra modelling and analysis of time-dependent transportation networks. In: Proceedings of the 1st European Control Conference. Grenoble, France, pp 1831–1836Google Scholar
  3. Braker JG (1993) An extended algorithm for performance evaluation of timed event graphs. In: Proceedings of the 2nd European Control Conference. Groningen, The Netherlands, pp 524–529Google Scholar
  4. Caimi G, Fuchsberger M, Laumanns M, Lüthi M (2012) A model predictive control approach for discrete-time rescheduling in complex central railway station areas. Comput Oper Res 39(11):2578– 2593CrossRefzbMATHGoogle Scholar
  5. Corman F, D’Ariano A, Pacciarelli D, Pranzo M (2012) Bi-objective conflict detection and resolution in railway traffic management. Transp Res Part C: Emerg Technol 20(1):79–94CrossRefGoogle Scholar
  6. Cuninghame-Green R (1979) Minimax Algebra, Lecture Notes in Economics and Mathematical Systems, vol 166. Springer, GermanyGoogle Scholar
  7. D’Ariano A, Pacciarelli D, Pranzo M (2007) A branch and bound algorithm for scheduling trains in a railway network. Euro J Oper Res 183(2):643–657CrossRefzbMATHGoogle Scholar
  8. De Schutter B, van den Boom T, Hegyi A (2002) A model predictive control approach for recovery from delays in railway systems. Transp Res Rec 1793:15–20CrossRefGoogle Scholar
  9. GLPK (2014) Gnu linear programming kit. http://www.gnu.org/software/glpk/
  10. Goverde RMP (2007) Railway timetable stability analysis using max-plus system theory. Transp Res B Methodol 41(2):179–201CrossRefGoogle Scholar
  11. Goverde RMP (2010) A delay propagation algorithm for large-scale railway traffic networks. Transp Res Part C: Emerg Technol 18(3):269–287CrossRefGoogle Scholar
  12. Gurobi (2014) Gurobi optimizer reference manual. http://www.gurobi.com
  13. Hansen IA, Pachl J (2008) Railway Timetable & Traffic: Analysis - Modelling - Simulation. Eurailpress, GermanyGoogle Scholar
  14. Heidergott B, Vries R (2001) Towards a (max,+) control theory for public transportation networks. Discret Event Dyn Syst 11(4):371–398MathSciNetCrossRefzbMATHGoogle Scholar
  15. Heidergott B, Olsder GJ, van der Woude J (2006) Max Plus at Work: Modeling and Analysis of Synchronized Systems: A Course on Max-Plus Algebra and Its Applications. Princeton Series in Applied Mathematics. Princeton University Press, PrincetonzbMATHGoogle Scholar
  16. Kecman P, Corman F, D’Ariano A, Goverde RM (2013) Rescheduling models for railway traffic management in large-scale networks. Public Transport 5(1-2):95–123CrossRefGoogle Scholar
  17. Kersbergen B, van den Boom TJJ, De Schutter B (2013a) On implicit versus explicit max-plus modeling for the rescheduling of trains. Denmark, CopenhagenGoogle Scholar
  18. Kersbergen B, van den Boom TJJ, De Schutter B (2013b) Reducing the time needed to solve the global rescheduling problem for railway networks. The Hague, The NetherlandsCrossRefGoogle Scholar
  19. Kroon LG, Peeters LWP (2003) A variable trip time model for cyclic railway timetabling. Transp Sci 37(2):198–212CrossRefGoogle Scholar
  20. Minciardi R, Paolucci M, Pesenti R (1995) Generating optimal schedules for an underground railway line. In: Proceedings of the 34th IEEE Conference on Decision and Control, New Orleans, Louisiana, pp 4082–4085Google Scholar
  21. TOMLAB (2014) Tomlab optimization environment. http://tomopt.com/tomlab/
  22. Törnquist Krasemann J (2012) Design of an effective algorithm for fast response to the re-scheduling of railway traffic during disturbances. Transp Res Part C: Emerg Technol 20(1):62–78CrossRefGoogle Scholar
  23. van den Boom TJJ, De Schutter B (2006) Modelling and control of discrete event systems using switching max-plus-linear systems. Control Eng Pract 14(10):1199–1211CrossRefGoogle Scholar
  24. van den Boom TJJ, Weiss N, Leune W, Goverde RMP, De Schutter B (2011) A permutation-based algorithm to optimally reschedule trains in a railway traffic network. In: Proceedings of the 18th IFAC World Congres, Milan, ItalyGoogle Scholar
  25. van den Boom TJJ, Kersbergen B, De Schutter B (2012) Structured modeling, analysis, and control of complex railway operations, In: Proceedings of the 51st IEEE Conference on Decision and Control, Maui, HawaiiGoogle Scholar
  26. de Vries R, De Schutter B, De Moor B (1998) On max-algebraic models for transportation networks, In: Proceedings of the 4th International Workshop on Discrete Event Systems (WODES’98) Cagliari, ItalyGoogle Scholar
  27. de Waal P, Overkamp A, van Schuppen J H (1997) Control of railway traffic on a single line. In: Proceedings of the European Control Conference (ECC’97), Brussels, Belgium, paper, 230Google Scholar

Copyright information

© Springer Science+Business Media New York 2014

Authors and Affiliations

  • Bart Kersbergen
    • 1
  • János Rudan
    • 2
  • Ton van den Boom
    • 1
  • Bart De Schutter
    • 1
  1. 1.Delft Center for Systems and ControlDelft University of TechnologyDelftThe Netherlands
  2. 2.Faculty of Information TechnologyPázmány Péter Catholic UniversityBudapestHungary

Personalised recommendations