A multi-stage stochastic programming model of lot-sizing and scheduling problems with machine eligibilities and sequence-dependent setups

  • Sheng-I ChenEmail author
  • Delvinia Su
S.I.: Reliability Modeling with Applications Based on Big Data
  • 33 Downloads

Abstract

We focus on the lot-sizing and scheduling problem with the additional considerations of machine eligibility, sequence-dependent setups, and uncertain demands. Multi-stage stochastic programming is proposed. We analyze the problem structure and suggest ways for modeling and solving large-scale stochastic integer programs. The analysis compares deterministic and stochastic model solutions to assess demand variance effects under the circumstances of increasing, fluctuating, and decreasing demands. The result shows that the expected cost performance of the stochastic programming model outperforms that of the deterministic model, in particular, when the demand is highly uncertain in the circumstance of an upward market trend. Our study can apply to the wafer fab manufacturing and other industries that heavily restricted by machine eligibility and demand uncertainties.

Keywords

Lot-sizing and scheduling Sequence-dependent setups Machine eligibility Multi-stage stochastic programming 

Notes

Funding

This work was supported by the Ministry of Science and Technology, Taiwan (https://www.most.gov.tw/) under Grants MOST 106-2221-E-009-114- MY2 and MOST 108-2221-E-009-029 -.

References

  1. Babaei, M., Mohammadi, M., & Fatemi Ghomia, S. M. T. (2014). A genetic algorithm for the simultaneous lot sizing and scheduling problem in capacitated flow shop with complex setups and backlogging. The International Journal of Advanced Manufacturing Technology,70(1–4), 125–134.CrossRefGoogle Scholar
  2. Birge, J. R. (1985). Decomposition and partitioning methods for multistage stochastic linear programs. Operations Research,33(5), 989–1007.CrossRefGoogle Scholar
  3. Birge, J. R., & Louveaux, F. (2011). Introduction to stochastic programming. Berlin: Springer.CrossRefGoogle Scholar
  4. Brandimarte, P. (2006). Multi-item capacitated lot-sizing with demand uncertainty. International Journal of Production Research,44(15), 2997–3022.CrossRefGoogle Scholar
  5. Clark, A., Mahdieh, M., & Rangel, S. (2014). Production lot sizing and scheduling with non-triangular sequence-dependent setup times. International Journal of Production Research,52(8), 2490–2503.CrossRefGoogle Scholar
  6. Copil, K., Wörbelauer, M., Meyr, H., & Tempelmeier, H. (2017). Simultaneous lotsizing and scheduling problems: a classification and review of models. OR Spectrum,39(1), 1–64.CrossRefGoogle Scholar
  7. Escudero, L. F., Kamesam, P. V., King, A. J., & Wets, R. J.-B. (1993). Production planning via scenario modelling. Annals of Operations Research,43(6), 309–335.CrossRefGoogle Scholar
  8. Fleischmann, B., & Meyr, H. (1997). The general lotsizing and scheduling problem. OR Spectrum,19(1), 11–21.CrossRefGoogle Scholar
  9. Guimarães, L., Klabjan, D., & Almada-Lobo, B. (2014). Modeling lotsizing and scheduling problems with sequence dependent setups. European Journal of Operational Research,239(3), 644–662.CrossRefGoogle Scholar
  10. Gupta, D., & Magnusson, T. (2005). The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times. Computers & Operations Research,32(4), 727–747.CrossRefGoogle Scholar
  11. Haase, K. (1996). Capacitated lot-sizing with sequence dependent setup costs. OR Spectrum,18, 51–59.CrossRefGoogle Scholar
  12. Haase, K. (2012). Lecture notes in economics and mathematical systems. Berlin: Springer.Google Scholar
  13. Ho, C. J. (1989). Evaluating the impact of operating environments on MRP system nervousness. The International Journal of Production Research,27(7), 1115–1135.CrossRefGoogle Scholar
  14. Hu, Z., & Hu, G. (2016). A two-stage stochastic programming model for lot-sizing and scheduling under uncertainty. International Journal of Production Economics,180, 198–207.CrossRefGoogle Scholar
  15. Karimi, B., Fatemi Ghomia, S. M. T., & Wilson, J. M. (2003). The capacitated lot sizing problem: A review of models and algorithms. Omega,31(5), 365–378.CrossRefGoogle Scholar
  16. Lee, K., Leung, J. Y., & Pinedo, M. L. (2013). Makespan minimization in online scheduling with machine eligibility. Annals of Operations Research,204, 189–222.CrossRefGoogle Scholar
  17. Li, Y., & Hu, G. (2017). Shop floor lot-sizing and scheduling with a two-stage stochastic programming model considering uncertain demand and workforce efficiency. Computers & Industrial Engineering,111, 263–271.CrossRefGoogle Scholar
  18. Madansky, A. (1960). Inequalities for stochastic linear programming problems. Management Science,6(2), 197–204.CrossRefGoogle Scholar
  19. Miller, C. E., Tucker, A. W., & Zemlin, R. A. (1960). Integer programming formulation of traveling salesman problems. Journal of the ACM,7(4), 326–329.CrossRefGoogle Scholar
  20. Ramezanian, R., & Saidi-Mehrabad, M. (2013). Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system. Applied Mathematical Modelling,37(7), 5134–5147.CrossRefGoogle Scholar
  21. Rockafellar, R. T., & Wets, R. J.-B. (1991). Scenario and policy aggregation in optimization under uncertainty. Mathematics of Operations Research,16, 119–147.CrossRefGoogle Scholar
  22. Shapiro, A., Dentcheva, D., & Ruszczyński, A. (2009). Lectures on stochastic programming: modeling and theory. Philadelphia: Society for Industrial and Applied Mathematics.CrossRefGoogle Scholar
  23. Suerie, C. (2006). Modeling of period overlapping setup times. European Journal of Operational Research,174, 874–886.CrossRefGoogle Scholar
  24. Valente, C., Mitra, G., Sadki, M., & Fourer, R. (2009). Extending algebraic modelling languages for stochastic programming. INFORMS Journal on Computing,21(1), 107–122.CrossRefGoogle Scholar
  25. Wolsey, L. A. (1997). MIP modelling of changeovers in production planning and scheduling problems. European Journal of Operational Research,99(1), 154–165.CrossRefGoogle Scholar
  26. Xiao, J., Yang, H., Zhang, C., Zheng, L., & Gupta, J. N. (2015). A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times. Computers & Operations Research,63, 72–82.CrossRefGoogle Scholar
  27. Xiao, J., Zhang, C., Zheng, L., & Gupta, J. N. (2013). MIP-based fix-and-optimise algorithms for the parallel machine capacitated lot-sizing and scheduling problem. International Journal of Production Research,51(16), 5011–5028.CrossRefGoogle Scholar
  28. Zanjani, M. K., Nourelfath, M., & Ait-Kadi, D. (2010). A multi-stage stochastic programming approach for production planning with uncertainty in the quality of raw materials and demand. International Journal of Production Research,48(16), 4701–4723.CrossRefGoogle Scholar
  29. Zhang, X., Prajapati, M., & Peden, E. (2011). A stochastic production planning model under uncertain seasonal demand and market growth. International Journal of Production Research,49(7), 1957–1975.CrossRefGoogle Scholar

Copyright information

© Springer Science+Business Media, LLC, part of Springer Nature 2019

Authors and Affiliations

  1. 1.Department of Industrial Engineering and ManagementNational Chiao Tung UniversityHsinchuTaiwan

Personalised recommendations