Evaluating shortfall distributions in periodic inventory systems with stochastic endogenous demands and lead-times

  • Hernan Caceres
  • Dongchen Yu
  • Alexander Nikolaev
Original Research
  • 173 Downloads

Abstract

This paper addresses a multi-period production/inventory problem with two suppliers, where demand sizes and supplier lead time are stochastic and correlated. A discrete time, single item inventory system is considered, where inventory levels are reviewed periodically and managed using a base-stock policy. At the end of each period, a replenishment order is placed, which enters a queue at the buffer stage and is consequently forwarded to the first available supplier. We present a mathematical model of this inventory system and determine optimal safety stock levels for it, in closed form, using matrix analytic techniques and the properties of phase type distributions. To account for the effect of order crossovers, which occur whenever replenishment orders do not arrive in the sequence in which they were placed, the inventory shortfall distribution is analyzed. Finally, a set of numerical experiments with a system with two suppliers is presented, where the proposed model is compared to other existing models.

Keywords

Production planning Safety stocks Markov modeling Shortfall Phase type distribution 

References

  1. Bell, C. E. (1980). Optimal operation of an M/M/2 queue with removable servers. Operations Research, 28(5), 1189–1204.CrossRefGoogle Scholar
  2. Betts, J. M. (2014). Calculating target inventory levels for constrained production: A fast simulation-based approximation. Computers and Operations Research, 49, 18–27.CrossRefGoogle Scholar
  3. Bobbio, A., Horváth, A., Scarpa, M., & Telek, M. (2003). Acyclic discrete phase type distributions: Properties and a parameter estimation algorithm. Performance evaluation, 54(1), 1–32.CrossRefGoogle Scholar
  4. Boute, R. N., Lambrecht, M. R., & Van Houdt, B. (2007). Performance evaluation of a production/inventory system with periodic review and endogenous lead times. Naval Research Logistics (NRL), 54(4), 462–473.CrossRefGoogle Scholar
  5. Boute, R. N., Colen, P. J., Creemers, S., Noblesse, A., Van Houdt, B., et al. (2012). Matrix-analytic methods in supply chain management: Recent developments. Review of Business and Economic Literature, 57(3), 283–302.Google Scholar
  6. Boute, R. N., Disney, S. M., Lambrecht, M. R., & Houdt, B. V. (2014). Coordinating lead times and safety stocks under autocorrelated demand. European Journal of Operational Research, 232(1), 52–63.CrossRefGoogle Scholar
  7. Bradley, J. R., & Robinson, L. W. (2003) Improved base-stock policies under order crossover. Tech. rep., Working Paper. Cornell University.Google Scholar
  8. Brill, P. H., & Posner, M. J. M. (1981). A two server queue with nonwaiting customers receiving specialized service. Management Science, 27(8), 914–925.  https://doi.org/10.1287/mnsc.27.8.914.CrossRefGoogle Scholar
  9. Chakravarthy, S. R., & Agnihothri, S. R. (2008). A server backup model with Markovian arrivals and phase type services. European Journal of Operational Research, 184(2), 584–609.  https://doi.org/10.1016/j.ejor.2006.12.016.CrossRefGoogle Scholar
  10. Chakravarthy, S. R., & Karatza, H. D. (2013). Two-server parallel system with pure space sharing and Markovian arrivals. Computers and Operations Research, 40(1), 510–519.  https://doi.org/10.1016/j.cor.2012.08.002.CrossRefGoogle Scholar
  11. Chopra, S., Reinhardt, G., & Dada, M. (2004). The effect of lead time uncertainty on safety stocks. Decision Sciences, 35(1), 1–24.CrossRefGoogle Scholar
  12. Clark, A. J., & Scarf, H. (1960). Optimal policies for a multi-echelon inventory problem. Management science, 6(4), 475–490.CrossRefGoogle Scholar
  13. Dabbene, F., Gay, P., & Tortia, C. (2014). Traceability issues in food supply chain management: A review. Biosystems Engineering, 120, 65–80.  https://doi.org/10.1016/j.biosystemseng.2013.09.006.CrossRefGoogle Scholar
  14. De Toni, A. (1999). Buyer–supplier operational practices, sourcing policies and plant performances: Results of an empirical research. International Journal of Production Research, 37(3), 597–619.CrossRefGoogle Scholar
  15. Dolgui, A., Ammar, O. B., Hnaien, F., & Louly, M. A. (2013). A state of the art on supply planning and inventory control under lead time uncertainty. Studies in Informatics and Control, 22(3), 255–268.CrossRefGoogle Scholar
  16. Federgruen, A., & Zipkin, P. (1986). An inventory model with limited production capacity and uncertain demands I. The average-cost criterion. Mathematics of Operations Research, 11(2), 193–207.CrossRefGoogle Scholar
  17. Filippopoulos, D., & Karatza, H. (2007). An M/M/2 parallel system model with pure space sharing among rigid jobs. Mathematical and Computer Modelling, 45(5), 491–530.  https://doi.org/10.1016/j.mcm.2006.06.007.CrossRefGoogle Scholar
  18. Froehle, C. M., & White, D. L. (2014). Interruption and forgetting in knowledge-intensive service environments. Production and Operations Management, 23(4), 704–722.  https://doi.org/10.1111/poms.12089.CrossRefGoogle Scholar
  19. Glasserman, P., & Tayur, S. (1996). A simple approximation for a multistage capacitated production–inventory system. Naval Research Logistics (NRL), 43(1), 41–58.CrossRefGoogle Scholar
  20. Goffin, K., Szwejczewski, M., & New, C. (1997). Managing suppliers: When fewer can mean more. International Journal of Physical Distribution & Logistics Management, 27(7), 422–436.CrossRefGoogle Scholar
  21. Hopp, W. J., & Spearman, M. L. (2000). Factory physics (2nd ed.). Long Grove: Waveland Press.Google Scholar
  22. Johnson, P. F., Leenders, M. R., & Fearon, H. E. (1998). Evolving roles and responsibilities of purchasing organizations. International Journal of Purchasing and Materials Management, 34(4), 2–11.CrossRefGoogle Scholar
  23. Katehakis, M. N., Melamed, B., & Shi, J. J. (2015). Optimal replenishment rate for inventory systems with compound Poisson demands and lost sales: A direct treatment of time-average cost. Annals of Operations Research,.  https://doi.org/10.1007/s10479-015-1998-y.CrossRefGoogle Scholar
  24. Kendall, D. G. (1953). Stochastic processes occurring in the theory of queues and their analysis by the method of the imbedded Markov chain. The Annals of Mathematical Statistics, 24, 338–354.CrossRefGoogle Scholar
  25. Kim, J. G., Chatfield, D., Harrison, T. P., & Hayya, J. C. (2006). Quantifying the bullwhip effect in a supply chain with stochastic lead time. European Journal of operational research, 173(2), 617–636.CrossRefGoogle Scholar
  26. Larsen, R. L., & Agrawala, A. K. (1983). Control of a heterogeneous two-server exponential queueing system. IEEE Transactions on Software Engineering, 9(4), 522–526.  https://doi.org/10.1109/TSE.1983.234960.CrossRefGoogle Scholar
  27. Lee, Y. J., & Zipkin, P. (1992). Tandem queues with planned inventories. Operations Research, 40(5), 936–947.CrossRefGoogle Scholar
  28. Lu, Y., Song, J. S., & Yao, D. D. (2003). Order fill rate, leadtime variability, and advance demand information in an assemble-to-order system. Operations Research, 51(2), 292–308.CrossRefGoogle Scholar
  29. Noblesse, A. M., Boute, R. N., Lambrecht, M. R., & Van Houdt, B. (2014). Lot sizing and lead time decisions in production/inventory systems. International Journal of Production Economics, 155, 351–360.CrossRefGoogle Scholar
  30. Porter, M. E., & Millar, V. E. (1985, July-August). How information gives you competitive advantage. Harvard Business Review, pp. 149–160.Google Scholar
  31. Revathy, P. H., & Subramanian, M. G. (2013). Two server (s, S) inventory system with positive service time, positive lead time, retrial customers and negative arrivals. International Journal of Computer Applications, 62(10), 9–13.CrossRefGoogle Scholar
  32. Robinson, L. W., Bradley, J. R., & Thomas, L. J. (2001). Consequences of order crossover under order-up-to inventory policies. Manufacturing & Service Operations Management, 3(3), 175–188.CrossRefGoogle Scholar
  33. Roundy, R. O., & Muckstadt, J. A. (2000). Heuristic computation of periodic-review base stock inventory policies. Management Science, 46(1), 104–109.CrossRefGoogle Scholar
  34. Shi, J., Katehakis, M. N., & Melamed, B. (2013). Martingale methods for pricing inventory penalties under continuous replenishment and compound renewal demands. Annals of Operations Research, 208(1), 593–612.  https://doi.org/10.1007/s10479-012-1130-5.CrossRefGoogle Scholar
  35. Shin, H., Collier, D. A., & Wilson, D. D. (2000). Supply management orientation and supplier/buyer performance. Journal of Operations Management, 18(3), 317–333.CrossRefGoogle Scholar
  36. Song, J. S., & Yao, D. D. (2002). Performance analysis and optimization of assemble-to-order systems with random lead times. Operations Research, 50(5), 889–903.CrossRefGoogle Scholar
  37. Song, J. S., & Zipkin, P. H. (1996). The joint effect of leadtime variance and lot size in a parallel processing environment. Management Science, 42(9), 1352–1363.CrossRefGoogle Scholar
  38. Song, J. S., Xu, S. H., & Liu, B. (1999). Order-fulfillment performance measures in an assemble-to-order system with stochastic leadtimes. Operations Research, 47(1), 131–149.CrossRefGoogle Scholar
  39. Tayur, S. R. (1993). Computing the optimal policy for capacitated inventory models. Stochastic Models, 9(4), 585–598.CrossRefGoogle Scholar
  40. Van Nyen, P., Bertrand, J., Van Ooijen, H., & Vandaele, N. (2005). A heuristic to control integrated multi-product multi-machine production-inventory systems with job shop routings and stochastic arrival, set-up and processing times. OR Spectrum, 27(2–3), 399–434.CrossRefGoogle Scholar
  41. Veatch, M. H., & Wein, L. M. (1994). Optimal control of a two-station tandem production/inventory system. Operations Research, 42(2), 337–350.CrossRefGoogle Scholar
  42. Veinott, A. F, Jr. (1966). The status of mathematical inventory theory. Management Science, 12(11), 745–777.CrossRefGoogle Scholar
  43. Wang, P., Zinn, W., & Croxton, K. L. (2010). Sizing inventory when lead time and demand are correlated. Production and Operations Management, 19(4), 480–484.CrossRefGoogle Scholar
  44. Zipkin, P. H. (2000). Foundations of inventory management (Vol. 2). New York: McGraw-Hill.Google Scholar

Copyright information

© Springer Science+Business Media, LLC, part of Springer Nature 2018

Authors and Affiliations

  1. 1.Department of Industrial EngineeringUniversidad Católica del NorteAntofagastaChile
  2. 2.Department of Industrial and Systems EngineeringUniversity at BuffaloBuffaloUSA

Personalised recommendations