Annals of Operations Research

, Volume 164, Issue 1, pp 63–78 | Cite as

A Petri Net based algorithm for minimizing total tardiness in flexible manufacturing systems

Article

Abstract

Petri Nets have been extensively used for modeling and simulating of the dynamics of flexible manufacturing systems. Petri Nets can capture features such as parallel machines, alternative routings, batch sizes, multiplicity of resources, to name but a few. However, Petri Nets have not been very popular for scheduling in manufacturing due to the Petri Net “state explosion” combined with the NP-hard nature of many of such problems. A promising approach for scheduling consists of generating only portions of the Petri Net state space with heuristic search methods. Thus far, most of this scheduling work with Petri Nets has been oriented to minimize makespan. The problem of minimizing total tardiness and other due date-related criteria has received little attention. In this paper, we extend the Beam A* Search algorithm presented in a previous work with capability to handle the total tardiness criterion. Computational tests were conducted on Petri Net models of both flexible job shop and flexible manufacturing systems. The results suggest that the Petri Net approach is also valid to minimize due date related criteria in flexible systems.

Keywords

Petri Nets Heuristic search Beam search Scheduling Flexible manufacturing systems 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Baker, K. R. (1974). Introduction to sequencing and scheduling. New York: Wiley. Google Scholar
  2. Brandimarte, P. (1993). Routing and scheduling in a flexible job shop by tabu search. Annals of Operations Research, 22, 158–183. Google Scholar
  3. Jeng, M. D., & Chen, S. C. (1998). A heuristic search approach using approximate solutions to Petri Net state equations for scheduling flexible manufacturing systems. The International Journal of Flexible Manufacturing Systems, 10, 139–162. CrossRefGoogle Scholar
  4. Lee, D. Y., & DiCesare, F. (1994). Scheduling flexible manufacturing systems using Petri Nets and heuristic search. IEEE Transactions on Robotics and Automation, 10(2), 123–131. CrossRefGoogle Scholar
  5. Mejía, G. (2003). Timed Petri Net modeling and optimization with heuristic search for flexible manufacturing workstations. In Proceedings of the 2003 IEEE emerging technologies and factory automation (ETFA), Lisbon, Portugal, September 16–19, 2003. Google Scholar
  6. Mejía, G., & Odrey, N. (2005). An approach using Petri Nets and improved heuristic search for manufacturing system scheduling. Journal of Manufacturing Systems, 34(2), 79–92. CrossRefGoogle Scholar
  7. Moore, K. E., & Gupta, S. M. (1996). Petri Net models of flexible and automated manufacturing systems: A survey. International Journal of Production Research, 34(11), 3001–3035. CrossRefGoogle Scholar
  8. Murata, T. (1989). Petri Nets: Properties, analysis and applications. Proceedings of the IEEE, 77(4), 541–580. CrossRefGoogle Scholar
  9. Ow, P. S., & Morton, T. E. (1988). Filtered beam search in scheduling. International Journal of Production Research, 26, 35–62. CrossRefGoogle Scholar
  10. Pinedo, M., & Chao, X. (1999). Operations scheduling with applications in manufacturing and services. New York: McGraw-Hill. Google Scholar
  11. Reyes-Moro, A., Yu, H., Kelleher, G., & Lloyd, S. (2002). Integrating Petri Nets and hybrid heuristic search for the scheduling of FMS. Computers in Industry, 47, 123–138. CrossRefGoogle Scholar
  12. Russell, S., & Norvig, P. (1995). Artificial intelligence: A modern approach. Englewood Cliffs: Prentice-Hall. Google Scholar
  13. Sabuncuoglu, I., & Bayiz, M. (1999). Job shop scheduling with Beam search. European Journal of Operational Research, 118(2), 390–412. CrossRefGoogle Scholar
  14. Sun, T., Cheng, W., & Fu, L. (1994). A Petri Net based approach to modeling and scheduling for an FMS and a case study. IEEE Transactions on Industrial Electronics, 41(6), 593–601. CrossRefGoogle Scholar
  15. Xiong, H. H., & Zhou, M. C. (1998). Scheduling of semi-conductor test facility via Petri Nets and hybrid heuristic search. IEEE Transactions on Semiconductor Manufacturing, 11(3), 384–393. CrossRefGoogle Scholar

Copyright information

© Springer Science+Business Media, LLC 2007

Authors and Affiliations

  1. 1.Department of Industrial EngineeringUniversidad de los Andes, PYLO Research GroupBogotáColombia

Personalised recommendations