An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs
Research Paper
First Online:
Received:
Revised:
- 122 Downloads
- 8 Citations
Abstract
In this paper, we deal with the two-machine flow shop scheduling problem having an unavailability interval on the first machine, and nonresumable jobs. We first present an enhancement procedure that, once applied to any arbitrary solution, produces a schedule that is at most equal 2 times the optimal makespan. We then develop an improved heuristic, with a relative worst-case error of 3/2.
Keywords
Flow shop Scheduling Availability constraint Heuristics Worst case analysisMSC classification (2000)
68W40 Analysis of algorithmsPreview
Unable to display preview. Download preview PDF.
References
- Breit J (2004) An improved approximation algorithm for two-machine flow shop scheduling with an availability constraint. Inf Process Lett 90: 273–278CrossRefGoogle Scholar
- Cheng TCE, Wang G (2000) An improved heuristic for two-machine flowshop scheduling with an availability constraint. Oper Res Lett 26: 223–229CrossRefGoogle Scholar
- Hadda H, Dridi N, Hajri-Gabouj S (2007a) The two-stage assembly flow shop scheduling with an availability constraint. In: Proceedings of the 3rd Multidisciplinary International Conference on Scheduling: Theory and Application, MISTA, pp 184–191Google Scholar
- Hadda H, Hajri-Gabouj S, Dridi N (2007b) Etude du flow shop hybride à deux étages avec machines dédiées sous contrainte d’indisponibilité. In: 5th International Conference: Integrated Design and Production, CPI, Rabat-MoroccoGoogle Scholar
- Hamid A, Artiba A (2006) Scheduling two-stage hybrid flow shop with availability constraints. Comput Oper Res 33: 1399–1419CrossRefGoogle Scholar
- Johnson SM (1954) Optimal two- and three-stage production schedules with setup times included. Res Log Q 1: 61–68CrossRefGoogle Scholar
- Lee CY (1997) Minimizing the makespan in the two-machine flow shop scheduling problem with an availability constraint. Oper Res Lett 20: 129–139CrossRefGoogle Scholar
- Lee CY (1999) Two-machine flowshop scheduling with availability constraints. Eur J Oper Res 114: 420–429CrossRefGoogle Scholar
Copyright information
© Springer-Verlag 2009