4OR

, Volume 8, Issue 1, pp 87–99 | Cite as

An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs

Research Paper

Abstract

In this paper, we deal with the two-machine flow shop scheduling problem having an unavailability interval on the first machine, and nonresumable jobs. We first present an enhancement procedure that, once applied to any arbitrary solution, produces a schedule that is at most equal 2 times the optimal makespan. We then develop an improved heuristic, with a relative worst-case error of 3/2.

Keywords

Flow shop Scheduling Availability constraint Heuristics Worst case analysis 

MSC classification (2000)

68W40 Analysis of algorithms 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. Breit J (2004) An improved approximation algorithm for two-machine flow shop scheduling with an availability constraint. Inf Process Lett 90: 273–278CrossRefGoogle Scholar
  2. Cheng TCE, Wang G (2000) An improved heuristic for two-machine flowshop scheduling with an availability constraint. Oper Res Lett 26: 223–229CrossRefGoogle Scholar
  3. Hadda H, Dridi N, Hajri-Gabouj S (2007a) The two-stage assembly flow shop scheduling with an availability constraint. In: Proceedings of the 3rd Multidisciplinary International Conference on Scheduling: Theory and Application, MISTA, pp 184–191Google Scholar
  4. Hadda H, Hajri-Gabouj S, Dridi N (2007b) Etude du flow shop hybride à deux étages avec machines dédiées sous contrainte d’indisponibilité. In: 5th International Conference: Integrated Design and Production, CPI, Rabat-MoroccoGoogle Scholar
  5. Hamid A, Artiba A (2006) Scheduling two-stage hybrid flow shop with availability constraints. Comput Oper Res 33: 1399–1419CrossRefGoogle Scholar
  6. Johnson SM (1954) Optimal two- and three-stage production schedules with setup times included. Res Log Q 1: 61–68CrossRefGoogle Scholar
  7. Lee CY (1997) Minimizing the makespan in the two-machine flow shop scheduling problem with an availability constraint. Oper Res Lett 20: 129–139CrossRefGoogle Scholar
  8. Lee CY (1999) Two-machine flowshop scheduling with availability constraints. Eur J Oper Res 114: 420–429CrossRefGoogle Scholar

Copyright information

© Springer-Verlag 2009

Authors and Affiliations

  1. 1.Unité de Recherche URAII, INSAT-TunisTunis CedexTunisia
  2. 2.Unité de Recherche OASIS, ENITTunisTunisia

Personalised recommendations