Advertisement

Reasonable gangue section length for disposing gangue pollutants in the new green mixed workface

  • Yang TaiEmail author
  • Shuai Guo
  • Lixin Lan
Review Paper
  • 25 Downloads

Abstract

Liberating layer mining is often used in high gas and low permeability coal seam, but this mining method will produce a large number of gangues. If these gangues are stacked on the surface ground, they will not only pollute the environment but also increase the transportation cost for the gangue. Backfilling method is an effective way to solve the problem of waste stacking. For this reason, Chinese scholars put forward a mixed workface which combines one part of the goaf that is managed with a fully mechanized gangue backfilling method (FMGBM) while the other part is dealed with the traditional caving method (TCM). The FMGBM is used for one part of the mixed workface, and the TCM is used for another. The two methods work together to ensure the coal output of the mixed workface. For this kind of mixed workface, the length of the backfilling section, length must be determined and well designed to provide a basis for support equipment design selection and mining pressure management. In order to solve this problem, it was firstly analyzed that the mining technology of mixed workface and the ABAQUS is used to establish the numerical simulation for the length optimization of the backfilling section in the mixed workface. By analyzing the influence of backfilling section length on roof vertical stress (i.e., vertical stress at the bottom of immediate roof, which represents the vertical pressure of immediate roof on coal body, caving rock, or backfilled gangue) and coal wall failure depth in backfilling section, caving section, goaf central position, and abutment stress area of the mixed workface, it is concluded that when the backfilling section length is more than 120 m, the roof vertical stress and coal wall failure depth are relatively small. Considering the cost of backfilling hydraulic supports, the backfilling section length of gangue is finally eventually determined to be 120 m. Finally, the industrial test was carried out in Ji15-31010 mixed workface of Pingdingshan No. 12 Coal Mine. The roof vertical stress in 5-m front of the workface coincides with that of the numerical simulation, which verifies the rationality of the 120 m length of the gangue section.

Keywords

Gangue pollutants Gangue backfilling method Caving method Green mixed workface Reasonable gangue section length 

Notes

Acknowledgments

This work was supported by the fundamental research funds for the central universities (2019BSCX04). The authors gratefully acknowledge the financial support from the organization mentioned above.

References

  1. Bai QS, Tu SH (2016) Failure analysis of a large span longwall drift under water-rich roofs and its control techniques. Eng Fail Anal 67:15–32.  https://doi.org/10.1016/j.engfailanal.2016.05.028 CrossRefGoogle Scholar
  2. Bai M, Kendorski F, Roosendaal DV (1995) Chinese and North American high-extraction underground coal mining strata behaviour and water protection experience and guidelines. In: Proceedings of the 14th International Conference on Ground Control in Mining Mining Technology, 1995. pp 209–217Google Scholar
  3. Bai Q-S, Tu S-H, Zhang X-G, Zhang C, Yuan Y (2013) Numerical modeling on brittle failure of coal wall in longwall face—a case study. Arab J Geosci 7:5067–5080.  https://doi.org/10.1007/s12517-013-1181-1 CrossRefGoogle Scholar
  4. Bai QS, Tu SH, Chen M, Zhang C (2016) Numerical modeling of coal wall spall in a longwall face. Int J Rock Mech Min Sci 88:242–253.  https://doi.org/10.1016/j.ijrmms.2016.07.031 CrossRefGoogle Scholar
  5. Bertuzzi R (2013) Discussion on 'Sari, M., An improved method of fitting experimental data to the Hoek-Brown failure criterion, Engineering Geology (2012)'. Eng Geol 152:213.  https://doi.org/10.1016/j.enggeo.2012.07.013 CrossRefGoogle Scholar
  6. Bertuzzi R, Douglas K, Mostyn G (2016) Improving the GSI Hoek-Brown criterion relationships. Int J Rock Mech Min Sci 89:185–199.  https://doi.org/10.1016/j.ijrmms.2016.09.008 CrossRefGoogle Scholar
  7. Cerik BC (2017) Damage assessment of marine grade aluminium alloy-plated structures due to air blast and explosive loads. Thin Wall Struct 110:123–132.  https://doi.org/10.1016/j.tws.2016.10.021 CrossRefGoogle Scholar
  8. Coggan J, Gao FQ, Stead D, Elmo D (2012) Numerical modelling of the effects of weak immediate roof lithology on coal mine roadway stability. Int J Coal Geol 90:100–109.  https://doi.org/10.1016/j.coal.2011.11.003 CrossRefGoogle Scholar
  9. Emad MZ (2017) Numerical modelling approach for mine backfill Sadhana-Academy. Proc Eng Sci 42:1595–1604.  https://doi.org/10.1007/s12046-017-0702-0 CrossRefGoogle Scholar
  10. Fang K, Zhang J-x, Zhang Q, Sun Q, Yin W, Zhou F (2016) Fully mechanised mixed mining technology involving solid backfilling and caving methods in longwall workface. Min Technol 125:205–211.  https://doi.org/10.1080/14749009.2016.1139338 CrossRefGoogle Scholar
  11. G SMD (1990) Mechanism of caving in longwall coal mining. In: Rock Mechanics Contributions and Challenges: Proceedings of the 31st US Symposium, Golden, Colorado. pp 161-168Google Scholar
  12. Gao R, Yu B, Xia H, Duan H (2017) Reduction of stress acting on a thick, deep coal seam by protective-seam. Energies 10:1209.  https://doi.org/10.3390/en10081209 CrossRefGoogle Scholar
  13. Gong P, Ma Z, Ni X, Zhang R (2017) Floor heave mechanism of gob-side entry retaining with fully-mechanized backfilling. Energies 10.  https://doi.org/10.3390/en10122085 CrossRefGoogle Scholar
  14. Jiang LS, Wang P, Zhang PP, Zheng PQ, Xu B (2017) Numerical analysis of the effects induced by normal faults and dip angles on rock bursts. Comptes Rendus Mecanique 345:690–705.  https://doi.org/10.1016/j.crme.2017.06.009 CrossRefGoogle Scholar
  15. Jin K, Cheng Y, Wang W, Liu H, Liu Z, Zhang H (2016) Evaluation of the remote lower protective seam mining for coal mine gas control: a typical case study from the Zhuxianzhuang Coal Mine, Huaibei Coalfield, China. J Nat Gas Sci Eng 33:44–55.  https://doi.org/10.1016/j.jngse.2016.05.004 CrossRefGoogle Scholar
  16. Ju MH, Li XH, Yao QL, Li DW, Chong ZH, Zhou J (2015) Numerical investigation into effect of rear barrier pillar on stress distribution around a longwall face. J Cent South Univ 22:4372–4384.  https://doi.org/10.1007/s11771-015-2986-8 CrossRefGoogle Scholar
  17. Kong S, Cheng Y, Ren T, Liu H (2014) A sequential approach to control gas for the extraction of multi-gassy coal seams from traditional gas well drainage to mining-induced stress relief. Appl Energy 131:67–78.  https://doi.org/10.1016/j.apenergy.2014.06.015 CrossRefGoogle Scholar
  18. Li M, Zhang J, Huang Y, Zhou N (2017) Effects of particle size of crushed gangue backfill materials on surface subsidence and its application under buildings. Environ Earth Sci 76.  https://doi.org/10.1007/s12665-017-6931-z
  19. Liu H, Liu H, Cheng Y (2014) The elimination of coal and gas outburst disasters by ultrathin protective seam drilling combined with stress-relief gas drainage in Xinggong coalfield. J Nat Gas Sci Eng 21:837–844.  https://doi.org/10.1016/j.jngse.2014.10.022 CrossRefGoogle Scholar
  20. Marinos P, Marinos V, Hoek E (2007) Geological Strength Index (GSI). A characterization tool for assessing engineering properties for rock masses. Underground Works under Special ConditionsGoogle Scholar
  21. Shabanimashcool M, Li CC (2012) Numerical modelling of longwall mining and stability analysis of the gates in a coal mine. Int J Rock Mech Min Sci 51:24–34.  https://doi.org/10.1016/j.ijrmms.2012.02.002 CrossRefGoogle Scholar
  22. Sun Q, Zhang J, Zhang Q, Yan H (2018a) A case study of mining-induced impacts on the stability of multi-tunnels with the backfill mining method and controlling strategies. Environ Earth Sci 77.  https://doi.org/10.1007/s12665-018-7414-6
  23. Sun W, Wang H, Hou K (2018b) Control of waste rock-tailings paste backfill for active mining subsidence areas. J Clean Prod 171:567–579.  https://doi.org/10.1016/j.jclepro.2017.09.253 CrossRefGoogle Scholar
  24. Wang AL, Ma LQ, Wang ZW, Zhang DS, Li K, Zhang Y, Yi XJ (2016) Soil and water conservation in mining area based on ground surface subsidence control: development of a high-water swelling material and its application in backfilling mining. Environ Earth Sci 75:779.  https://doi.org/10.1007/s12665-016-5577-6 CrossRefGoogle Scholar
  25. Wang PF, Zhao JL, Chugh YP, Wang ZQ (2017) A novel longwall mining layout approach for extraction of deep coal deposits. Minerals 7:60.  https://doi.org/10.3390/min7040060 CrossRefGoogle Scholar
  26. Xie J, Zhu W, Xu J, Wen J, Liu C (2015) A study on the bearing effect of pier column backfilling in the goaf of a thin coal seam. Geosci J 20:361–369.  https://doi.org/10.1007/s12303-015-0047-9 CrossRefGoogle Scholar
  27. Yang TH, Xu T, Liu HY, Tang CA, Shi BM, Yu QX (2011) Stress-damage-flow coupling model and its application to pressure relief coal bed methane in deep coal seam International. J Coal Geol 86:357–366.  https://doi.org/10.1016/j.coal.2011.04.002 CrossRefGoogle Scholar
  28. Yang S-Q, Chen M, Jing H-W, Chen K-F, Meng B (2017) A case study on large deformation failure mechanism of deep soft rock roadway in Xin'An coal mine, China. Eng Geol 217:89–101.  https://doi.org/10.1016/j.enggeo.2016.12.012 CrossRefGoogle Scholar
  29. Yilmaz T, Ercikdi B, Deveci H (2018) Utilisation of construction and demolition waste as cemented paste backfill material for underground mine openings. J Environ Manag 222:250–259.  https://doi.org/10.1016/j.jenvman.2018.05.075 CrossRefGoogle Scholar
  30. Zhang J-x, Huang P, Zhang Q, Li M, Chen Z-w (2017) Stability and control of room mining coal pillars—taking room mining coal pillars of solid backfill recovery as an example. J Cent South Univ 24:1121–1132.  https://doi.org/10.1007/s11771-017-3515-8 CrossRefGoogle Scholar
  31. Zhang GC, He FL, Jia HG, Lai YH (2017a) Analysis of gateroad stability in relation to yield pillar size: a case study rock. Mech Rock Eng 50:1263–1278.  https://doi.org/10.1007/s00603-016-1155-1 CrossRefGoogle Scholar
  32. Zhang J, Zhang Q, Spearing AJS, Miao X, Guo S, Sun Q (2017c) Green coal mining technique integrating mining-dressing-gas draining-backfilling-mining. Int J Min Sci Technol 27:17–27.  https://doi.org/10.1016/j.ijmst.2016.11.014 CrossRefGoogle Scholar
  33. Zhang X, Lin J, Liu J, Li F, Pang Z (2017d) Investigation of hydraulic-mechanical properties of paste backfill containing coal gangue-fly ash and its application in an underground coal mine. Energies 10.  https://doi.org/10.3390/en10091309 CrossRefGoogle Scholar
  34. Zhou XP, Li JL (2011) Hoek-Brown criterion applied to circular tunnel using elastoplasticity and in situ axial stress. Theor Appl Fract Mech 56:95–103.  https://doi.org/10.1016/j.tafmec.2011.10.005 CrossRefGoogle Scholar

Copyright information

© Springer-Verlag GmbH Germany, part of Springer Nature 2019

Authors and Affiliations

  1. 1.School of MinesChina University of Mining and TechnologyXuzhouChina
  2. 2.State Key Laboratory of Coal Resources and Safe MiningChina University of Mining and TechnologyXuzhouChina
  3. 3.Key Laboratory of Deep Coal Resource MiningChina University of Mining and TechnologyXuzhouChina

Personalised recommendations