Advertisement

Aggregate production planning under uncertainty: a comprehensive literature survey and future research directions

  • Aboozar JamalniaEmail author
  • Jian-Bo Yang
  • Ardalan Feili
  • Dong-Ling Xu
  • Gholamreza Jamali
ORIGINAL ARTICLE
  • 22 Downloads

Abstract

This is the first literature survey of its kind on aggregate production planning (APP) under uncertainty. Different types of uncertainty, such as stochasticity, fuzziness and possibilistic forms, have been incorporated into many management science techniques to study APP decision problem under uncertainty. In current research, a wide range of the literature which employ management science methodologies to deal with APP in presence of uncertainty is surveyed by classifying them into five main categories: stochastic mathematical programming, fuzzy mathematical programming, simulation, metaheuristics and evidential reasoning. First, the preliminary analysis of the literature is presented by classifying the literature according to the abovementioned methodologies, discussing about advantages and disadvantages of these methodologies when applied to APP under uncertainty and concisely reviewing the more recent literature. Then, APP literature under uncertainty is analysed from management science and operations management perspectives. Possible future research paths are also discussed on the basis of identified research trends and research gaps.

Keywords

Aggregate production planning (APP) under uncertainty Management science methods Literature on uncertain APP models 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  1. 1.
    Shi Y, Haase C (1996) Optimal trade-offs of aggregate production planning with multiple objective and multi-capacity demand levels. International Journal of Operations and Quantitative Management 2(2):127–143Google Scholar
  2. 2.
    Holt CC, Modigliani F, Simon HA (1955) Linear decision rule for production and employment scheduling. Manag Sci 2(1):1–30CrossRefGoogle Scholar
  3. 3.
    Holt CC, Modigliani F, Muth JF (1956) Derivation of a linear decision rule for production and employment. Manag Sci 2(2):159–177MathSciNetzbMATHCrossRefGoogle Scholar
  4. 4.
    Bowman EH (1956) Production scheduling by the transportation method of linear programming. Oper Res 4(1):100–103CrossRefGoogle Scholar
  5. 5.
    Funtowicz SO, Ravetz JR (1990) Uncertainty and quality in science for policy. Kluwer Academic Publishers, DordrechtCrossRefGoogle Scholar
  6. 6.
    Walker WE, Harremoës P, Rotmans J, Van Der Sluijs JP, Van Asselt MBA, Janssen P, Krayer Von Krauss MP (2003) Defining uncertainty: a conceptual basis for uncertainty management in model-based decision support. Integr Assess 4(1):5–17CrossRefGoogle Scholar
  7. 7.
    Charnes A, Cooper WW (1961) Management models and industrial applications of linear programming. John Wiley and Sons, New YorkzbMATHGoogle Scholar
  8. 8.
    Hanssmann F, Hess SW (1960) A linear programming approach to production and employment scheduling. Manag Sci (1, 1):46–51Google Scholar
  9. 9.
    Bowman EH (1963) Consistency and optimality in managerial decision making. Manag Sci 9(2):310–321CrossRefGoogle Scholar
  10. 10.
    Jones CH (1967) Parametric production planning. Manag Sci 13(11):843–866CrossRefGoogle Scholar
  11. 11.
    Taubert WH (1968) A search decision rule for aggregate scheduling problem. Manag Sci 14(6):343–359CrossRefGoogle Scholar
  12. 12.
    Vergin RC (1966) Production scheduling under seasonal demand. J Ind Eng 17(5):260–266Google Scholar
  13. 13.
    Peterson R, Silver EA (1979) Decision systems for inventory management and production planning. John Wiley and Sons, New YorkGoogle Scholar
  14. 14.
    Tersine RJ (1980) Productions/operations management: concepts, structures and analysis. North Holland Publishing Company, New YorkGoogle Scholar
  15. 15.
    Cheraghalikhani A, Khoshalhan F, Mokhtari H (2019) Aggregate production planning: a literature review and future research directions. Int J Ind Eng Comput 10(2):309–330.  https://doi.org/10.5267/j.ijiec.2018.6.002 CrossRefGoogle Scholar
  16. 16.
    Nam SJ, Logendran R (1992) Aggregate production planning—a survey of models and methodologies. Eur J Oper Res 61(3):255–272CrossRefGoogle Scholar
  17. 17.
    Sweetser, A. (1999). A comparison of system dynamics (SD) and discrete event simulation (DES). In Proceedings of the 17th international conference of the system dynamics society and the 5th Australian & New Zealand systems conference, Wellington, New Zealand. 20–23 July 1999 (pp. 1–8)Google Scholar
  18. 18.
    Tako, A.A., & Robinson, S. (2008). Model building in system dynamics and discrete event simulation: a quantitative comparison. In Proceedings of the 2008 international conference of the system dynamics society, Athens, Greece. 20–24 July 2008 (pp. 1–16)Google Scholar
  19. 19.
    Bertrand JWM, Fransoo JC (2002) Operations management research methodologies using quantitative modeling. International Journal of Operations and Production Management 22(2):241–264CrossRefGoogle Scholar
  20. 20.
    Gilgeous V (1989) Modeling realism in aggregate planning: a goal-search approach. Int J Prod Res 27(7):1179–1193CrossRefGoogle Scholar
  21. 21.
    Pidd M (2004) Computer simulation in management science. John Wiley & Sons, ChichesterzbMATHGoogle Scholar
  22. 22.
    Rabelo L, Helal M, Jones A, Min HS (2005) Enterprise simulation: a hybrid system approach. Int J Comput Integr Manuf 18(6):498–508CrossRefGoogle Scholar
  23. 23.
    Siebers PO (2006) Simulation: a key technique in operational research: http://www.cs.nott.ac.uk/~pszps/docs/pos-Seminar-15-02-2006_ppt.pdf. Accessed 19 Oct 2018
  24. 24.
    Venkateswaran J, Son YJ (2005) Hybrid system dynamic-discrete event simulation-based architecture for hierarchical production planning. Int J Prod Res 43(20):4397–4429CrossRefGoogle Scholar
  25. 25.
    Jamalnia A, Feili A (2013) A simulation testing and analysis of aggregate production planning strategies. Production Planning & Control 24(6):423–448CrossRefGoogle Scholar
  26. 26.
    Miljković Z, Petrović M (2017) Application of modified multi-оbjective particle swarm optimisation algorithm for flexible process planning problem. Int J Comput Integr Manuf 30(2–3):271–291CrossRefGoogle Scholar
  27. 27.
    Lee KY, Park JB (2006). Application of particle swarm optimisation to economic dispatch problem: advantages and disadvantages. 2006 IEEE PES Power Systems Conference and Exposition, Atlanta, GA, USA. 29 October-1 November 2006 (pp. 188–192)Google Scholar
  28. 28.
    Bai Q (2010) Analysis of particle swarm optimisation algorithm. Computer and Information Science 3(1):180–184CrossRefGoogle Scholar
  29. 29.
    Gong D, Lu L, Li M (2009) Robot path planning in uncertain environments based on particle swarm optimisation. 2009 IEEE Congress on Evolutionary Computation, Trondheim, Norway. 18–21 May 2009 (pp. 2127–2134)Google Scholar
  30. 30.
    Poli R, Kennedy J, Blackwell T (2007) Particle swarm optimization an overview. Swarm Intelligence 1(1):33.57CrossRefGoogle Scholar
  31. 31.
    Bessedik M, Benbouzid-Si Tayeb F, Cheurfi H, Blizak A (2016) An immunity-based hybrid genetic algorithms for permutation flowshop scheduling problems. Int J Adv Manuf Technol 85(9–12):2459–2469CrossRefGoogle Scholar
  32. 32.
    Drake AE, Marks RE (2002) Genetic algorithms in economics and finance: forecasting stock market prices and foreign exchange—a review. In: Chen SH (ed) Genetic algorithms and genetic programming in computational finance. Springer, Boston, MA, pp 29–54CrossRefGoogle Scholar
  33. 33.
    Sivanandam SN, Deepa SN (2008) Introduction to genetic algorithms. Springer-Verlag, Berlin, HeidelbergzbMATHGoogle Scholar
  34. 34.
    Wang X, Gao XZ, Zenger K (2015) An introduction to harmony search optimization method. Springer International Publishing, New YorkCrossRefGoogle Scholar
  35. 35.
    Shurong L, Guoxia C, Yang L, Qiang Z, Yuxiao W (2012) Improved harmony search algorithm with better local convergence speed. Proceedings of 31st Chinese control conference, Hefei, China. 25–27 July 2012 (pp.2368–2373)Google Scholar
  36. 36.
    Sun W, Chang X (2015) An improved harmony search algorithm for power distribution network planning. J Electr Comput Eng 2015:1–7Google Scholar
  37. 37.
    Moslemipour G, Lee TS, Rilling D (2012) A review of intelligent approaches for designing dynamic and robust layouts in flexible manufacturing systems. Int J Adv Manuf Technol 60(1–4):11–27CrossRefGoogle Scholar
  38. 38.
    Connor AM, Shea K (2000) A comparison of semi-deterministic and stochastic search techniques. In: Parmee IC (ed) Evolutionary design & manufacture (selected papers from ACDM’00). Springer-Verlag, London, pp 287–298CrossRefGoogle Scholar
  39. 39.
    Petrović M, Mitić M, Vuković N, Miljković Z (2016) Chaotic particle swarm optimization algorithm for flexible process planning. Int J Adv Manuf Technol 85(9–12):2535–2555CrossRefGoogle Scholar
  40. 40.
    Zhang J (2011) Comparative study of several intelligent algorithms for knapsack problem. Procedia Environ Sci 11(2011):163–168CrossRefGoogle Scholar
  41. 41.
    Ruspini EH, Lowrance JD, Strat TM (1992) Understanding evidential reasoning. Int J Approx Reason 6(3):401–424zbMATHCrossRefGoogle Scholar
  42. 42.
    Li B, Wang H, Yang JB, Guo M, Qi C (2013) A belief-rule-based inference method for aggregate production planning under uncertainty. Int J Prod Res 51(1):83–105CrossRefGoogle Scholar
  43. 43.
    Yang JB, Wang YM, Xu DL, Chin KS (2006a) The evidential reasoning approach for MCDA under both probabilistic and fuzzy uncertainties. Eur J Oper Res 171(1):309–343zbMATHCrossRefGoogle Scholar
  44. 44.
    Yang JB, Liu J, Wang J, Sii HS, Wang HW (2006b) A belief rule-base inference methodology using the evidential reasoning approach—RIME. IEEE Trans Syst Man Cybern Syst Hum 36(2):266–285CrossRefGoogle Scholar
  45. 45.
    Xu DL, Yang JB, Wang YM (2006) The ER approach for multi-attribute decision analysis under interval uncertainties. Eur J Oper Res 174(3):1914–1943zbMATHCrossRefGoogle Scholar
  46. 46.
    Yang JB, Xu DL (2002) On the evidential reasoning algorithm for multiple attribute decision analysis under uncertainty. IEEE Trans Syst Man Cybern Part A: Syst Hum 32(3):289–304CrossRefGoogle Scholar
  47. 47.
    Yang, J.B., & Xu, D.L. (2013). Evidential reasoning rule for evidence combination. Artif Intell, 205 (2013), 1–29Google Scholar
  48. 48.
    Gholamian N, Mahdavi I, Tavakkoli-Moghaddam R, Mahdavi-Amiri N (2015) Comprehensive fuzzy multi-objective multi-product multi-site aggregate production planning decisions in a supply chain under uncertainty. Applied Soft Computing 37(2015):585–607CrossRefGoogle Scholar
  49. 49.
    Gholamian N, Mahdavi I, Tavakkoli-Moghaddam R (2016) Multiobjective multi-product multi-site aggregate production planning in a supply chain under uncertainty: fuzzy multi-objective optimisation. Int J Comput Integr Manuf 29(2):149–165Google Scholar
  50. 50.
    Sisca FG, Fiasché M, Taisch M (2015) A novel hybrid modelling for aggregate production planning in a reconfigurable assembly unit for optoelectronics. In: Arik S, Huang T, Lai WK, Liu Q (eds) National information processing. Springer International Publishing, Switzerland, pp 571–582Google Scholar
  51. 51.
    Fiasché M, Ripamonti G, Sisca FG, Taisch M, Tavola G (2016) A novel hybrid fuzzy multi-objective linear programming method of aggregate production planning. In: Bassis S, Esposito A, Carlo Morabito F, Pasero E (eds) Advances in neural networks. Springer International Publishing, Switzerland, pp 489–501CrossRefGoogle Scholar
  52. 52.
    Zaidan AA, Atiya B, Abu Bakar MR, Zaidan BB (2017) A new hybrid algorithm of simulated annealing and simplex downhill for solving multiple-objective aggregate production planning on fuzzy environment. Neural Comput & Applic.  https://doi.org/10.1007/s00521-017-3159-5
  53. 53.
    Chauhan, Y., Aggarwal, V., & Kumar, P. (2017). Application of FMOMILP for aggregate production planning: a case of multi-product and multi-period production model. AMIAMS 2017-[IEEE] International Conference on Advances in Mechanical, Industrial, Automation and Management Systems, Allahabad, India. 3–5 February 2017 (pp. 266–271)Google Scholar
  54. 54.
    Jamalnia A, Soukhakian MA (2009) A hybrid fuzzy goal programming approach with different goal priorities to aggregate production planning. Comput Ind Eng 56(4):1474–1486CrossRefGoogle Scholar
  55. 55.
    Sadeghi M, Razavi Hajiagha SH, Hashemi SS (2013) A fuzzy grey goal programming approach for aggregate production planning. Int J Adv Manuf Technol 64(9):1715–1727CrossRefGoogle Scholar
  56. 56.
    Liang TF, Cheng HW, Chen PY, Shen KH (2011) Application of fuzzy sets to aggregate production planning with multiproducts and multitime periods. IEEE Trans Fuzzy Syst 19(3):465–477CrossRefGoogle Scholar
  57. 57.
    Pathak S, Sarkar S (Mondal)(2012) A fuzzy optimization model to the aggregate production/distribution planning decision in a multi-item supply chain network. Int J Manag Sci Eng Manag 7(3):163–173Google Scholar
  58. 58.
    Omar MK, Jusoh MM, Omar M (2012) Investigating the benefits of fuzzy mathematical programming approach for solving aggregate production planning. WCCI 2012 IEEE World Congress on Computational Intelligence, Brisbane, Australia. 10–15 June 2012 (pp. 1–6)Google Scholar
  59. 59.
    Wang HF, Zheng KW (2013) Application of fuzzy linear programming to aggregate production plan of a refinery industry in Taiwan. J Oper Res Soc 64(2):169–184CrossRefGoogle Scholar
  60. 60.
    Iris C, Cevikcan E (2014) A fuzzy linear programming approach for aggregate production planning. In: Kahraman C, Öztayşi B (eds) Supply chain management under fuzziness. Springer-Verlag, Berlin Heidelberg, pp 355–374CrossRefGoogle Scholar
  61. 61.
    Chen SP, Huang WL (2010) A membership function approach for aggregate production planning problems in fuzzy environments. Int J Prod Res 48(23):7003–7023zbMATHCrossRefGoogle Scholar
  62. 62.
    Chen Z, Sarker BR (2015) Aggregate production planning with learning effect and uncertain demand. Journal of Modelling in Management 10(3):296–324CrossRefGoogle Scholar
  63. 63.
    Hsieh S, Wu MS (2000) Demand and cost forecast error sensitivity analyses in aggregate production planning by possibilistic linear programming models. J Intell Manuf 11(4):355–364CrossRefGoogle Scholar
  64. 64.
    Sakallı US, Baykoç OF, Birgören B (2010) A possibilistic aggregate production planning model for brass casting industry. Production Planning & Control 21(3):319–338CrossRefGoogle Scholar
  65. 65.
    Zhu B, Hui J, Zhang F, He L (2018) An interval programming approach for multi-period and multiproduct aggregate production planning by considering the decision maker’s preference. International Journal of Fuzzy Systems 20(3):1015–1026.  https://doi.org/10.1007/s40815-017-0341-y MathSciNetCrossRefGoogle Scholar
  66. 66.
    Turksen, I.B., & Zhong, Z. (1988). An approximate reasoning approach for the implementation of an expert system in aggregate production planning. In Proceedings of the 1988 IEEE International Conference on Systems, Man, and Cybernetics, Beijing, China. 8–12 August 1988 (pp. 173–176)Google Scholar
  67. 67.
    Ward TL, Ralston PAS, Davis JA (1992) Fuzzy logic control of aggregate production planning. Comput Ind Eng 23(1–4):137–140CrossRefGoogle Scholar
  68. 68.
    Rahmani D, Yousefli A, Ramezanian R (2014) A new robust fuzzy approach for aggregate production planning. Scientia Iranica E 21(6):2307–2314Google Scholar
  69. 69.
    Leung SCH, Wu Y, Lai KK (2006) A stochastic programming approach for multi-site aggregate production planning. J Oper Res Soc 57(2):123–132zbMATHCrossRefGoogle Scholar
  70. 70.
    Demirel E, Ozelkan EC, Lim C (2018) Aggregate planning with flexibility requirements profile. Int J Prod Econ 202(2018):45–58CrossRefGoogle Scholar
  71. 71.
    Chen YK, Liao HC (2003) An investigation on selection of simplified aggregate production planning strategies using MADM approaches. Int J Prod Res 41(14):3359–3374zbMATHCrossRefGoogle Scholar
  72. 72.
    Jamalnia A, Yang JB, Xu DL, Feili A (2017) Novel decision model based on mixed chase and level strategy for aggregate production planning under uncertainty: case study in beverage industry. Comput Ind Eng 114(2017):54–68CrossRefGoogle Scholar
  73. 73.
    Jamalnia A (2017) Evaluating the performance of aggregate production planning strategies under uncertainty. PhD. The University of ManchesterGoogle Scholar
  74. 74.
    Ning Y, Liu J, Yan L (2013) Uncertain aggregate production planning. Soft Comput 17(4):617–624CrossRefGoogle Scholar
  75. 75.
    Mirzapour Al-e-hashem SMJ, Baboli A, Sazvar Z (2013) A stochastic aggregate production planning model in a green supply chain: considering flexible lead times, nonlinear purchase and shortage cost functions. Eur J Oper Res 230(1):26–41MathSciNetzbMATHCrossRefGoogle Scholar
  76. 76.
    Lieckens K, Vandaele N (2014) A decision support system for the stochastic aggregate planning problem: http://ssrn.com/abstract=2419376. Accessed 20 March 2016
  77. 77.
    Mirzapour Al-e-hashem SMJ, Malekly H, Aryanezhad MB (2011) A multi-objective robust optimization model for multi-product multi-site aggregate production planning in a supply chain under uncertainty. Int J Prod Econ 134(1):28–42CrossRefGoogle Scholar
  78. 78.
    Mirzapour Al-e-hashem SMJ, Aryanezhad MB, Sadjadi SJ (2012) An efficient algorithm to solve a multi-objective robust aggregate production planning in an uncertain environment. Int J Adv Manuf Technol 58(5):765–782CrossRefGoogle Scholar
  79. 79.
    Niknamfar AH, Akhavan Niaki ST, Pasandideh SHR (2015) Robust optimization approach for an aggregate production–distribution planning in a three-level supply chain. Int J Adv Manuf Technol 76(1):623–634CrossRefGoogle Scholar
  80. 80.
    Modarres M, Izadpanahi E (2016) Aggregate production planning by focusing on energy saving: a robust optimization approach. J Clean Prod 133(2016):1074–1085CrossRefGoogle Scholar
  81. 81.
    Makui A, Heydari M, Aazami A, Dehghani E (2016) Accelerating benders decomposition approach for robust aggregate production planning of products with a very limited expiration date. Comput Ind Eng 100(2016):34–51CrossRefGoogle Scholar
  82. 82.
    Silva Filho OS (2005). A constrained stochastic production planning problem with imperfect information of inventory. In Proceedings of the 16th IFAC World Congress, Czech Republic (Vol. 38, pp. 121–126)Google Scholar
  83. 83.
    Kogan K, Portouga V (2006) Multi-period aggregate production planning in a news-vendor framework. J Oper Res Soc 57(4):423–433zbMATHCrossRefGoogle Scholar
  84. 84.
    Hahn GJ, Kaiser C, Kuhn H, Perdu L, Vandaele NJ (2012) Enhancing aggregate production planning with an integrated stochastic queuing model. In: Klatte D, Luthi HJ, Schmedders K (eds) Operations research proceedings 2011. Springer-Verlag, Berlin Heidelberg, pp 451–456CrossRefGoogle Scholar
  85. 85.
    Hahn GJ, Brandenburg M (2018) A sustainable aggregate production planning model for the chemical process industry. Comput Oper Res 94:154–168.  https://doi.org/10.1016/j.cor.2017.12.011 MathSciNetCrossRefzbMATHGoogle Scholar
  86. 86.
    Tian X, Mohamed Y, AbouRizk S (2010) Simulation-based aggregate planning of batch plant operations. Can J Civ Eng 37(10):1277–1288CrossRefGoogle Scholar
  87. 87.
    Gansterer M (2015) Aggregate planning and forecasting in make-to-order production systems. Int J Prod Econ 170(Part B):521–528CrossRefGoogle Scholar
  88. 88.
    Altendorfer K, Felberbauer T, Jodlbauer H (2016) Effects of forecast errors on optimal utilisation in aggregate production planning with stochastic customer demand. Int J Prod Res 54(12):3718–3735CrossRefGoogle Scholar
  89. 89.
    Cebral-Fernández, M., Rouco-Couzo, M., Pazos, M.Q., Crespo-Pereira, D., García del Valle, A., & Morgade Abeal, R. (2017). Application of a multi-level simulation model for aggregate and detailed planning in shipbuilding. Proceedings of the 2017 Winter Simulation Conference, Las Vegas, NV, USA. 3–6 December 2017 (pp. 3864–3875)Google Scholar
  90. 90.
    Khouja M (1998) An aggregate production planning framework for the evaluation of volume flexibility. Prod Plan Control 9(2):127–137CrossRefGoogle Scholar
  91. 91.
    Mendoza JD, Mula J, Campuzano-Bolarin F (2014) Using systems dynamics to evaluate the tradeoff among supply chain aggregate production planning policies. Int J Oper Prod Manag 34(8):1055–1079CrossRefGoogle Scholar
  92. 92.
    Fichera, S., La Spada, A., Perrone, G., Grasso, V., & La Commare, U. (1999). Possibilistic programming and gas for aggregate production planning under vague information. In E. Kuljanic (Eds.), Advanced manufacturing systems and technology (pp. 485–492). Wien New York: Springer VerlagGoogle Scholar
  93. 93.
    Aliev RA, Fazlollahi B, Guirimov BG, Aliev RR (2007) Fuzzy genetic approach to aggregate production−distribution planning in supply chain management. Inf Sci 177(20):4241–4255zbMATHCrossRefGoogle Scholar
  94. 94.
    Baykasoğlu A, Göçken T (2006) A tabu search approach to fuzzy goal programs and an application to aggregate production planning. Eng Optim 38(2):155–177MathSciNetCrossRefGoogle Scholar
  95. 95.
    Baykasoglu A, Gocken T (2010) Multi-objective aggregate production planning with fuzzy parameters. Adv Eng Softw 41(9):1124–1131zbMATHCrossRefGoogle Scholar
  96. 96.
    Baykasoglu A, Owen S, Gindy N (1999) Solution of goal programming models using a basic taboo search algorithm. Journal of the Operations Research Society 50(9):960–973zbMATHCrossRefGoogle Scholar
  97. 97.
    Aungkulanon P, Phruksaphanrat B, Luangpaiboon P (2012) Harmony search algorithm with various evolutionary elements for fuzzy aggregate production planning. In: Ao SI, Castillo O, Huang X (eds) Intelligent control and innovative computing. Springer Science+Business Media, US, pp 189–201CrossRefGoogle Scholar
  98. 98.
    Chakrabortty RK, Hasin MAA, Sarker RA, Essam DL (2015) A possibilistic environment based particle swarm optimization for aggregate production planning. Comput Ind Eng 88:366–377CrossRefGoogle Scholar
  99. 99.
    Dai L, Fan L, Sun L (2003) Aggregate production planning utilising a fuzzy linear programming. J Integr Des Process Sci 7(4):81–95Google Scholar
  100. 100.
    Tang J, Wang D, Fung RYK (2000) Fuzzy formulation for multi-product aggregate production planning. Prod Plann Control 11(7):670–676CrossRefGoogle Scholar
  101. 101.
    Fung RYK, Tang J, Wang D (2003) Multiproduct aggregate production planning with fuzzy demands and fuzzy capacities. IEEE Transactions on Systems, Man, and Cybernetics-Part A: Systems and Humans 33(3):302–313CrossRefGoogle Scholar
  102. 102.
    Lee, Y.Y. (1990). Fuzzy sets theory approach to aggregate production planning and inventory control. PhD. Kansas State UniversityGoogle Scholar
  103. 103.
    Gen M, Tsujimura Y, Ida K (1992) Method for solving multi-objective aggregate production planning problem with fuzzy parameters. Comput Ind Eng 23(I-4):117–120CrossRefGoogle Scholar
  104. 104.
    Wang RC, Fang HH (2001) Aggregate production planning with multiple objectives in a fuzzy environment. Eur J Oper Res 133(3):521–536zbMATHCrossRefGoogle Scholar
  105. 105.
    Wang RC, Liang TF (2004) Application of fuzzy multi-objective linear programming to aggregate production planning. Comput Ind Eng 46(1):17–41CrossRefGoogle Scholar
  106. 106.
    Ghasemy Yaghin R, Torabi SA, Fatemi Ghomi SMT (2012) Integrated markdown pricing and aggregate production planning in a two echelon supply chain: a hybrid fuzzy multiple objective approach. Appl Math Model 36(12):6011–6030MathSciNetzbMATHCrossRefGoogle Scholar
  107. 107.
    Lin TM, Liang TF (2002) Aggregate production planning with multiple fuzzy goals. Journal of the Chinese Institute of Industrial Engineers 19(4):39–47CrossRefGoogle Scholar
  108. 108.
    Wang RC, Liang TF (2005b) Aggregate production planning with multiple fuzzy goals. Int J Adv Manuf Technol 25(5):589–597CrossRefGoogle Scholar
  109. 109.
    Ertay T (2006) Fuzzy multi-objective interactive goal programming approach to aggregate production planning. Proceedings of the 7th International FLINS Conference, Genova, Italy. 29–31 August 2006 (pp. 299–306)Google Scholar
  110. 110.
    Tavakkoli-Moghaddam, R., Rabbani, M., Gharehgozli, A.H., & Zaerpour, N. (2007). A fuzzy aggregate production planning model for make-to-stock environments. 2007 IEEE International Conference on Industrial Engineering and Engineering Management, Singapore. 2–4 December 2007 (pp. 1609–1613)Google Scholar
  111. 111.
    Mezghani M, Loukil T, Aouni B (2012) Aggregate planning through the imprecise goal programming model: integration of the manager’s preferences. Int Trans Oper Res 19(4):581–597MathSciNetzbMATHCrossRefGoogle Scholar
  112. 112.
    Wang RC, Liang TF (2005a) Applying possibilistic linear programming to aggregate production planning. Int J Prod Econ 98(3):328–341CrossRefGoogle Scholar
  113. 113.
    Liang TF (2007a) Imprecise aggregate production planning decisions using interactive possibilistic linear programming. J Stat Manage Syst 10(3):451–472zbMATHCrossRefGoogle Scholar
  114. 114.
    Liang TF (2007b) Application of interactive possibilistic linear programming to aggregate production planning with multiple imprecise objectives. Prod Plan Control 18(7):548–560CrossRefGoogle Scholar
  115. 115.
    Kleindorfer P, Kunreuther H (1978) Stochastic horizons for the aggregate planning problem. Manag Sci 24(5):485–497MathSciNetzbMATHCrossRefGoogle Scholar
  116. 116.
    Günther HO (1982) A comparison of two classes of aggregate production planning models under stochastic demand. Engineering Costs and Production Economics 6(1):89–97CrossRefGoogle Scholar
  117. 117.
    Thompson SD, Davis WJ (1990) An integrated approach for modeling uncertainty in aggregate production planning. IEEE Transactions on Systems, Man, and Cybernetics 20(5):1000–1012CrossRefGoogle Scholar
  118. 118.
    Thompson SD, Wantanabe DT, Davis WJ (1993) A comparative study of aggregate production planning strategies under conditions of uncertainty and cyclic product demands. Int J Prod Res 31(8):1957–1979CrossRefGoogle Scholar
  119. 119.
    Jain A, Palekar US (2005) Aggregate production planning for a continuous reconfigurable manufacturing process. Comput Oper Res 32(5):1213–1236zbMATHCrossRefGoogle Scholar
  120. 120.
    Rakes TR, Franz LS, Wynne AJ (1984) Aggregate production planning using chance-constrained goal programming. Int J Prod Res 22(4):673–684CrossRefGoogle Scholar
  121. 121.
    Mezghani M, Loukil T, Aouni B (2011) Manager preferences modelling for stochastic aggregate planning. In: Trzaskalik T, Wachowicz T (eds) Multiple criteria decision making ‘10–11. Publisher of The University of Economics in Katowice, Katowice, pp 149–162Google Scholar
  122. 122.
    Kanyalkar AP, Adil GK (2010) A robust optimisation model for aggregate and detailed planning of a multi-site procurement-production-distribution system. Int J Prod Res 48(3):635–656zbMATHCrossRefGoogle Scholar
  123. 123.
    Entezaminia A, Heidari M, Rahmani D (2017) Robust aggregate production planning in a green supply chain under uncertainty considering reverse logistics: a case study. Int J Adv Manuf Technol 90(5–8):1507–1528CrossRefGoogle Scholar
  124. 124.
    Love CE, Turner M (1993) Note on utilizing stochastic optimal control in aggregate production planning. Eur J Oper Res 65(2):199–206zbMATHCrossRefGoogle Scholar
  125. 125.
    Shen RFC (1994) Aggregate production planning by stochastic control. Eur J Oper Res 73(2):346–359zbMATHCrossRefGoogle Scholar
  126. 126.
    Silva Filho OS (1999) An aggregate production planning model with demand under uncertainty. Prod Plann Control 10(8):745–756CrossRefGoogle Scholar
  127. 127.
    Lee WB, Khumawala BM (1974) Simulation testing of aggregate production planning models in an implementation methodology. Manag Sci 20(6):903–911CrossRefGoogle Scholar
  128. 128.
    McClain JO, Thomas J (1977) Horizon effects in aggregate production planning with seasonal demand. Manag Sci 23(7):728–736zbMATHCrossRefGoogle Scholar
  129. 129.
    Lee WB, Steinberg B, Khumawala BM (1983) Aggregate versus disaggregate production planning: a simulated experiment using LDR and MRP. Int J Prod Res 21(6):797–811CrossRefGoogle Scholar
  130. 130.
    Tang J, Fung RYK, Yung KL (2003) Fuzzy modelling and simulation for aggregate production planning. Int J Syst Sci 34(12–13):661–673MathSciNetzbMATHCrossRefGoogle Scholar
  131. 131.
    Dejonckheere J, Disney SM, Lambrecht MR, Towill DR (2003) Dynamics of aggregate planning. Prod Plan Control 14(6):497–516CrossRefGoogle Scholar
  132. 132.
    Wang D, Fang SC (1997) A genetics-based approach for aggregated production planning in a fuzzy environment. IEEE Transactions on Systems, Man, and Cybernetics-Part A: Systems and Humans 27(5):636–645CrossRefGoogle Scholar
  133. 133.
    Koren, Y., Heisel, U., Joveane, F., Moriwaki, T., Pritschow, G., Ulsoy, G., & van Brussel, H. (1999). Reconfigurable manufacturing systems. CIRP Annals, 1999, 48(2), 6–12Google Scholar
  134. 134.
    Bi ZM, Lang SYT, Shen W, Wang L (2008) Reconfigurable manufacturing systems: the state of the art. Int J Prod Res 46(4):967–992zbMATHCrossRefGoogle Scholar
  135. 135.
    Pang N, Ning Y (2017) An uncertain aggregate production planning model for vegetables. 2017 13th International Conference on Natural Computation, Fuzzy Systems and Knowledge Discovery (ICNC-FSKD), Guilin, China. 29–31 July 2017 (pp. 1386–1395)Google Scholar
  136. 136.
    Da Silva AF, Silva Marins FA (2014) A fuzzy goal programming model for solving aggregate production-planning problems under uncertainty: a case study in a Brazilian sugar mill. Energy Econ 45:196–204CrossRefGoogle Scholar
  137. 137.
    Koren Y, Shpitalni M (2010) Design of reconfigurable manufacturing systems. J Manuf Syst 29(2010):130–141CrossRefGoogle Scholar
  138. 138.
    Buxey G (1995) A managerial perspective on aggregate planning. Int J Prod Econ 41(1–3):127–133CrossRefGoogle Scholar
  139. 139.
    Buxey G (2003) Strategy not tactics drives aggregate planning. Int J Prod Econ 85(3):331–346CrossRefGoogle Scholar
  140. 140.
    Buxey G (2005) Aggregate planning for seasonal demand: reconciling theory with practice. International Journal of Operations and Production Management 25(11):1083–1100CrossRefGoogle Scholar
  141. 141.
    Cid Yáñez F, Frayret JM, Léger F, Rousseau A (2009) Agent-based simulation and analysis of demand-driven production strategies in the timber industry. Int J Prod Res 47(22):6295–6319CrossRefGoogle Scholar
  142. 142.
    Santa-Eulalia L, D’Amours S, Frayret J (2012) Agent-based simulations for advanced supply chain planning and scheduling. Int J Comput Integr Manuf 25(10):963–980CrossRefGoogle Scholar
  143. 143.
    Long Q, Zhang W (2014) An integrated framework for agent based inventory production transportation modelling and distributed simulation of supply chains. Inf Sci 277(2014):567–581CrossRefGoogle Scholar
  144. 144.
    Ab Wahab MN, Nefti-Meziani S, Atyabi A (2015) A comprehensive review of swarm optimisation algorithms. PLoS One 10(5):1–36CrossRefGoogle Scholar
  145. 145.
    Ciarallo FW, Akella R, Morton TE (1994) A periodic review, production planning model with uncertain capacity and uncertain demand: optimality of extended myopic policies. Manag Sci 40(3):320–332zbMATHCrossRefGoogle Scholar
  146. 146.
    Leung SCH, Wu Y (2004) A robust optimization model for stochastic aggregate production planning. Prod Plann Control 15(5):502–514CrossRefGoogle Scholar
  147. 147.
    Lockett AG, Muhlemann AP (1978) A stochastic programming model for aggregate production planning. Eur J Oper Res 2(5):350–356zbMATHCrossRefGoogle Scholar
  148. 148.
    Vörös J (1999) On the risk-based aggregate planning for seasonal products. Int J Prod Econ 59(1–3):195–201CrossRefGoogle Scholar

Copyright information

© Springer-Verlag London Ltd., part of Springer Nature 2019

Authors and Affiliations

  • Aboozar Jamalnia
    • 1
  • Jian-Bo Yang
    • 2
  • Ardalan Feili
    • 3
  • Dong-Ling Xu
    • 2
  • Gholamreza Jamali
    • 4
  1. 1.Operations Management and Information Technology Department, Faculty of ManagementKharazmi UniversityTehranIran
  2. 2.Decision and Cognitive Sciences Research Centre, Alliance Manchester Business SchoolThe University of ManchesterManchesterUK
  3. 3.School of ManagementFerdowsi University of MashhadMashhadIran
  4. 4.Department of Industrial Management, Faculty of HumanitiesPersian Gulf UniversityBushehrIran

Personalised recommendations