Two-stage teaching-learning-based optimization method for flexible job-shop scheduling under machine breakdown

  • Raviteja BuddalaEmail author
  • Siba Sankar Mahapatra
ORIGINAL ARTICLE
  • 65 Downloads

Abstract

In the real-world situations, uncertain events commonly occur and cause disruption of normal scheduled activities. Consideration of uncertain events during the scheduling process helps the organizations to make strategies for handling the uncertainties in an effective manner. Therefore, in the present paper, unexpected machine breakdowns have been considered during scheduling of jobs in a flexible job-shop environment. The objective is to obtain lowest possible makespan such that robust and stable schedules are produced even if an unexpected machine breakdown occurs. The robust and stable schedules may help to decrease the costs associated with unexpected machine failures. The present work uses a two-stage teaching-learning-based optimization (2S-TLBO) method to solve flexible job-shop scheduling problem (FJSP) under machine breakdown. In the first stage, the primary objective of makespan is optimized without considering any machine breakdown. In the second stage, a bi-objective function considering robustness and stability of the schedule is optimized under uncertainty of machine breakdowns. In order to incorporate the machine breakdown data to basic FJSP, a non-idle time insertion technique is used. In order to generate effective robust and stable predictive FJSP schedules, a rescheduling technique called modified affected operations rescheduling (mAOR) is used. The Kacem’s and Brandimarte’s benchmark problems have been solved and compared with other algorithms available in the literature. Results indicate that TLBO outperforms other algorithms by generating superior robust and stable predictive schedules. Statistical analysis is carried out to test the significance difference of the results obtained by TLBO with other algorithms.

Keywords

Flexible job-shop scheduling Machine breakdown Makespan Meta-heuristics Robustness Stability Teaching-learning-based optimization 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Notes

Acknowledgements

The authors express hearty thanks to the editor(s) and anonymous reviewers of IJAMT for their careful reading and suggestions in improving the quality of the paper.

References

  1. 1.
    Bagheri A, Zandieh M, Mahdavi I, Yazdani M (2010) An artificial immune algorithm for the flexible job-shop scheduling problem. Future Gener Comput Syst 26:533–541CrossRefGoogle Scholar
  2. 2.
    Buddala R, Mahapatra SS (2016) An effective teaching learning based optimization for flexible job shop scheduling. In Electr Electron Optim Tech (ICEEOT), Int Conf 3087–3092 IEEEGoogle Scholar
  3. 3.
    Gao J, Sun L, Gen M (2008) A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems. Comput Oper Res 35:2892–2907MathSciNetCrossRefzbMATHGoogle Scholar
  4. 4.
    Gao KZ, Suganthan PN, Pan QK, Chua TJ, Cai TX, Chong CS (2016) Discrete harmony search algorithm for flexible job shop scheduling problem with multiple objectives. J Intell Manuf 27:363–374CrossRefGoogle Scholar
  5. 5.
    Li X, Gao L (2016) An effective hybrid genetic algorithm and tabu search for flexible job shop scheduling problem. Int J Prod Econ 174:93–110CrossRefGoogle Scholar
  6. 6.
    Liouane N, Saad I, Hammad S, Borne P (2007) Ant systems & local search optimization for flexible job shop scheduling production. Int J Comput Commun Control 2:174–184CrossRefGoogle Scholar
  7. 7.
    Rahmati SHA, Zandieh M (2012) A new biogeography-based optimization (BBO) algorithm for the flexible job shop scheduling problem. Int J Adv Manuf Tech 58:1115–1129CrossRefGoogle Scholar
  8. 8.
    Singh MR, Mahapatra SS (2016) A quantum behaved particle swarm optimization for flexible job shop scheduling. Comput Ind Eng 93:36–44CrossRefGoogle Scholar
  9. 9.
    Wang L, Zhou G, Xu Y, Wang S, Liu M (2012) An effective artificial bee colony algorithm for the flexible job-shop scheduling problem. Int J Adv Manuf Tech 60:303–315CrossRefGoogle Scholar
  10. 10.
    Wu X, Wu S (2017) An elitist quantum-inspired evolutionary algorithm for the flexible job-shop scheduling problem. J Intell Manuf 28:1441–1457CrossRefGoogle Scholar
  11. 11.
    Xing LN, Chen YW, Wang P Zhao QS, Xiong J (2010) A knowledge-based ant colony optimization for flexible job shop scheduling problems. Appl Soft Comput 10:888–896CrossRefGoogle Scholar
  12. 12.
    Yuan Y, Xu H, Yang J (2013) A hybrid harmony search algorithm for the flexible job shop scheduling problem. Appl Soft Comput 13:3259–3272CrossRefGoogle Scholar
  13. 13.
    Zhang G, Gao L, Shi Y (2011) An effective genetic algorithm for the flexible job-shop scheduling problem. Expert Syst Appl 38:3563–3573CrossRefGoogle Scholar
  14. 14.
    Pinedo, M. (2008) Scheduling: theory, algorithms and systemsGoogle Scholar
  15. 15.
    Deng Q, Gong G, Gong X, Zhang L, Liu W, Ren Q (2017) A bee evolutionary guiding nondominated sorting genetic algorithm II for multiobjective flexible job-shop scheduling. Comput Intell Neurosci 2017:1–20.  https://doi.org/10.1155/2017/5232518 Google Scholar
  16. 16.
    Karthikeyan S, Asokan P, Nickolas S, Page T (2015) A hybrid discrete firefly algorithm for solving multi-objective flexible job shop scheduling problems. Int J Bio-Inspired Comput 7:386–401CrossRefGoogle Scholar
  17. 17.
    Kemmoe-Tchomte S, Lamy D, Tchernev N (2017) An effective multi-start multi-level evolutionary local search for the flexible job-shop problem. Eng Appl Artif Intell 62:80–95CrossRefGoogle Scholar
  18. 18.
    Li JQ, Pan QK, Liang YC (2010) An effective hybrid tabu search algorithm for multi-objective flexible job-shop scheduling problems. Comput Ind Eng 59:647–662CrossRefGoogle Scholar
  19. 19.
    Li JQ, Pan QK, Tasgetiren MF (2014) A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities. Appl Math Model 38:1111–1132MathSciNetCrossRefzbMATHGoogle Scholar
  20. 20.
    Perez MA, Raupp FM (2016) A Newton-based heuristic algorithm for multi-objective flexible job-shop scheduling problem. J Intell Manuf 27:409–416CrossRefGoogle Scholar
  21. 21.
    Singh MR, Singh M, Mahapatra SS, Jagadev N (2016) Particle swarm optimization algorithm embedded with maximum deviation theory for solving multi-objective flexible job shop scheduling problem. Int J Adv Manuf Tech 85:2353–2366CrossRefGoogle Scholar
  22. 22.
    Xia W, Wu Z (2005) An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems. Comput Ind Eng 48:409–425CrossRefGoogle Scholar
  23. 23.
    Xing LN, Chen YW, Yang KW (2009a) Multi-objective flexible job shop schedule: design and evaluation by simulation modeling. Appl Soft Comput 9:362–376CrossRefGoogle Scholar
  24. 24.
    Xing LN, Chen YW, Yang KW (2009b) An efficient search method for multi-objective flexible job shop scheduling problems. J Intell Manuf 20:283–293CrossRefGoogle Scholar
  25. 25.
    Subramaniam V, Raheja AS (2003) mAOR: a heuristic-based reactive repair mechanism for job shop schedules. Int J Adv Manuf Techn 22:669–680CrossRefGoogle Scholar
  26. 26.
    Ourari S, Berrandjia L, Boulakhras R, Boukciat A, Hentous H (2015) Robust approach for centralized job shop scheduling: sequential flexibility. IFAC-PapersOnLine 48:1960–1965CrossRefGoogle Scholar
  27. 27.
    Vieira GE, Herrmann JW, Lin E (2003) Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J Scheduling 6:39–62MathSciNetCrossRefzbMATHGoogle Scholar
  28. 28.
    Chaari T, Chaabane S, Aissani N, Trentesaux D (2014) Scheduling under uncertainty: survey and research directions. In Adv Logist Transport (ICALT), 2014 Int Conf 229–234 IEEEGoogle Scholar
  29. 29.
    He W, Sun D, Liao X (2013) Applying novel clone immune algorithm to solve flexible job shop problem with machine breakdown. J Inf Comput Sci 10:2783–2797CrossRefGoogle Scholar
  30. 30.
    Liu N, Abdelrahman MA, Ramaswamy S (2007a) A complete multiagent framework for robust and adaptable dynamic job shop scheduling. IEEE Trans Syst Man Cybern Part C Appl Rev 37:904–916CrossRefGoogle Scholar
  31. 31.
    Liu H, Abraham A, Grosan C (2007b) A novel variable neighborhood particle swarm optimization for multi-objective flexible job-shop scheduling problems. In Digital Inf Manage 2007 ICDIM'07. 2nd Int Conf 1:138–145 IEEE Google Scholar
  32. 32.
    Bidot J, Vidal T, Laborie P, Beck JC (2009) A theoretic and practical framework for scheduling in a stochastic environment. J Scheduling 12(3):315–344MathSciNetCrossRefzbMATHGoogle Scholar
  33. 33.
    Xiong J, Xing LN, Chen YW (2013) Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns. Int J Prod Econ 141:112–126CrossRefGoogle Scholar
  34. 34.
    Wu SD, Storer RH, Pei-Chann C (1993) One-machine rescheduling heuristics with efficiency and stability as criteria. Comput Oper Res 20:1–14CrossRefzbMATHGoogle Scholar
  35. 35.
    Goren S, Sabuncuoglu I (2009) Optimization of schedule robustness and stability under random machine breakdowns and processing time variability. IIE Trans 42:203–220CrossRefGoogle Scholar
  36. 36.
    Jensen MT (2001) Improving robustness and flexibility of tardiness and total flow-time job shops using robustness measures. Appl Soft Comput 1:35–52CrossRefGoogle Scholar
  37. 37.
    Al-Hinai N, ElMekkawy TY (2011) Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm. Int J Prod Econ 132:279–291CrossRefGoogle Scholar
  38. 38.
    Wang K, Choi SH (2012) A decomposition-based approach to flexible flow shop scheduling under machine breakdown. Int J Prod Res 50:215–234CrossRefGoogle Scholar
  39. 39.
    Al-Hinai N, ElMekkawy TY (2012) Solving the flexible job shop scheduling problem with uniform processing time uncertainty. World Acad Sci, Eng Tech 64:996–1001Google Scholar
  40. 40.
    Chiang, W Y, Fox MS (1990) Protection against uncertainty in a deterministic schedule. In Fourth Int Conf Expert Syst Prod Oper Manage South California, USA 17:Google Scholar
  41. 41.
    Dalfard VM, Mohammadi G (2012) Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints. Comput Math Appl 64:2111–2117MathSciNetCrossRefzbMATHGoogle Scholar
  42. 42.
    Mouelhi-Chibani W, Pierreval H (2010) Training a neural network to select dispatching rules in real time. Comput Ind Eng 58:249–256CrossRefGoogle Scholar
  43. 43.
    Zbib N, Pach C, Sallez Y, Trentesaux D (2012) Heterarchical production control in manufacturing systems using the potential fields concept. J Intell Manuf 23:1649–1670CrossRefGoogle Scholar
  44. 44.
    Cowling PI, Ouelhadj D, Petrovic S (2004) Dynamic scheduling of steel casting and milling using multi-agents. Prod Plann Control 15:178–188CrossRefGoogle Scholar
  45. 45.
    Gao KZ, Suganthan PN, Tasgetiren MF, Pan QK, Sun QQ (2015) Effective ensembles of heuristics for scheduling flexible job shop problem with new job insertion. Comput Ind Eng 90:107–117CrossRefGoogle Scholar
  46. 46.
    Wu LH, Chen X, Chen XD, Chen QX (2009) The research on proactive-reactive scheduling framework based on real-time manufacturing information. In Mater Sci Forum 626:789–794 Trans Tech Publ CrossRefGoogle Scholar
  47. 47.
    Li W, Cao J (1995) Stochastic scheduling on a single machine subject to multiple breakdowns according to different probabilities. Oper Res Lett 18:81–91MathSciNetCrossRefzbMATHGoogle Scholar
  48. 48.
    Kasap N, Aytug H, Paul A (2006) Minimizing makespan on a single machine subject to random breakdowns. Oper Res Lett 34:29–36MathSciNetCrossRefzbMATHGoogle Scholar
  49. 49.
    Allahverdi A (1995) Two-stage production scheduling with separated set-up times and stochastic breakdowns. J Oper Res Soc 46:896–904CrossRefzbMATHGoogle Scholar
  50. 50.
    Allahverdi A (1996) Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness. Comp Oper Res 23:909–916CrossRefzbMATHGoogle Scholar
  51. 51.
    Allahverdi A, Mittenthal J (1994) Two-machine ordered flowshop scheduling under random breakdowns. Math Comput Modell 20:9–17CrossRefzbMATHGoogle Scholar
  52. 52.
    Allahverdi A, Mittenthal J (1998) Dual criteria scheduling on a two-machine flowshop subject to random breakdowns. Int Trans Oper Res 5:317–324CrossRefGoogle Scholar
  53. 53.
    Alcaide D, Rodriguez-Gonzalez A, Sicilia J (2002) An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns. Eur J Oper Res 140:384–398MathSciNetCrossRefzbMATHGoogle Scholar
  54. 54.
    Alcaide D, Rodriguez-Gonzalez A, Sicilia J (2005) A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures. Int J Flex Manuf Syst 17:201–226CrossRefzbMATHGoogle Scholar
  55. 55.
    Luh PB, Chen D, Thakur LS (1999) An effective approach for job-shop scheduling with uncertain processing requirements. IEEE Trans Rob Autom 15:328–339CrossRefGoogle Scholar
  56. 56.
    Lei D (2011) Scheduling stochastic job shop subject to random breakdown to minimize makespan. Int J Adv Manuf Tech 55:1183–1192CrossRefGoogle Scholar
  57. 57.
    Ahmadi E, Zandieh M, Farrokh M, Emami SM (2016) A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms. Comput Oper Res 73:56–66MathSciNetCrossRefzbMATHGoogle Scholar
  58. 58.
    Park J, Mei Y, Nguyen S, Chen G, Zhang M (2017). Investigating the generality of genetic programming based hyper-heuristic approach to dynamic job shop scheduling with machine breakdown. In Australasian Conf Artif Life Comput Intell 301–313 SpringerGoogle Scholar
  59. 59.
    Zandieh M, Khatami AR, Rahmati SH (2017) Flexible job shop scheduling under condition-based maintenance: improved version of imperialist competitive algorithm. Appl Soft Comput 58:449–464CrossRefGoogle Scholar
  60. 60.
    El Khoukhi F, Boukachour J, Alaoui AE (2017) The “dual-ants colony”: a novel hybrid approach for the flexible job shop scheduling problem with preventive maintenance. Comput Ind Eng 106:236–255CrossRefGoogle Scholar
  61. 61.
    Jensen MT (2003) Generating robust and flexible job shop schedules using genetic algorithms. IEEE Trans Evol Comput 7:275–288CrossRefGoogle Scholar
  62. 62.
    Singh MR, Mahapatra SS, Mishra R (2014) Robust scheduling for flexible job shop problems with random machine breakdowns using a quantum behaved particle swarm optimisation. Int J Serv Oper Manage 20:1–20Google Scholar
  63. 63.
    Nouiri M, Bekrar A, Jemai A, Trentesaux D, Ammari AC, Niar S (2017) Two stage particle swarm optimization to solve the flexible job shop predictive scheduling problem considering possible machine breakdowns. Comput Ind Eng 112:595–606CrossRefGoogle Scholar
  64. 64.
    Rao RV, Savsani VJ, Vakharia DP (2011) Teaching–learning-based optimization: a novel method for constrained mechanical design optimization problems. Comput Aided Des 43:303–315CrossRefGoogle Scholar
  65. 65.
    Xu Y, Wang L, Wang SY, Liu M (2015) An effective teaching–learning-based optimization algorithm for the flexible job-shop scheduling problem with fuzzy processing time. Neurocomputing 148:260–268CrossRefGoogle Scholar
  66. 66.
    Xie Z, Zhang C, Shao X, Lin W, Zhu H (2014) An effective hybrid teaching–learning-based optimization algorithm for permutation flow shop scheduling problem. Adv Eng Softw 77:35–47CrossRefGoogle Scholar
  67. 67.
    Keesari HS, Rao RV (2014) Optimization of job shop scheduling problems using teaching-learning-based optimization algorithm. Opsearch 51:545–561MathSciNetCrossRefzbMATHGoogle Scholar
  68. 68.
    Baykasoglu A, Hamzadayi A, Köse SY (2014) Testing the performance of teaching–learning based optimization (TLBO) algorithm on combinatorial problems: flow shop and job shop scheduling cases. Inf Sci 276:204–218MathSciNetCrossRefGoogle Scholar
  69. 69.
    Shen JN, Wang L, Zheng HY (2016) A modified teaching–learning-based optimisation algorithm for bi-objective re-entrant hybrid flowshop scheduling. Int J Prod Res 54:3622–3639CrossRefGoogle Scholar
  70. 70.
    Buddala R, Mahapatra SS (2018) An integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method. J Ind Eng Int 1–12.  https://doi.org/10.1007/s40092-018-0280-8
  71. 71.
    Buddala R, Mahapatra SS (2017) Improved teaching–learning-based and JAYA optimization algorithms for solving flexible flow shop scheduling problems. J Ind Eng Int 14:555–570.  https://doi.org/10.1007/s40092-017-0244-4 CrossRefGoogle Scholar
  72. 72.
    Ho NB, Tay JC (2004) GENACE: an efficient cultural algorithm for solving the flexible job-shop problem. In Evolutionary computation, 2004. CEC2004. Congress on 2004 (Vol. 2, pp. 1759–1766). IEEEGoogle Scholar
  73. 73.
    Palacios JJ, González MA, Vela CR, González-Rodríguez I, Puente J (2015) Genetic tabu search for the fuzzy flexible job shop problem. Comput Oper Res 54:74–89MathSciNetCrossRefzbMATHGoogle Scholar
  74. 74.
    Abumaizar RJ, Svestka JA (1997) Rescheduling job shops under random disruptions. Int J Prod Res 35:2065–2082CrossRefzbMATHGoogle Scholar
  75. 75.
    Kacem I, Hammadi S, Borne P (2002a) Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems. IEEE Trans Syst Man Cybern Part C Appl Rev 32:1–13CrossRefzbMATHGoogle Scholar
  76. 76.
    Kacem I, Hammadi S, Borne P (2002b) Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic. Math Comput Simul 60:245–276MathSciNetCrossRefzbMATHGoogle Scholar
  77. 77.
    Dong YH, Jang J (2012) Production rescheduling for machine breakdown at a job shop. Int J Prod Res 50:2681–2691CrossRefGoogle Scholar
  78. 78.
    Brandimarte P (1993) Routing and scheduling in a flexible job shop by tabu search. Ann Oper Res 41:157–183CrossRefzbMATHGoogle Scholar
  79. 79.
    Jiang Z, Zuo L, Mingcheng E (2014) Study on multi-objective flexible job-shop scheduling problem considering energy consumption. J Ind Eng Manage 7:589–604Google Scholar

Copyright information

© Springer-Verlag London Ltd., part of Springer Nature 2018

Authors and Affiliations

  1. 1.Department of Mechanical EngineeringNational Institute of Technology RourkelaRourkelaIndia

Personalised recommendations