Abstract
Japanese wartime economy demanded domestic cobalt production. This paper describes a process operated for two years at the Besshi mine and smelter on extremely low grade (0.1 pet Co) pyrite concentrates obtained from copper ore. The steps in the process were roasting, leaching, precipitation, reduction fusion to crude cobalt, and finally refining by electrolysis to 99+ pet.
Preview
Unable to display preview. Download preview PDF.
Copyright information
© The Minerals, Metals & Materials Society 1951