  1. 1.

    The experience of designing, constructing, and operating the Zagorsk PSS confirmed the correctness of the decisions made earlier about constructing a series of large PSSs in the country, their technical need and economic expediency.

     
  2. 2.

    When examining the question of constructing new PSSs, it is advisable to take the same main equipment as at the Zagorsk PSS as the basis. This will make it possible at all stages of creating a new PSS to considerably reduce material and financial expenditures and to shorten construction time.

     

Keywords

Load Curve Main Equipment Power Pool Reversible Unit Hydropower Construction 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Kluwer Academic/Plenum Publishers 2000

Authors and Affiliations

  • V. M. Vokhmyanin
  • V. M. Plotnikov

There are no affiliations available

Personalised recommendations