Hydrotechnical Construction

, Volume 28, Issue 4, pp 239–242 | Cite as

Problems of operating the 500-kV outdoor electrical equipment of the Sayano-Shushenskoe hydroelectric station

  • A. N. Mitrofanov
Article
  • 19 Downloads

Conclusions

  1. 1.

    The design scheme of the 500-kV OEE of the Sayano-Shushenskoe hydrostation has a number of substantial shortcomings reducing the reliability of power output. Reconstruction of the middle network of the existing “4/3” scheme to three networks with two switches per connection is the most optimal variant of reconstruction. Sectioning of the collecting bus systems is necessary for a further increase of the reliability of the scheme.

     
  2. 2.

    In the case of repair works on equipment of small nonstandard switchgear, such as the 500-kV OEE of the Sayano-Shushenskoe hydrostation, it is necessary to use special equipment and mechanisms, the development of which must be recommended to domestic industry.

     

Keywords

Power Output Energy Source Power Generation Power Engineer Renewable Energy Source 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Copyright information

© Plenum Publishing Corporation 1994

Authors and Affiliations

  • A. N. Mitrofanov

There are no affiliations available

Personalised recommendations