Abstract
Procedures for calculating preference and risk indicators that were previously applied to mono interval objects are proposed within the collective-risk estimating method in the case of pairwise comparison for polyinterval objects, generalized interval, and fuzzy objects. The procedures are based on the defuzzification of interval estimates of preference and risk indicators related to mono intervals at alpha-levels in the case of fuzzy polyinterval objects and on the presentation of generalized interval estimates as a probabilistic mixture of the distributions forming such an estimate. Some differences and relationships in approach of generalized interval estimations and fuzzy approach for comparing alternatives are studied. It is established that generalized uniform distributions of probability in the approach of generalized interval estimates are obtained if we use the defuzzification methods for uniform distributions on alpha levels of fuzzy objects discussed in the paper. The manner is shown in which the defuzzification procedures lead to one-numeric estimates for the interval characteristics of fuzzy objects, similar to the numerical characteristics of distribution functions of probability theory, mathematical expectation, variance, and mean semideviation. Depending on the defuzzification method, different probability distributions in the formalism of generalized interval estimates can be obtained from uniform distributions on alpha-levels of fuzzy objects. However, the entire variety of probability distributions that arise in the last formalism is not exhausted by the distributions obtained in this manner.
Similar content being viewed by others
REFERENCES
Orlovsky, S.A., Problemy prinyatiya reshenii pri nechetkoi iskhodnoi informatsii (Decision Making Problems with Fuzzy Source Information), Moscow: Nauka, 1981.
Chugunov, N., Shepelyov, G., and Sternin, M., The generalized interval estimations in decision making under uncertainty, Int. J. Technol. Policy Manage., 2008, vol. 8, no. 3, pp. 298–321.
Sternin, M.Yu. and Shepelev, G.I., Generalized interval expert estimates in decision making, Dokl. Math., 2010, vol. 81, no. 3, pp. 485–486.
Fishburn, P.C., Mean-risk analysis with risk associated with below-target returns, Am. Econ. Rev., 1977, vol. 67, pp. 116–126.
Ogryczak, W. and Ruszczyński, A., From stochastic dominance to mean-risk models: Semideviations as risk measures, Eur. J. Oper. Res., 1999, vol. 116, pp. 33–50.
Podinovskii, V.V., Numerical risk measures as selection criteria for probabilistic uncertainty, Iskusstv. Intell. Prinyatie Reshenii, 2015, no. 2, pp. 60–74.
Shepelev, G.I., Comparing poly-interval alternatives: The “mean-risk” method, Iskusstv. Intell. Prinyatie Reshenii, 2019, no. 1, pp. 16–26.
Shepelev, G., Decision-making in groups of interval alternatives, Inf. Theor. Appl., 2016, vol. 23, no. 4, pp. 303–320.
Shepelev, G.I. and Zhiyanov, V.I., A comprehensive method for comparing interval alternatives under risk, Vestn. Tsentr. Ekon.-Mat. Inst. Ross. Akad. Nauk, 2018, no. 3. http://cemi.jes.su/s111111110000061-0-1. Accessed January 15, 2019. https://doi.org/10.33276/S0000061-0-1
Sternin, M.Yu. and Shepelev, G.I., Risk estimation in a set of interval alternatives, Iskusstv. Intell. Prinyatie Reshenii, 2015, vol. 3, pp. 83–91.
Diligenskii, N.V., Dymova, L.G., and Sevast’yanov, P.V., Nechetkoe modelirovanie i mnogokriterialnaya optimizatsiya proizvodstvennykh system v usloviyakh neopredelennosti: Tekhnologiya, ekonomika, ekologiya (Fuzzy Modeling and Multi-Criteria Optimization of Production Systems under Uncertainty: Technology, Economy, and Ecology), Moscow: Mashinostroenie, 2004.
Shepelyov, G. and Sternin, M., Methods for comparison of alternatives described by interval estimations, Int. J. Bus. Continuity Risk Manage., 2011, vol. 2, no. 1, pp. 56–69.
Dubois, D. and Prade, H., Theorie des possibilities, Paris: Masson, 1988.
Nedosekin, A.O., Nechetko-mnozhestvennyi analis riska finansovykh investitsi (Fuzzy-Set Analysis of Finance Investments), St. Petersburg, 2002.
Sternin, M.Yu., Shepelev, G.I., and Shepelev, N.G., Properties of the generalized uniform probability distribution, Trudy 2-oi Mezhdunarodnoi konferentsii “Sistemny analiz i informatsionnye tekhnologii” (Proc. 2nd International Conference System Analysis and Information Technologies (SAIT-2007)), Moscow, 2007, pp. 239–242.
Sternin, M.Yu. and Shepelev, G.I., The adequacy of point criteria during the evaluation and comparison of interval alternatives problems, Sci. Tech. Inf. Process., 2014, vol. 41, pp. 404–412.
Shakhnov, I.F., Express analysis of ordering of interval values, Avtom. Telemekh., 2004, vol. 10, pp. 67–84.
Orlov, A.I., Nechislovaya statistika (Non-Numeric Statistics), Moscow: MZ-Press, 2004.
Poroskun, V.I., Sternin, G.I., and Shepelev, G.I., DSS for evaluating oil and gas objects on early stages of prospecting, Nauchno-Tekh. Inf., Ser. 2, 1998, vol. 3, pp. 27–38.
Funding
This work was supported in part by the Russian Foundation for Basic Research (project nos. 16-29-12864, 17-07-00512, 17-29-07021, 18-07-00280, 19-29-01047).
Author information
Authors and Affiliations
Corresponding author
Ethics declarations
The authors declare that they have no conflicts of interest.
About this article
Cite this article
Shepelev, G.I. Comparing Polyinterval Alternatives: Collective Risk Estimation. Sci. Tech. Inf. Proc. 47, 284–289 (2020). https://doi.org/10.3103/S0147688220050068
Received:
Published:
Issue Date:
DOI: https://doi.org/10.3103/S0147688220050068