Introduction

For most of the industrial production process, the variation in the production process is due to two causes of fluctuation namely, the chance reason for the discrepancy and assignable reason for the fluctuation. Since Shewhart introduced control chart procedures to monitor the different manufacturing processes Shewhart control charts are more extensively used in most of the manufacturing industries and they are conformed to an effective tool to detect large shifts rapidly1.

The CV control chart is intended to inspect the method when the mean and standard deviation (SD) become shaky. Conventionally, the Shewhart control charts in support of variables are used to monitor mean and variance. To examine the process mean a Shewhart mean (\(\overline{X}\)) control chart may be utilized, whereas, for monitoring the process variance Shewhart range (R) or SD (S) or Variance (\(S^{2}\)) control charts. Hence, to examine the process mean and variance at the same time, single chart is studied by many authors, more details can be seen in Costa2.

Apart from this, Reed et al.3 rightly pointed out that, to monitor the quality control in chemical and biological experimentation and4,5 stated that CV chart has more application in the field of chemicals and metal manufacturing industries. Nevertheless, for some manufacturing processes the ratio of standard deviation and mean remains constant. Therefore, a statistic CV can be defined as the proportion of SD to mean, which means, CV, \(\gamma = \frac{\sigma }{\mu }\). Kang et al. suggested a CV chart for examining the production process6. For more applications and study on control charts for CV one can refer to7,8,9,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25.

Several researchers developed diversified sampling designs to get better efficiency towards control charts. Recently, more researchers focused on multiple dependent state (MDS) sampling in designing a new control chart. In this scheme, to decide about the state of the process the previous subgroup information is used in addition to the current subgroup information. Wortham and Baker proposed the MDS sampling in quality control charts26. MDS design is more efficient than the existing single sampling plans due to considering the previous lot along with the current lot consideration to make a decision. For more details, see Balamurali and Jun27. Vaerst developed a procedure to construct multiple deferred state sampling plan28. Soundararajan and Vijayaraghavan studied the designing multiple deferred state sampling plans involving minimum risks29. Soundararajan and Vijayaraghavan developed the procedure to construction and selection of multiple dependent (deferred) state sampling plan30. Later on Kuralmani and Govlndaraju studied multiple deferred (dependent) state sampling plans for given acceptable quality level and limiting quality level31,32. Aslam with various authors developed numerous articles using multiple dependent state sampling for various distributions refer33,34,35,36,37,38. Khan et al. developed a new X-bar control chart for multiple dependent state sampling using neutrosophic exponentially weighted moving average statistics with application to monitoring road accidents and road injuries39. Saghir et al. studied monitoring process variation using modified EWMA40. Balamurali and Jeyadurga attempted an attribute np control chart for monitoring mean life using multiple deferred state sampling based on truncated life tests41. Noor-ul-Amin and Riaz considered EWMA control chart for coefficient of variation using log-normal transformation under ranked set sampling42. Nguyen et al. studied the performance of VSI Shewhart control chart for monitoring the coefficient of variation in the presence of measurement errors43. Zamanzade Al-Omari considered a new ranked set sampling for estimating the population mean and variance44. Nawaz and Han developed a control chart to monitoring the process location by using new ranked set sampling-based memory type45.

More recently, designing the control charts using generalized multiple dependent state sampling for various environments have been studied by various authors for more details see46,47,48,49,50,51. The chief advantage of GMDS schemes over MDS schemes is flexibility in GMDS scheme, by using only k out of m previous values instead of the whole previous m values. It is important to highlight that, in simple random sample (SRS); decisions regarding the process are made solely based on information from a single sample. In contrast, MDS and GMDS consider the previous m or k out of m subgroups in the in-control area when faced with indecision, contributing to the decision-making process. Soundararajan and Vijayaraghavan30 considered a new attribute control chart using multiple dependent state sampling, Yan et al.16 studied designing a multiple state repetitive group sampling plan based on the coefficient of variation and46 deliberated a new variable control chart under generalized multiple dependent state sampling. Whereas, in this study, we considered the design of coefficient of variation control chart using GMDS sampling. Woodall et al.52 argued that the MDS and GMDS are equivalent to run-rule control chart. Muñoz et al.53 showed that the performance of run-rule control charts can be improved if the initial state is designed by MDS or GMDS.

This article is primarily motivated by the need to create a specialized control chart aimed at monitoring and assessing the variability within a given process. In particular, this control chart is centered on the Coefficient of Variation (CV), a critical statistical measure used to evaluate the relative variability of a dataset. To achieve this, the study introduces the concept of a control chart that operates in tandem with the Generalized Multiple Dependent State (GMDS) sampling scheme, which has not been extensively explored in the existing literature. One notable aspect of this research is the apparent gap in the current body of knowledge. Through a thorough review of existing literature, it becomes evident that there is a lack of comprehensive research that has proposed or examined the use of CV control charts in conjunction with the GMDS sampling design. This gap underscores the novelty and significance of the present study, as it not only seeks to fill this void in the research landscape but also aims to offer a robust and effective solution for monitoring and maintaining process quality and control, especially in situations where even minor to moderate shifts in the coefficient of variation can have substantial implications. The remaining paper can be organized as follows. The design of the CV control chart (\(\gamma\)-control chart) with reference to GMDS sampling is given in "Design of γ-control chart based on GMDS sampling" section. The tables of chart constants along with out-of-control ARLs are conducted in "Results and discussion" section. The sensitivity of the designed control chart over existing control charts are contributed in "Comparative studies" section. Also, methodology described using real practical data and a simulation analysis is also provided in "Comparative studies"section. In the end, some closing comments are provided in "Conclusions" section.

Design of \(\gamma\)-control chart based on GMDS sampling

Let us assume that \(Y_{1} ,Y_{2} ,...,Y_{n}\) be an independent values of the normal population with process mean \(\mu\) and SD, \(\sigma\). The theoretical CV (\(\gamma\)) is denoted by \(\gamma = \frac{\sigma }{\mu }\). The observed CV (\(\hat{\gamma }\)) is given by \(\hat{\gamma } = \frac{{S_{Y} }}{{\overline{Y}}}\). Where, \(\overline{Y} = \frac{1}{n}\sum\nolimits_{i = 1}^{n} {Y_{i} \;{\text{and}}\;S_{Y} = \sqrt {\frac{1}{n - 1}\sum\nolimits_{i = 1}^{n} {\left( {Y_{i} - \overline{Y}} \right)^{2} } } }\).

According to54, if the measurement of characteristic follows \(N\left( {\mu ,\sigma^{2} } \right)\) then the term \(\frac{\sqrt n }{{\hat{\gamma }}}\) is follows as \(t_{n - 1,\delta }\) where \(t_{n - 1,\delta }\) is a non-central \(t\) distribution with \(\left( {n - 1} \right)\) degrees of freedom (d. f.) and non-central constraint \(\delta = \frac{\sqrt n }{\gamma }\). Hence, the distribution function of \(\hat{\gamma }\) is obtained as:

$$ G_{{\hat{\gamma }}} \left( {x|n,\gamma } \right) = 1 - G_{t} \left( {\frac{\sqrt n }{x}|n - 1,\frac{\sqrt n }{\gamma }} \right), $$
(1)

where \(G_{t} (.)\) is the distribution function of the non-central \(t\) distribution.

The designed \(\gamma\)-control chart with reference to GMDS sampling consists of the following inner and outer control limits:

Inner control limits are

$${\text{UCL}}_{2} = \mu_{0} \left( {\hat{\gamma }} \right) + k_{2} \,\sigma_{0} \left( {\hat{\gamma }} \right)$$

and

$$ {\text{LCL}}_{2} = \mu_{0} \left( {\hat{\gamma }} \right) - k_{2} \,\sigma_{0} \left( {\hat{\gamma }} \right) $$
(2)

Outer control limits are

$${\text{UCL}}_{1} = \mu_{0} \left( {\hat{\gamma }} \right) + k_{1} \,\sigma_{0} \left( {\hat{\gamma }} \right)$$

and

$$ {\text{LCL}}_{1} = \mu_{0} \left( {\hat{\gamma }} \right) - k_{1} \,\sigma_{0} \left( {\hat{\gamma }} \right) $$
(3)

where \(k_{1}\) and \(k_{2}\) are the chart constants to be obtained, \(\mu_{0} \left( {\hat{\gamma }} \right)\) and \(\sigma_{0} \left( {\hat{\gamma }} \right)\) are respectively the mean and standard deviation of sample CV \(\hat{\gamma }\) when the process is under control. We use the following approximations for \(\mu_{0} \left( {\hat{\gamma }} \right)\) and \(\sigma_{0} \left( {\hat{\gamma }} \right)\) proposed by54 and used by55,56.

$$ \mu_{0} \left( {\hat{\gamma }} \right) \approx \gamma_{0} \left[ {1 + \frac{1}{n}\left( {\gamma_{0}^{2} - \frac{1}{4}} \right) + \frac{1}{{n^{2} }}\left( {3\gamma_{0}^{4} - \frac{{\gamma_{0}^{2} }}{4} - \frac{7}{12}} \right) + \frac{1}{{n^{3} }}\left( {15\gamma_{0}^{6} - \frac{{3\gamma_{0}^{4} }}{4} - \frac{{7\gamma_{0}^{2} }}{32} - \frac{19}{{128}}} \right)} \right] $$
(4)
$$ \sigma_{0} \left( {\hat{\gamma }} \right) \approx \gamma_{0} \left[ {\frac{1}{n}\left( {\gamma_{0}^{2} + \frac{1}{2}} \right) + \frac{1}{{n^{2} }}\left( {8\gamma_{0}^{4} + \gamma_{0}^{2} + \frac{3}{8}} \right) + \frac{1}{{n^{3} }}\left( {69\gamma_{0}^{6} + \frac{{7\gamma_{0}^{4} }}{2} + \frac{{3\gamma_{0}^{2} }}{4} + \frac{3}{16}} \right)} \right]^{{{1 \mathord{\left/ {\vphantom {1 2}} \right. \kern-0pt} 2}}} $$
(5)

where \(\gamma_{0}\) is observed CV when the process under control.

The designed \(\gamma\)-control chart with reference to the GMDS scheme is functioning as the following steps:

  1. 1.

    Calculate \(\hat{\gamma }\) from the observed sample values of size n.

  2. 2.

    The manufactured output is said to be under control if \(LCL_{2} \le \hat{\gamma } \le UCL_{2}\) and the manufactured output is declared as out-of-control if \(\hat{\gamma } \ge UCL_{1} \,\,{\text{or}}\,\hat{\gamma } \le LCL_{1}\).Otherwise, go to Step3.

  3. 3.

    The manufactured output is declared as under control whenever k (k ≤ m) out of m proceeding \(\hat{\gamma }\) terms fall within \(LCL_{2} \le \hat{\gamma } \le UCL_{2}\), otherwise, the manufactured output is considered as out of control.

The probability that the phenomenon is under control with reference to GMDS sampling scheme47 is given below:

$$ P_{in.0} = P_{a.0} + P_{s.0} \left[ {\sum\limits_{j = k}^{m} {\left( \begin{gathered} m \hfill \\ j \hfill \\ \end{gathered} \right)P_{a.0}^{j} \left( {1 - P_{a.0} } \right)^{m - j} } } \right] $$
(6)

where

$$ \begin{aligned} P_{a.0} & = p\left( {LCL_{2} \le \hat{\gamma } \le UCL_{2} |\gamma = \gamma_{0} } \right) \\ & = p\left( {\hat{\gamma } \le UCL_{2} |\gamma = \gamma_{0} } \right) - p\left( {\hat{\gamma } \le LCL_{2} |\gamma = \gamma_{0} } \right) \\ & = G_{{\hat{\gamma }}} \left( {UCL_{2} |\gamma = \gamma_{0} } \right) - G_{{\hat{\gamma }}} \left( {LCL_{2} |\gamma = \gamma_{0} } \right) \\ & = 1 - G_{t} \left[ {{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {UCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right. \kern-0pt} {UCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right] - \left( {1 - G_{t} \left[ {{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {LCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right. \kern-0pt} {LCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right]} \right) \\ & = G_{t} \left[ {{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {LCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right. \kern-0pt} {LCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right] - G_{t} \left[ {{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {UCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right. \kern-0pt} {UCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right] \\ \end{aligned} $$
(7)

and

$$ \begin{aligned} P_{s.0} & = p\left( {LCL_{1} \le \hat{\gamma } \le LCL_{2} |\gamma = \gamma_{0} } \right) + p\left( {UCL_{2} \le \hat{\gamma } \le UCL_{1} |\gamma = \gamma_{0} } \right) \\ & = G_{t} \left[ {{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {LCL_{1} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right. \kern-0pt} {LCL_{1} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right] - G_{t} \left[ {{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {LCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right. \kern-0pt} {LCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right] \\ & \quad + G_{t} \left[ {{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {UCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right. \kern-0pt} {UCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right] - G_{t} \left[ {{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {UCL_{1} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right. \kern-0pt} {UCL_{1} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {\gamma_{0} }}} \right. \kern-0pt} {\gamma_{0} }}}}} \right]. \\ \end{aligned} $$
(8)

Note that Eq. (6) aligns with the GMDS process, where, in the event of indecision, consideration is given to the previous k out of m subgroups in the in-control area. Consequently, the in-control decision relies on subgroups in both areas (indecision and in-control). As a result, Eq. (6) is formulated based on the binomial distribution.

Therefore, the average run length (ARL) when the manufactured output is under control is yielded below:

$$ ARL_{0} = \frac{1}{{1 - P_{in.0} }}. $$
(9)

Assume now that the relative variance has changed from \(\gamma = \gamma_{0}\) to \(\gamma = \gamma_{1} = c\gamma_{0}\), where c is a shift value when variance becomes the same. Thus, the statistic \(\frac{\sqrt n }{{\hat{\gamma }_{1} }}\) is follows to \(t_{n - 1,\delta }\) with \(t_{n - 1,\delta }\) is a non-central \(t\) distribution with the same d.f. whereas and non-centrality parameter constraint, \(\delta = \frac{\sqrt n }{{c\gamma_{0} }}\).

The probability of manufactured the output is in-control while the relative variance has changed can be obtained as follows.

$$ P_{in.1} = P_{a.1} + P_{s.1} \left[ {\sum\limits_{j = k}^{m} {\left( \begin{gathered} m \hfill \\ j \hfill \\ \end{gathered} \right)P_{a.1}^{j} \left( {1 - P_{a.1} } \right)^{m - j} } } \right], $$
(10)

where

$$ \begin{aligned} P_{a.1} & = p\left( {LCL_{2} \le \hat{\gamma } \le UCL_{2} |\gamma = \gamma_{1} } \right) \\ & = G_{t} \left[ {{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {LCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {c\gamma_{0} }}} \right. \kern-0pt} {c\gamma_{0} }}}}} \right. \kern-0pt} {LCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {c\gamma_{0} }}} \right. \kern-0pt} {c\gamma_{0} }}}}} \right] - G_{t} \left[ {{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {UCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {c\gamma_{0} }}} \right. \kern-0pt} {c\gamma_{0} }}}}} \right. \kern-0pt} {UCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {c\gamma_{0} }}} \right. \kern-0pt} {c\gamma_{0} }}}}} \right]. \\ \end{aligned} $$
(11)

and

$$ \begin{aligned} P_{s.1} & = p\left( {LCL_{1} \le \hat{\gamma } \le LCL_{2} |\gamma = \gamma_{1} } \right) + p\left( {UCL_{2} \le \hat{\gamma } \le UCL_{1} |\gamma = \gamma_{1} } \right) \\ & = G_{t} \left[ {{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {LCL_{1} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {c\gamma_{0} }}} \right. \kern-0pt} {c\gamma_{0} }}}}} \right. \kern-0pt} {LCL_{1} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {c\gamma_{0} }}} \right. \kern-0pt} {c\gamma_{0} }}}}} \right] - G_{t} \left[ {{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {LCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {c\gamma_{0} }}} \right. \kern-0pt} {c\gamma_{0} }}}}} \right. \kern-0pt} {LCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {c\gamma_{0} }}} \right. \kern-0pt} {c\gamma_{0} }}}}} \right] \\ & \quad + G_{t} \left[ {{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {UCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {c\gamma_{0} }}} \right. \kern-0pt} {c\gamma_{0} }}}}} \right. \kern-0pt} {UCL_{2} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {c\gamma_{0} }}} \right. \kern-0pt} {c\gamma_{0} }}}}} \right] - G_{t} \left[ {{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {UCL_{1} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {c\gamma_{0} }}} \right. \kern-0pt} {c\gamma_{0} }}}}} \right. \kern-0pt} {UCL_{1} |n - 1,{{\sqrt n } \mathord{\left/ {\vphantom {{\sqrt n } {c\gamma_{0} }}} \right. \kern-0pt} {c\gamma_{0} }}}}} \right] \\ \end{aligned} $$
(12)

The average run length (ARL) when the manufactured output is out-of-control is given as

$$ ARL_{1} = \frac{1}{{1 - P_{in.1} }}. $$
(13)

The chart constants \(k_{1}\) and \(k_{2}\) for the designed chart as well as ARL1 can be computed with the following step by step procedure:

  1. 1.

    Choose the preferred in-control ARL to say r0.

  2. 2.

    Select the specified values of n, m and k.

  3. 3.

    Determine the value of \(P_{in.0}\) and hence obtain ARL0 for different possible values of \(k_{1}\) and \(k_{2}\).

  4. 4.

    Obtain the estimates of chart constants \(k_{1}\) and \(k_{2}\) in such a way that \(ARL_{0} \ge r_{0}\) based on 100,000 simulations.

  5. 5.

    In Step 4 will give more values of \(k_{1}\) and \(k_{2}\), select the specified estimate of \(k_{1}\) and \(k_{2}\) such that to minimum value of \(ARL_{0}\).

  6. 6.

    By means of the determines of \(k_{1}\) and \(k_{2}\) obtained in Step 5, compute \(P_{in.1}\) and hence acquire the \(ARL_{1}\) and SD of run-length (SDRL) for distinct changed values.

Results and discussion

The achievement of designed \(\gamma\)-control chart is studied based on ARL, both under control ARL (ARL0) and beyond control ARL (ARL1). To study the achievement of the control chart, we use to compare the ARL values. A control chart is considered a good control chart if the lower value of ARL1 and the larger value of ARL0. The designed chart based on two control chart constants namely \(k_{1}\) and \(k_{2}\) along with sample size n, m, k. In this paper, the Monte Carlo simulation is carried out to obtain the chart constants based on the algorithm given in "Design of γ-control chart based on GMDS sampling" section. An algorithm is developed in R language, 100,000 replications used to obtain chart constants and hence beyond control ARL and SDRL values for various changed values, c from 1.0 to 2.0 with an interval of 0.1 and 2.0 to 4.0 with an interval of 0.5. The results are computed for the sample size, n = 5 and 7; the values of m considered as 4 and 5; \(\gamma_{0}\) = 0.05 and 0.20. Tables 1 and 2 are for \(r_{0}\) = 370 and \(\gamma_{0}\) = 0.05; Tables 3 and 4 are for \(r_{0}\) = 370 and \(\gamma_{0}\) = 0.20; and Tables 5 and 6 are for \(r_{0}\) = 500 and \(\gamma_{0}\) = 0.20.

Table 1 ARLs and SDRLs of \(\gamma\)-control chart for GMDSS when n = 5, \(\gamma_{0}\) = 0.05, ARL0 = 370.
Table 2 ARLs and SDRLs of \(\gamma\)-control chart for GMDSS when n = 7, \(\gamma_{0}\) = 0.05, ARL0 = 370.
Table 3 ARLs and SDRLs of \(\gamma\)-control chart for GMDSS when n = 5, \(\gamma_{0}\) = 0.20, ARL0 = 370.
Table 4 ARLs and SDRLs of \(\gamma\)-control chart for GMDSS when n = 7, \(\gamma_{0}\) = 0.20, ARL0 = 370.
Table 5 ARLs and SDRLs of \(\gamma\)-control chart for GMDSS when n = 5 \(\gamma_{0}\) = 0.20, ARL0 = 500.
Table 6 ARLs and SDRLs of \(\gamma\)-control chart for GMDSS when n = 7 \(\gamma_{0}\) = 0.20, ARL0 = 500.

We noticed the following few significant remarks from Tables 1, 2, 3, 4, 5 and 6 for the planned control charts:

  1. 1.

    The beyond control ARL and SDRL values decrements rapidly while the process is a shift (\({\text{c}}\)) increments from 1.0 to 4.0.

  2. 2.

    It is observed from the output that lower trend in ARL1 and SDRL values when \({\text{n}}\) increments from 5 to 7 under the condition that the remaining parametric combinations are fixed.

  3. 3.

    Results discovered that ARL1 and SDRL quantities lower as m values increases. Further, identified as k increments the quantities of ARL1 and SDRL also increases. A similar tendency noticed for several sample sizes and various \({{\text{ARL}}}_{0}\) quantities.

  4. 4.

    Results show that, an increasing tendency for chart coefficient \(k_{2}\) with an increasing value of k when m value is fixed.

  5. 5.

    The significance noticed from tables is that ARL1 and SDRL figures are diminutive for k = m − 2 as considered among quantities of k for the determined quantity of m. Moreover, observed that while k = m the quantity of ARL1 and SDRL is superior to at k = m − 1 and k = m 2 (since when k = m, the designed plan becomes MDS scheme). Therefore, the results indicate as the GMDS sampling control chart is great extent accurate than the MDS sampling control chart to differentiating the process shift.

Comparative studies

In this division, relative learning is prepared among the existing Shewhart type \(\gamma\)-control chart, MDS \(\gamma\)-control chart, SH-\(\gamma\) chart developed by6, in the 2-out-of-3 Run Rules (denoted as \(RR_{2,3} - \gamma \,{\text{chart}}\)) suggested by5 and designed \(\gamma\)-control chart. Even our proposed control chart outperform the 3-out-of-4 and the 4-out-of-5 Run Rules (denoted as the RR3,4-\(\gamma\) chart and RR4,5-\(\gamma\) chart). In addition, the industrial application of planned control chart and its supremacy over available control chart schemes studied using real data set. Furthermore, the achievement of the planned control chart with respect to available control charts also evaluate with a simulation study. We know that a control chart is considered to a greater extent competent than other control charts when that chart gives lesser ARL estimates. Therefore, the sensitivity of the proposed control chart over available charts can be studied based on ARL estimates. Here we consider ARL0 = 370, n = 5, \(\gamma_{0}\) = 0.10 and 0.20 to study the sensitivity available schemes alongside the designed \(\gamma\)-control chart based on MDS and GMDS in favor of different mean changes, which are given in Table 7.

Table 7 ARLs comparison of different \(\gamma\)-control chart when \({{\text{ARL}}}_{0}=370\), n = 5 and m = 5.

The results on the basis of Tables 7 revealed that planned control charts have fewer ARL1 values when compared with the MDS and Shewhart type control charts for different shifts (c) and various parametric combinations considered in this study. For example, if ARL0 = 370, n = 5, \(\gamma_{0}\) = 0.10 and c = 1.5 on the basis of Tables 7, clear that the proposed control chart ARL1 = 4.49 on the other hand, ARL1 = 5.98 for MDS control chart, ARL1 = 8.20 for the Shewhart type control chart, ARL1 = 10.8 for SH-\(\gamma\) chart and ARL1 = 8.4 for \(RR_{2,3} - \gamma \,{\text{chart}}\). Similarly, for ARL0 = 370, n = 5, \(\gamma_{0}\) = 0.20 and c = 1.2 from Tables 7, we pragmatic that the designed control chart as ARL1 = 33.56 although ARL1 = 38.38 for MDS control chart, ARL1 = 44.72 from the Shewhart type control chart, ARL1 = 68.1 for SH-\(\gamma\) chart and ARL1 = 40.0 for \(RR_{2,3} - \gamma \,{\text{chart}}\). Thus, the proposed control chart performed well as compared with the existing SH-\(\gamma\) chart developed by6, the 2-out-of-3 Run Rules (denoted as \(RR_{2,3} - \gamma \,{\text{chart}}\)) suggested by5 control charts. Figures 1 and 2 depicted the ARL curves for designed \(\gamma\)-control chart for GMDS, MDS, and Shewhart type control charts for different shifts. Figures 1 and 2 show that it is clear that the proposed \(\gamma\)-control chart with reference to GMDS evidences a more sensitive than the MDS and the Shewhart type control charts. To accentuate these outcomes an actual data exemplar and a simulation study also conducted in the subsequent sub-sections.

Figure 1
figure 1

ARL curves of \(\gamma\)-control chart for three charts for n = 5, m = 5, \(\gamma_{0}\) = 0.10, ARL0 = 370.

Figure 2
figure 2

ARL curves of \(\gamma\)-control chart for three charts at n = 5, m = 5, \(\gamma_{0}\) = 0.20, ARL0 = 370.

Industrial application-1

We display the planned \(\gamma\)-control chart attitude by an actual data set calmed as of a sintering process manufacturing mechanical parts. The detailed description of the data set can be found in supervising the CV using EWMA Charts studied by9. They have collected the under Phase-I dataset for 20 subgroups of each size 5 (i.e. n = 5). The analysis of the in-control data gives an estimate \(\gamma_{0}\) = 0.417. The chart constants for proposed \(\gamma\)-control chart for GMDS, MDS, and Shewhart type at n = 5, \(\gamma_{0}\) = 0.417 along with out-of-control ARL (ARL1) are presented in Table 8. Furthermore, the accomplishment of the planned \(\gamma\)-control chart is portrayed in Fig. 3. From Eqs. (4) and (5), we get \(\mu_{0} \left( {\hat{\gamma }} \right)\) = 0.4013 and \(\sigma_{0} \left( {\hat{\gamma }} \right)\) = 0.1733. Using the chart constant in Table 8 at n = 5, m = 5 planned \(\gamma\)-control chart limits of GMDS are UCL1 = 1.1383, UCL2 = 0.6804, LCL2 = 0.1222 and LCL1 = 0; for MDS are UCL1 = 1.1320, UCL2 = 0.9349, LCL2 = 0 and LCL1 = 0; for Shewhart type are UCL = 1.1116 and LCL = 0. The Phase-II dataset also borrowed from9. These data consists of 20 new subgroups of each size 5 taken from the process when it is shifted to 1.25, which give as \(\gamma_{1} = c\gamma_{0} = 1.25 \times 0.417 = 0.521\). The chart statistics \(\hat{\gamma }_{i}\) and control limits for three \(\gamma\)-control charts are plotted in Figs. 4, 5 and 6 for comparison of the charts. The designed control chart for this example it is possible to illustrate as: the process can be declared as in-control if 5 previous values of \(\hat{\gamma }_{i}\) lie within the interior control limits of the planned \(\gamma\)-control chart with reference to MDS plan. Whereas, in the case of planned \(\gamma\)-control chart under GMDS plan, the process is believed as under control if at least 4 out of 5 previous values of \(\hat{\gamma }_{i}\) lie within the interior control limits.

Table 8 ARLs of real data for \(\gamma\)-control chart for GMDSS when n = 5, \(\gamma_{0}\) = 0.417, ARL0 = 370.
Figure 3
figure 3

ARL curves of \(\gamma\)-control chart for three charts at n = 5, m = 5, \(\gamma_{0}\) = 0.417, ARL0 = 370 for real data.

Figure 4
figure 4

Shewhart type \(\gamma\)-control chart for sintering process data.

Figure 5
figure 5

\(\gamma\)-control chart using MDS sampling for sintering process data.

Figure 6
figure 6

\(\gamma\)-control chart using GMDS sampling for sintering process data.

From Fig. 4, it is noticed that all sample points within control limits, which suggests as Shewhart type \(\gamma\)-control chart unable to identify change. Whereas, the proposed \(\gamma\)-control chart with reference to the MDS plan not able to identify shift since 5 previous values of \(\hat{\gamma }_{i}\) recline in the inner control limits. On the other hand, the \(\gamma\)-control chart with reference to the GMDS plan trips the out-of-control signs at subgroups sizes 32 and 33, respectively (see Fig. 6). Hence, from discussion obviously demonstrates that the planned \(\gamma\)-control chart with reference to GMDS plan is more perceptive in discovering process change as examined to the \(\gamma\)-control chart with reference to the MDS and Shewhart type plans. Therefore, from this industrial application the \(\gamma\)-control chart using GMDS endures better quality amongst considered control charts for the rapid revealing of the process change.

Industrial application-2

We display the planned \(\gamma\)-control chart attitude by an illustrated with real industrial data of a die casting hot chamber process. These data are provided by a zinc-alloy (ZAMAK) manufacturing company in Tunisia and introduced in monitoring the coefficient of variation using control charts with run rules studied by52. They have collected the under Phase-I dataset of 30 samples, each having 5 observations are accumulated. By adopting this method, the estimated \(\gamma_{0}\) is computed from the Phase-I dataset as \(\gamma_{0}\) = 0.01. The chart constants for proposed \(\gamma\)-control chart for GMDS, MDS, and Shewhart type at n = 5, \(\gamma_{0}\) = 0.01 along with out-of-control ARL (ARL1) are presented in Table 9. Furthermore, the accomplishment of the planned \(\gamma\)-control chart is portrayed in Fig. 7. From Eqs. (4) and (5), we get \(\mu_{0} \left( {\hat{\gamma }} \right)\) = 0.009255 and \(\sigma_{0} \left( {\hat{\gamma }} \right)\) = 0.00341. Using the chart constant in Table 9 at n = 5, m = 5 planned \(\gamma\)-control chart limits of GMDS are UCL1 = 0.0203, UCL2 = 0.0148, LCL2 = 0.0038 and LCL1 = 0; for MDS are UCL1 = 0.02501, UCL2 = 0.0173, LCL2 = 0.0013 and LCL1 = 0; for Shewhart type are UCL = 0.01921 and LCL = 0. The Phase-II dataset also borrowed from52. These data consists of 30 new subgroups of each size 5 taken from the process when it is shifted to 1.20, which give as \(\gamma_{1} = c\gamma_{0} = 1.20 \times 0.01 = 0.012\). The chart statistics \(\hat{\gamma }_{i}\) and control limits for three \(\gamma\)-control charts are plotted in Figs. 7, 8 and 9 for comparison of the charts. The designed control chart for this example it is possible to illustrate as: the process can be declared as in-control if 5 previous values of \(\hat{\gamma }_{i}\) lie within the interior control limits of the planned \(\gamma\)-control chart with reference to MDS plan. Whereas, in the case of planned \(\gamma\)-control chart under GMDS plan, the process is believed as under control if at least 3 out of 5 previous values of \(\hat{\gamma }_{i}\) lie within the interior control limits. From Fig. 7, it is noticed that process is out-of-control for the Shewhart type \(\gamma\)-control chart. Whereas, the developed \(\gamma\)-control chart based on the MDS plan fail to identify shift since 5 previous values of \(\hat{\gamma }_{i}\) lie in the inner control limits (see Fig. 8). On the other hand, the \(\gamma\)-control chart with reference to the GMDS plan trips the out-of-control signs at subgroups sizes 19 (see Fig. 9). Hence, from discussion obviously demonstrates that the planned \(\gamma\)-control chart with reference to GMDS plan is more perceptive in discovering process change as examined to the \(\gamma\)-control chart with reference to the MDS and Shewhart type plans. Therefore, from this industrial application the \(\gamma\)-control chart using GMDS endures better quality amongst considered control charts for the rapid revealing of the process change.

Table 9 ARLs of real data for \(\gamma\)-control chart for GMDSS when n = 5, \(\gamma_{0}\) = 0.01, ARL0 = 370.
Figure 7
figure 7

Shewhart type \(\gamma\)-chart for die casting hot chamber process data.

Figure 8
figure 8

\(\gamma\)-chart using MDS sampling for die casting hot chamber process data.

Figure 9
figure 9

\(\gamma\)-chart using GMDS sampling for die casting hot chamber process data.

Simulation investigation

In order to investigate the implementation of the planned control chart over the available control charts, a simulation study is conducted. In this investigation, generated 40 samples of each size 5 from normal distribution. The first 20 subgroups of each size 5 are creating from normal population by mean 10 and in-control SD,\(\sigma = \gamma_{0} \mu = 0.2 \times 10 = 2.0\) = 2.0 and last 20 subgroups of each size 5 are creating from normal population with mean 10 and out-of-control SD \(\sigma_{1} = \gamma_{1} \mu = c\gamma_{0} \mu = 1.3 \times 0.20 \times 10 = 2.6\). That is, the process CV is shifted after 20 subgroups with a CV shift of c = 1.3. The data is reported in Table 10 along with computed sample CV, \(\hat{\gamma }_{i} = \frac{{S_{i} }}{{\overline{X}_{i} }}\) for each subgroup. To judge the speedy revealing talent of the designed \(\gamma\)-control charts using GMDS as against the MDS and Shewhart type control charts at n = 5, m = 5, \(\gamma_{0}\) = 0.20 and ARL0 = 370.

Table 10 The simulated data when n = 5, \(\gamma_{0}\) = 0.2, ARL0 = 370.

The control chart constants for n = 5, m = 5, \(\gamma_{0}\) = 0.20 and ARL0 = 370 are available in Table 10. The Shewhart type \(\gamma\)-control charts are given in Fig. 10 and \(\gamma\)-control charts using MDS sampling with m = 5, k = 5 is depicted in Fig. 11. The \(\gamma\)-control charts under GMDS sampling at values m = 5, k = 3 is displayed in Fig. 12. In MDS scheme using \(\gamma\)-control charts, the process is supposed to be under control provided that the previous 5 (since m = 5) \(\hat{\gamma }_{i}\) values within the inner control limits whereas in case of GMDS under \(\gamma\)-control charts, the process is affirmed as in-control if no less than 3 out of 5 previous \(\hat{\gamma }_{i}\) values between the interior control limits.

Figure 10
figure 10

\(\gamma\)-control chart for Shewhart type sampling simulated data when n = 5, \(\gamma_{0}\) = 0.20, ARL0 = 370.

Figure 11
figure 11

\(\gamma\)-control chart using MDS sampling simulated data when n = 5, \(\gamma_{0}\) = 0.20, ARL0 = 370.

Figure 12
figure 12

\(\gamma\)-control chart using GMDS sampling simulated data when n = 5, \(\gamma_{0}\) = 0.20, ARL0 = 370.

It is clear that from Figs. 10 and 11, the \(\gamma\)-control charts under Shewhart type and MDS designs are failed to detect the shift. Whereas, when we observe Fig. 12 it can be detected that using \(\gamma\)-control charts under GMDS scheme signals out at subgroup numbers 34 ( since in the preceding 5 statistics 2 only within the inner control limits). This simulation investigates that the planned \(\gamma\)-control chart under GMDS sampling is to a greater extent perceptive to detect the change of manufactured output over the accessible \(\gamma\)-control charts with reference to MDS and under Shewhart type scheme.

Conclusions

This paper aimed to develop a coefficient of variation (CV) control chart based on the generalized multiple dependent state (GMDS) sampling method for CV detection. We conducted a thorough examination of this designed control chart in comparison to control charts based on multiple dependent state sampling (MDS) and the Shewhart-type CV control chart, with a focus on average run lengths. The results were then compared to two control charts available in the existing literature. We further illustrated the implementation of the proposed control chart through concrete examples and a simulation study. The findings clearly indicated that the GMDS sampling control chart outperforms the MDS sampling control chart significantly in detecting process shifts. Consequently, the control chart approach introduced in this paper holds great promise for applications in textile and medical industries, especially when researchers seek to identify small to moderate shifts in the CV. This research has provided valuable insights into process control and quality monitoring, offering a robust tool for improving product quality and operational efficiency in these sectors. This paper also studied the planned \(\gamma\)-control chart using GMDS sampling over the MDS, Shewhart type \(\gamma\)-control charts, SH-\(\gamma\) chart and \(RR_{2,3} - \gamma \,{\text{chart}}\) with respect to the ARLs. The planned chart is moreover imposed for real example and also using a simulation study and it shows that design \(\gamma\)-control chart using GMDS sampling detected out-of-control samples over the MDS and Shewhart type \(\gamma\)-control charts. The proposed control chart performed well as compared with the existing SH-\(\gamma\) chart developed by6, the 2-out-of-3 Run Rules (denoted as \(RR_{2,3} - \gamma \,{\text{chart}}\)) suggested by5 control charts. The results indicate that the GMDS sampling control chart is a great extent accurate than the MDS sampling control chart to differentiating the process shift. The designed control chart approach in this paper can be employed in textile industrial and medical environments specifically when the experimenter would like to discover a small and moderate shift in the CV. The proposed control charts by means of a cost form is an area for future research. This research can be studied for sampling plans for both normal and skewed distribution as future research. The potential for future research lies in considering the application of the proposed chart incorporating EWMA and CUSUM statistics.