Abstract
The mechanism of risk allocation is designed to protect all stakeholders, and it is vital to project success. Qualitative and quantitative ways of optimizing risk allocation have been well documented in extant literature (e.g., allocation principles, models, and solutions), and the foci of existing research are usually the maximization of rational utility. Few research has focused on partners’ social preferences affecting the output of risk allocation. This study presents a quantitative approach based on modeling alliance member (AM)’s inequity aversion (IA) to analyze risk-sharing arrangements in an alliance project. Fehr and Schmidt’s inequity-aversion model is integrated into modeling partner’s utility. This paper derives results for an alliance leader (AL)’s optimal risk-sharing ratio and AM’s optimal risk-management effort simultaneously. The derivation is based on solving a restrained optimization problem using the conception and methods from Stackelberg game theory. Results show that an AM’s IA significantly affects risk allocation between AL and AM. Specifically, envious preference is positively related to AL’s optimal risk-sharing ratio, whereas guilty preference negatively affects AL’s optimal risk-sharing ratio. These findings will be of interest to academics and practitioners involved in designing alliance negotiations.
Similar content being viewed by others
References
Abednego M P, Ogunlana S O (2006). Good project governance for proper risk allocation in public-private partnerships in Indonesia. International Journal of Project Management, 24(7): 622–634
Alderman N, Ivory C (2007). Partnering in major contracts: Paradox and metaphor. International Journal of Project Management, 25(4): 386–393
Alireza V, Mohammadreza Y, Zin R M, Yahaya N, Noor N M (2014). An enhanced multi-objective optimization approach for risk allocation in public-private partnership projects: A case study of Malaysia. Canadian Journal of Civil Engineering, 41(2): 164–177
Ameyaw E E, Chan A P C (2016). A fuzzy approach for the allocation of risks in public-private partnership water-infrastructure projects in developing countries. Journal of Infrastructure Systems, 22(3): 04016016
Ballesteros-Pérez P (2017). Modelling the boundaries of project fast-tracking. Automation in Construction, 84: 231–241
Bamberg G, Spremann K (1987). Agency Theory, Information, and Incentives. New York: Springer
Bolton G E, Ockenfels A (2000). ERC: A theory of equity, reciprocity, and competition. American Economic Review, 90(1): 166–193
Carvalho M M, Rabechini Junior R (2015). Impact of risk management on project performance: The importance of soft skills. International Journal of Production Research, 53(2): 321–340
Casey E, Bamford P (2014). Building and Construction Procurement Guide: Principles and Options. Sydney: Australian Procurement and Construction Council, Austroads Ltd.
Chan A P C, Osei-Kyei R, Hu Y, Le Y (2018). A fuzzy model for assessing the risk exposure ofprocuring infrastructure mega-projects through public-private partnership: The case of Hong Kong-Zhuhai-Macao bridge. Frontiers of Engineering Management, 5(1): 64–77
Chang C Y (2014). Principal-agent model of risk allocation in construction contracts and its critique. Journal of Construction Engineering and Management, 140(1): 04013032
Chapman C B, Ward S C (1994). The efficient allocation of risk in contracts. Omega, 22(6): 537–552
Chen C, Hubbard M (2012). Power relations and risk allocation in the governance of public-private partnerships: A case study from China. Policy and Society, 31(1): 39–49
Chiles T H, McMackin J F (1996). Integrating variable risk preferences, trust, and transaction cost economics. Academy of Management Review, 21(1): 73–99
Chou J S, Pramudawardhani D (2015). Cross-country comparisons of key drivers, critical success factors and risk allocation for public-private partnership projects. International Journal of Project Management, 33(5): 1136–1150
Chu Y F, You F Q (2014). Integrated scheduling and dynamic optimization by Stackelberg game: Bilevel model formulation and efficient solution algorithm. Industrial & Engineering Chemistry Research, 53(13): 5564–5581
Clark A E, Masclet D, Villeval M C (2010). Effort and comparison income: Experimental and survey evidence. Industrial & Labor Relations Review, 63(3): 407–426
Clark Brown P (1986). Competitive procurement contracting when risk-preferences are uncertain. Mathematical Modelling, 7(2–3): 285–299
Clark Brown P (1987). Optimal risk-sharing when risk preferences are uncertain. Journal of the Operational Research Society, 38(1): 17–29
Croson R, Konow J (2009). Social preferences and moral biases. Journal of Economic Behavior & Organization, 69(3): 201–212
Das T K, Kumar R (2011). Interpartner negotiations in alliances: A strategic framework. Management Decision, 49(8): 1235–1256
Du G, Jiao R J, Chen M (2014). Joint optimization of product family configuration and scaling design by Stackelberg game. European Journal of Operational Research, 232(2): 330–341
Fehr E, Schmidt K M (1999). A theory of fairness, competition and cooperation. Quarterly Journal of Economics, 114(3): 817–868
Forsythe R, Horowitz J L, Savin N E, Sefton M (1994). Fairness in simple bargaining experiments. Games and Economic Behavior, 6(3): 347–369
Frank R H, Jennings S, Bernanke B S (2006). Principles of Microeconomics. North Ryde, NSW: McGraw-Hill Education
Hartman F, Snelgrove P, Ashrafi R (1997). Effective wording to improve risk allocation in lump sum contracts. Journal of Construction Engineering and Management, 123(4): 379–387
Hauck A J, Walker D H T, Hampson K D, Peters R J (2004). Project alliancing at National Museum of Australia-Collaborative process. Journal of Construction Engineering and Management, 130(1): 143–152
Ho T H, Zhang J (2008). Designing pricing contracts for boundedly rational customers: Does the framing of the fixed fee matter? Management Science, 54(4): 686–700
Hosseinian S M, Carmichael D G (2013a). Optimal gainshare/painshare in alliance projects. Journal of the Operational Research Society, 64(8): 1269–1278
Hosseinian S M, Carmichael D G (2013b). Optimal incentive contract with risk-neutral contractor. Journal of Construction Engineering and Management, 139(8): 899–909
Jin H Y, Liu S J, Liu C L, Udawatta N (2019). Optimizing the concession period of PPP projects for fair allocation of financial risk. Engineering, Construction, and Architectural Management, 26(10): 2347–2363
Jin X H, Zhang G M (2011). Modelling optimal risk allocation in PPP projects using artificial neural networks. International Journal of Project Management, 29(5): 591–603
Kahneman D, Knetsch J, Thaler R H (1986). Fairness as a constraint on profit seeking: Entitlements in the market. American Economic Review, 76(4): 728–741
Kakati M, Baruah P (2016). Optimal risk allocation in Public-Private Partnership (PPP) projects in India. In: The 2016 WEI International Academic Conference Proceedings. Boston, 144–166
Karim N A A (2011). Risk allocation in Public-Private Partnership (PPP) project: A review on risk factors. International Journal of Sustainable Construction Engineering & Technology, 2(2): 8–16
Kate G S, Patil P S (2020). Risk analysis and allocation in public-private partnership power transmission line projects. International Journal of Critical Infrastructures, 16(1): 23–37
Katok E, Pavlov V (2013). Fairness in supply chain contracts: A laboratory study. Journal of Operations Management, 31(3): 129–137
Khazaeni G, Khanzadi M, Afshar A (2012). Optimum risk allocation model for construction contracts: Fuzzy TOPSIS approach. Canadian Journal of Civil Engineering, 39(7): 789–800
Konow J (2001). Fair and square the four sides of distributive justice. Journal of Economic Behavior & Organization, 46(2): 137–164
Kumaraswamy M, Ling F Y, Rahman M M, Phng S T (2005). Constructing relationally integrated teams. Journal of Construction Engineering and Management, 131(10): 1076–1086
Laffont J J, Marimort D (2001). The Theory of Incentives: The Principal-Agent Model. Princeton, NJ: Princeton University Press
Lam K C, Wang D, Lee P T K, Tsang Y T (2007). Modelling risk allocation decision in construction contracts. International Journal of Project Management, 25(5): 485–493
Laux C (2001). Limited-liability and incentive contracting with multiple projects. RAND Journal of Economics, 32(3): 514–526
Ling F Y Y, Ning Y, Ke Y, Kumaraswamy M M (2013). Modeling relational transaction and relationship quality among team members in public projects in Hong Kong. Automation in Construction, 36: 16–24
Lomoro A, Mossa G, Pellegrino R, Ranieri L (2020). Optimizing risk allocation in public-private partnership projects by project finance contracts—The case of put-or-pay contract for stranded Posidonia disposal in the municipality of Bari. Sustainability, 12(3): 806
Love P E D, Mistry D, Davis P R (2010). Price competitive alliance projects: Identification of success factors forpublic clients. Journal of Construction Engineering and Management, 136(9): 947–956
Love P E D, Sing C P, Wang X, Irani Z, Thwala D W (2014). Overruns in transportation infrastructure projects. Structure and Infrastructure Engineering, 10(2): 141–159
Luttmer E F P (2005). Neighbors as negatives: Relative earnings and well-being. The Quarterly Journal of Economics, 120(3): 963–1002
McAfee R P, McMillan J (1986). Bidding for contracts: A principal-agent analysis. RAND Journal of Economics, 17(3): 326–338
Meng Q, Li Z, Du J, Liu H, Ding X (2019). Negotiation for time optimization in construction projects with competitive and social welfare preferences. Complexity, 3269025
Nasirzadeh F, Khanzadi M, Rezaie M (2014). Dynamic modeling of the quantitative risk allocation in construction projects. International Journal of Project Management, 32(3): 442–451
Ng S T, Rose T M, Mak M, Chen S E (2002). Problematic issues associated with project partnering—The contractor perspective. International Journal of Project Management, 20(6): 437–449
Nicholas A (2012). Fairness as a constraint on reciprocity: Playing simultaneously as dictator and trustee. Journal of Socio-Economics, 41(2): 211–221
Osei-Kyei R, Chan A P C (2015). Review of studies on the critical success factors for Public-Private Partnership (PPP) projects from 1990 to 2013. International Journal of Project Management, 33(6): 1335–1346
Owen S, Yawson A (2013). Information asymmetry and international strategic alliances. Journal of Banking & Finance, 37(10): 3890–3903
Pishdad-Bozorgi P, de la Garza J M, Austin R B (2016). Readiness assessment for flash tracking. Journal of Construction Engineering and Management, 142(12): 06016005
Rasul N, Malik M S A, Bakhtawar B, Thaheem M J (2019). Risk assessment of fast-track projects: A systems-based approach. International Journal of Construction Management, in press, doi: https://doi.org/10.1080/15623599.2019.1602587
Rey-Biel P (2008). Inequity aversion and team incentives. Scandinavian Journal of Economics, 110(2): 297–320
Rohde KIM (2010). A preference foundation for Fehr and Schmidt’s model of inequity aversion. Social Choice and Welfare, 34(4): 537–547
Scherer F M (1964). The theory of contractual incentives for cost reduction. The Quarterly Journal of Economics, 78(2): 257–280
Shan M, Le Y, Yiu K T W, Chan A P C, Hu Y, Zhou Y (2018). Assessing collusion risks in managing construction projects using artificial neural network. Technological and Economic Development of Economy, 24(5): 2003–2025
Tang Y, Chen Y, Hua Y, Fu Y (2020). Impacts of risk allocation on conflict negotiation costs in construction projects: Does managerial control matter? International Journal of Project Management, 38(3): 188–199
Tseng F S, Yeh Y (2014). Maintenance outsourcing coordination with risk-averse contractors. Journal of the Operational Research Society, 65(11): 1760–1769
Winch G M (2010). Managing Construction Projects. Chichester: Wiley-Blackwell
Xu H L, Wang X Y (2014). Optimization and Control Methods in Industrial Engineering and Construction. Dordrecht: Springer
Xue W L, Caliskan Demirag O, Niu B Z (2014). Supply chain performance and consumer surplus under alternative structures of channel dominance. European Journal of Operational Research, 239(1): 130–145
Yescombe E R (2002). Principles of Project Finance. San Diego, CA: Academic Press
Author information
Authors and Affiliations
Corresponding author
Additional information
This work was supported by the National Natural Science Foundation of China (Grant Nos. 71921003, 71701090, 71571098, and 72071105), the Social Science Foundation of Jiangsu Province (Grant No. 16JD009), and the Fundamental Research Funds for the Central Universities (Grant No. 14370120).
Rights and permissions
About this article
Cite this article
Ding, X., Li, Q. Optimal risk allocation in alliance infrastructure projects: A social preference perspective. Front. Eng. Manag. 9, 326–336 (2022). https://doi.org/10.1007/s42524-020-0145-x
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s42524-020-0145-x