Diagnose the Causes of Cost Deviation in Highway Construction Projects by Using Root Cause Analysis Techniques

  • Research Article - Civil Engineering
  • Published:
Arabian Journal for Science and Engineering Aims and scope Submit manuscript

Abstract

The root cause analysis techniques are a good choice to be adopted to diagnose the root causes of cost deviation in highway projects. Many root cause analysis tools have emerged from the literature as generic standards for identifying root causes such as Fishbone diagram, Pareto diagram, and the 5-Why analysis. This study diagnosed twenty causes of cost deviation in highway projects in Republic of Iraq which they divided into three main groups (planning causes, designing causes, and execution causes). Pareto analysis showed that eleven causes out of twenty causes represent the most important causes of cost deviation, these eleven causes had been filtered by 5-Why analysis, this analysis concluded that the unavailability of enough information about the project is a root cause for planning causes group, while the clarity lack of the owner requirements is a root cause for designing causes group and finally, the poor efficiency of the administrative staff is a root cause for execution causes group.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Abbreviations

RCA:

Root causes analysis

ARCTM:

Accident root causes tracing model

RAF:

Rank agreement factor

PA:

Percentage agreement

PD:

Percentage disagreement

References

  1. AL-Zwainy, F.M.S.; Aidan, I.A.-A.: Forecasting the cost of structure of infrastructure projects utilizing artificial neural network model (highway projects as case study). Indian J. Sci. Technol. 10(20), 1–12 (2017). doi:10.17485/ijst/2017/v10i20/108567

    Article  Google Scholar 

  2. Al-Zwainy, F.M.; Reem, A.: Investigation cost deviation of highway project. Res. J. Appl. Sci. Eng. Technol. 13(11), 843–855 (2016)

    Google Scholar 

  3. Al-Zwainy, F.; Neran, T.: Investigation and evaluation of the cost estimation methods of Iraqi communication projects. Int. J. Eng. Manag. Res. 05(05), 362–369 (2015)

    Google Scholar 

  4. Al-Zwainy, F.; Abdulmajeed, M.; Aljumaily, H.: Using multivariable linear regression technique for modeling productivity construction in Iraq. Open J. Civ. Eng. 03(03), 127–135 (2013). doi:10.4236/ojce.2013.33015

    Article  Google Scholar 

  5. Al-Zwainy, F.; Ibrahim, A.; Saja, H.: Investigation and assessment of the project management methodology in construction sector in Iraq. Int. J. Appl. Eng. Res. 11(04), 2494–2507 (2016)

    Google Scholar 

  6. Jimmie, H.: Identifying root causes of construction injuries. J. Constr. Eng. Manag. 1(124), 67–71 (1998)

    Google Scholar 

  7. Tariq, S.A.: Identifying root causes of construction accidents. J. Constr. Eng. Manag. 1(126), 52–60 (2000)

    Google Scholar 

  8. Tommy, Y.; Ivan, W.; Karen, C.: Construction delays in Hong Kong civil engineering projects. J. Const. Eng. Manag. 6(136), 636–649 (2006)

    Google Scholar 

  9. Yehiel, R.: Root-cause analysis of construction-cost overruns. J. Constr. Eng. Manag. 1(140), 04013039 (2014)

    Google Scholar 

  10. Patricia, M.W.: Techniques for root cause analysis. BUMC Conf. Proc. 14, 154–157 (2001)

    Google Scholar 

  11. Geoff, V.: Mini Guide to Root Cause Analysis, 1st edn. Quality Management & Training, United Kingdom (2008)

    Google Scholar 

  12. Mahto, D.; Kumar, A.: Application of root cause analysis in improvement of product quality and productivity. J. Ind. Eng. Manag. 2(1), 16–53 (2008)

    Google Scholar 

  13. Nyren, G.: Product development according to six sigma and the DAMIC improvement cycle. M.Sc. thesis, submitted to the Department of Business Administration and Social Sciences, Industrial Business Administration, Lulea University of Technology (2007)

  14. Stevenson, W.J.: Operation Management, 8th edn. McGraw-Hill/Irwin, Boston (2005)

    Google Scholar 

  15. Oberlender, G.D.: Project Management for Engineers and Construction, 2nd edn. McGraw-Hill Science/Engineering/Math, United States of America (2000)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Faiq M. S. Al-Zwainy.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Al-Zwainy, F.M.S., Mezher, R.A. Diagnose the Causes of Cost Deviation in Highway Construction Projects by Using Root Cause Analysis Techniques. Arab J Sci Eng 43, 2001–2012 (2018). https://doi.org/10.1007/s13369-017-2850-2

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s13369-017-2850-2

Keywords

Navigation