PPP Renegotiation Framework based on Equivalent NPV Constraint in the Case of BOT Project: Incheon Airport Highway, South Korea

  • Construction Management
  • Published:
KSCE Journal of Civil Engineering Aims and scope

Abstract

The contractual type of Build-Operate-Transfer (BOT) is becoming a more common delivery method of Public-Private Partnerships (PPP) for infrastructure projects. However, their implementation is not seamless due to a number of factors including uncertainty in future demand, which discourages participation of private investors. In response, governments often provide Minimum Revenue Guarantee (MRG) which is a contractual clause that can be invoked if project revenue falls below the guarantee threshold. While MRG does not provide an upfront subsidy such as a grant, it exposes the governments to significant financial liability. In 2001, the South Korean government partnered with a consortium of private investors to deliver the Incheon Airport Highway using the BOT framework. The MRG clause was also an integral part of the BOT contract with the total net additional liability to the government exceeding $1.5 billion. This case study paper presents a renegotiation framework that is based on the equivalent NPV constraint condition. The implementation results show that the partners can find a set of alternative solutions that reduce government financial exposure while maintaining the private sector’s NPV.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Deog Sang Bae.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Bae, D.S., Damnjanoic, I. & Kang, D.H. PPP Renegotiation Framework based on Equivalent NPV Constraint in the Case of BOT Project: Incheon Airport Highway, South Korea. KSCE J Civ Eng 23, 1473–1483 (2019). https://doi.org/10.1007/s12205-019-1444-9

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s12205-019-1444-9

Keywords

Navigation