Abstract
The contractual type of Build-Operate-Transfer (BOT) is becoming a more common delivery method of Public-Private Partnerships (PPP) for infrastructure projects. However, their implementation is not seamless due to a number of factors including uncertainty in future demand, which discourages participation of private investors. In response, governments often provide Minimum Revenue Guarantee (MRG) which is a contractual clause that can be invoked if project revenue falls below the guarantee threshold. While MRG does not provide an upfront subsidy such as a grant, it exposes the governments to significant financial liability. In 2001, the South Korean government partnered with a consortium of private investors to deliver the Incheon Airport Highway using the BOT framework. The MRG clause was also an integral part of the BOT contract with the total net additional liability to the government exceeding $1.5 billion. This case study paper presents a renegotiation framework that is based on the equivalent NPV constraint condition. The implementation results show that the partners can find a set of alternative solutions that reduce government financial exposure while maintaining the private sector’s NPV.
Similar content being viewed by others
References
APMG International (2017). Equity participation by the government, APMG International, https://doi.org/ppp-certification.com/ppp-certificationguide/45-equity-participation-government [Accessed on March 19, 2017].
Ashuri, B., Kashani, H., Molenaar, K. R., and Lee, S. (2010). “A valuation model for choosing the optimal Minimum Revenue Guarantee (MRG) in a Highway Project: A real-option approach.” Construction Research Congress 2010: Innovation for Reshaping Construction Practice, pp. 1244–1253, DOI: https://doi.org/10.1061/41109(373)125.
Ashuri, B., Kashani, H., Molenaar, K. R., Lee, S., and Lu, J. (2012). “Risk-neutral pricing approach for evaluating BOT highway projects with government minimum revenue guarantee options.” Journal of Construction Engineering and Management, Vol. 138, No. 4, pp. 545–557, DOI: https://doi.org/10.1061/(asce)co.1943-7862.0000447.
Aziz, A. and Ahmed, M. (2007). “Successful delivery of public-private partnerships for infrastructure development.” Journal of Construction Engineering and Management, Vol. 133, No. 12, pp. 918–931, DOI: https://doi.org/10.1061/(ASCE)0733-9364(2007)133:12(918).
Bain, R. (2009). “Error and optimism bias in toll road traffic forecasts.” Transportation, Sep, Vol. 36, No. 5, pp. 469–482, DOI: https://doi.org/10.1007/s11116-009-9199-7.
Brandao, L. and Saraiva, E. (2008). “The option value of government guarantees in infrastructure projects.” Construction Management and Economics, Vol. 26, No. 11, pp. 1171–1180, DOI: https://doi.org/10.1080/01446190802428051.
Carbonara, N., Costantino, N., and Pellegrino, R. (2014). “Revenue guarantee in public-private partnerships: a fair risk allocation model.” Construction Management and Economics, Vol. 32, No. 4, pp. 403–415, DOI: https://doi.org/10.1080/01446193.2014.906638.
Chiara, N., Garvin, M. J., and Vecer, J. (2007). “Valuing simple multiple exercise real options in infrastructure projects.” Journal of Infrastructure System, Vol. 13, No. 2, pp. 97–104, DOI: https://doi.org/10.1061/(asce)1076-0342(2007)13:2(97).
Choi, M. (2015). “200 million USD profit from the toll on the Incheon Airport highway.” Newstown, Inc., https://doi.org/www.newstown.co.kr/news/articleView.html?idxno=195969, [Accessed on March 19, 2017].
Cui, Q., Johnson, P., Quick, A., and Hastak, M. (2008). “Valuing the warranty ceiling clause on New Mexico Highway 44 using a binomial lattice model.” Journal of Construction Engineering Management, Vol. 134, No. 1, pp. 10–17, DOI: https://doi.org/10.1061/(asce)0733-9364(2008)134:1(10).
Davis Langdon, Management Consulting (2007). Life Cycle Costing (LCC) as a contribution to sustainable construction: A common methodology, Pinal Report, Davis Langdon Manguement Consulting, ec.europa.eu/DocsRoom/documents/5054/attachments/1/translations/en/renditions/native+&cd=1&hl=en&ct=clnk&gl=us, [Accessed on July 23, 2016].
Domingues, S. and Zlatkovic, D. (2015). “Renegotiating PPP contracts: reinforcing the ‘P’ in partnership.” Transport Reviews, Mar, Vol. 35, No. 2, pp. 204–225, DOI: https://doi.org/10.1080/01441647.2014.992495.
EY (2015). “Public-private partnerships and the global infrastructure challenge.” Ernst & Young Global Limited, https://doi.org/www.ey.com/Publication/vwLUAssets/Health/%24FILE/EY_PPP_Thought_Leadership.pdf [Accessed on March 19, 2017].
Galera, A. L. L. and Solino, A. S. (2010). “A real options approach for the valuation of highway concessions.” Transportation Science, Vol. 44, No. 3, pp. 416–427, DOI: https://doi.org/10.1287/trsc.1090.0299.
Garvin, M. J. and Bosso, D. (2008). “Assessing the effectiveness of infrastructure public-private partnership programs and projects.” Public Works Management & Policy, Vol. 13, No. 2, pp. 162–178, DOI: https://doi.org/10.1177/1087724x08323845.
Gümüs, Z. H. and Floudas, C. A. (2001). “Global optimization of nonlinear bilevel programming problems.” Journal of Global Optimization, Vol. 20, No. 1, pp. 1–31, DOI: https://doi.org/10.1023/A:1011268113791.
HM Treasury (2014). “Private finance initiative projects: 2014 summary data.” HM Treasury, https://doi.org/www.gov.uk/government/uploads/system/uploads/attachment_data/file/387228/pfi_projects_2014_summary_data_final_15122014.pdf [Accessed on July 23, 2016].
Huang, Y. L. and Chou, S. P. (2006). “Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects.” Construction Management and Economics, 1 Apr, Vol. 24, No. 4, pp. 379–389, DOI: https://doi.org/10.1080/01446190500434997.
Incheon Airport (2017). “Business plan.” Incheon Airport, https://doi.org/www.airport.kr/co_cnt/en/intro/mileston/fooair/fooair.do [Accessed on March 21, 2017].
Kim, D. (2015). “The secret to the investment return of 9.36% of the incheon airport highway.” Yonhap Infomax, https://doi.org/news.einfomax.co.kr/news/articleView.html?idxno=181546 [Accessed on March 19, 2017].
KIS Pricing (2017). “YTM matrix.” KIS Pricing, https://doi.org/www.bond.co.kr/beyond/beyond03 [Accessed on March 31, 2017].
Kokkaew, N. and Chiara, N. (2013). “A modeling government revenue guarantees in privately built transportation projects: a risk-adjusted approach.” Transport, Vol. 28, No. 2, pp. 186–192, DOI: https://doi.org/10.3846/16484142.2013.803262.
Liu, G. (2012). “Municipal bond insurance premium, credit rating, and underlying credit risk.” Public Budgeting & Finance, Vol. 32, No. 1, pp. 128–156, DOI: https://doi.org/10.1111/j.1540-5850.2011.01005.x.
Miranda Sarmento, J. J. and Renneboog, L. (2017). “Renegotiating public-private partnerships.” Tilburg: CentER, Center for Economic Research, Volume 14, DOI: https://doi.org/10.2139/ssrn.2932101.
Ng, S. T., Xie, J., Cheung, Y. K., and Jefferies, M. (2007). “A simulation model for optimizing the concession period of public–private partnerships schemes.” International Journal of Project Management, Vol. 25, No. 8, pp. 791–798, DOI: https://doi.org/10.1016/j.ijproman.2007.05.004.
Park, J. (2012a). “Incheon airport highway MRG problems.” The Kyunghyang Shinmun, https://doi.org/biz.khan.co.kr/khan_art_view.html?artid=201210050925431&code=920100 [Accessed on July 23, 2016].
Park, H. (2012b). “Government support for PPP projects in korea.” United Nations ESCAP, https://doi.org/www.unescap.org/sites/default/files/4b-Govt-support-PPPs-in-ROK.pdf [Accessed on July 17, 2017].
Remer, D. S., Stokdyk, S. B., and Driel, M. V. (1993). “Survey of project evaluation techniques currently used in industry.” International Journal of Production Economics, Vol. 32, No. 1, pp. 103–115, DOI: https://doi.org/10.1016/0925-5273(93)90013-b.
Shen, L. Y., Bao, J. J., Wu, Y. Z., and Lu, W. S. (2007). “Using bargaininggame theory for negotiating concession period for BOT-Type Contract.” Journal of Construction Engineering Management, Vol. 133, Issue 5, pp. 385–392, DOI: https://doi.org/10.1061/(asce)0733-9364(2007)133:5(385).
Thobani, M. (1999). “Private infrastructure, public risk.” Finance and Development, Vol. 36, No. 1, p. 50.
UNESCAP (2008). “A primer to public-private partnerships in infrastructure development-3.5.1. Types of government support and incentives.” United Nations Economic and Social Commissions for Asia and the Pacific, https://www.unescap.org/ttdw/ppp/ppp_primer/351_types_of_government_support_and_ incentives.html [Accessed on Oct. 6, 2018].A primer to public-private partne
US Department of Transportation (2015). “State P3 legislation.” US Department of Transportion, https://doi.org/www.fhwa.dot.gov/ipd/p3/state_legislation/ [Accessed on July 23, 2016].
Vassallo, J. and Soliño, A. (2006). “Minimum income guarantee in transportation infrastructure concessions in chile.” Transportation Research Record: Journal of the Transportation Research Board, Jan, Vol. 1960, pp. 15–22, DOI: https://doi.org/10.1177/0361198106196000103.
Wang, S. (2005). Infrastructure private investment impact to public economy, Construction & Economy Research Institute of Korea.
Wibowo, A., Permana, A., Kochendörfer, B., Kiong, R., Jacob, D., and Neunzehn, D. (2012). “Modeling contingent liabilities arising from government guarantees in indonesian BOT/PPP toll roads.” Journal of Construction Engineering and Management, Vol. 138, No. 12, pp. 1403–1410, DOI: https://doi.org/10.1061/(asce)co.1943-7862.0000555.
World Bank (2016). “PPI visualization dashboard.” World Bank, https://doi.org/ppi.worldbank.org/visualization/ppi.html#sector=&status=&ppi=&investment=®ion=&ida=&income=&ppp=&mdb=&year=&excel=false&map=&header=true [Accessed on March 19, 2017].
Xiong, W. and Zhang, X. (2014). “Concession renegotiation models for projects developed through public-private partnerships.” Journal of Construction Engineering and Management, Vol. 140, No. 5, pp. 1–9, DOI: https://doi.org/10.1061/(asce)co.1943-7862.0000843.
Xiong, W. and Zhang, X. (2016). “The real option value of renegotiation in public-private partnerships.” Journal of Construction Engineering and Management, Vol. 142, No. 8, 04016021, DOI: https://doi.org/10.1061/(asce)co.1943-7862.0001130.
Yusuf, J.-E. W., Wallace, C. Y., and Hackbart, M. (2006). “Privatizing transportation through public-private partnerships: Definitions, models, and issues.” Kentucky Transportation Center.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Bae, D.S., Damnjanoic, I. & Kang, D.H. PPP Renegotiation Framework based on Equivalent NPV Constraint in the Case of BOT Project: Incheon Airport Highway, South Korea. KSCE J Civ Eng 23, 1473–1483 (2019). https://doi.org/10.1007/s12205-019-1444-9
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-019-1444-9