Abstract
Hongmian Road goes under Jihe highway by the way of tunnel in Shenzhen City, Guangdong Province, China. The tunnel has some special characteristics such as shallow depth, large span, soft soil, busy traffic, and long distance under-crossing the operating highway, thus there is great difficulty and risk during its construction. A series of in-situ tests were conducted to reveal deformation characteristics during tunneling beneath the existing highway by the double-side-drift method (DSDM). The results show that initial construction method and measures can’t meet the safety requirement of tunnel construction, and the level of risk is extremely high, so the construction method need to be timely adjusted. By comprehensive analysis, the double-side-drift optimum method (DSDOM) is put forward, on the basis of which a series of optimum measures also have been put forward, such as reasonable construction methods, the suitable length of bench and excavation, soil reinforcement measures on tunnel face, optimizing construction process, closing primary support in time and speeding up the construction of secondary lining. Then the feasibility of this optimized construction method and measures are verified by the numerical simulations. Finally, from feedbacks of monitoring results, the optimum method and measures have been proved to be reasonable and feasible, and they can guarantee a successful pass beneath the operating highway.
Similar content being viewed by others
References
U.S. Department of Transportation Federal Highway Administration (FHWA). (2009). Technical manual for design and construction of road tunnels civil elements.
Sharifzadeha, M., Kolivand, F., Ghorbani, M., and Yasrobi, S. (2013). “Design of sequential excavation method for large span urban tunnels in soft ground-Niayesh tunnel.” Tunnelling and Underground Space Technology, Vol. 35, No. 4, pp. 178–188, DOI: 10.1016/j.tust.2013.01.002.
Li, J., Tan, Z. S., Yu, Y., and Ni, L. S. (2011). “Research on construction procedure for shallow large-span tunnel undercrossing highway.” Rock & Soil Mechanics, Vol. 32, No. 9, pp. 531–2809. (in Chinese)
Pinto, F. and Whittle, A. J. (2014). “Ground movements due to shallow tunnels in soft ground: I. Analytical solutions.” Journal of Geotechnical and Geoenvironmental Engineering, Vol. 140, No. 4, DOI: 10.1061/(ASCE)GT.1943-5606.0000948.
Shi, C. H., Cao, C. Y., and Lei, M. F. (2017). “An analysis of the ground deformation caused by shield tunnel construction combining an elastic half-space model and stochastic medium theory.” KSCE Journal of Civil Engineering, Vol. 21, No. 5, pp. 1933–1944, DOI: 10.1007/s12205-016-0804-y.
Yang, J. S., Liu, B. C., and Wang, M. C. (2004). “Modeling of tunneling induced ground surface movements using stochastic medium theory,” Tunnelling and Underground Space Technology, Vol. 19, No. 2, pp. 113–123, DOI: 10.1016/j.tust.2003.07.002.
Talebinejad, A., Chakeri, H., Moosavi, M., Özçelik, Y., Ünver, B., and Hindistan, M. (2014). “Investigation of surface and subsurface displacements due to multiple tunnels excavation in urban area.” Arabian Journal of Geosciences, Vol. 7, No. 9, pp. 3913–3923, DOI: 10.1007/s12517-013-1056-5.
Ng, C. W., Lee, K. M., and Tang, D. K. (2004). “Three-dimensional numerical investigations of New Austrian Tunneling Method (NATM) twin tunnel interactions.” Canadian Geotechnical Journal, Vol. 41, No. 3, pp. 523–539, DOI: 10.1139/t04-008.
Chakeri, H., Hasanpour, R., Hindistan, M. A., and Ünver, B. (2011). “Analysis of interaction between tunnels in soft ground by 3D numerical modeling.” Bulletin of Engineering Geology and the Environment, Vol. 70, No. 3, pp. 439–448, DOI: 10.1007/s10064-010-0333-8.
Zhang, Z. G. and Huang, M. S. (2014). “Geotechnical influence on existing subway tunnels induced by multiline tunneling in Shanghai soft soil”. Computers and Geotechnics, Vol. 56, pp. 121–132, DOI: 10.1016/j.compgeo.2013.11.008.
Wang, Z., Du, S. J., Zhang, W. B., Li, Y. J., and Wu, X. P. (2009). “Analysis of construction settlement of shallow railway tunnel under crossing the highway.” Chinese Journal of underground Space and Engineering, Vol. 5, No. 3, pp. 531–535. (in Chinese)
Zheng, J. J., Bao, D. Y, Gong, Y. F., and Zi, Y. (2006). “Research on construction control technology for railway tunnel underneath passing existing expressway tunnel.” Journal of Railway Engineering Society, Vol. 23, No. 8, pp. 80–84. (in Chinese)
Jiang, A. N., Li, P., and Shi, H. T. (2011). “Shallow depth of the tunnel excavation response research based on CRD method.” Procedia Engineering, Vol. 15, pp. 4852–4856. DOI: 10.1016/j.proeng.2011.08.905.
Li, P. F., Zhao, Y., and Zhou, X. J. (2016). “Displacement characteristics of high-speed railway tunnel construction in loess ground by using multi-step excavation method.” Tunnelling and Underground Space Technology, Vol. 51, No. 1, pp. 41–55, DOI: 10.1016/j.tust.2015. 10.009.
Hoek, E. (2001) “Big tunnel in bad rock.” Journal of Geotechnical and Geoenvironmental Engineering, Vol. 127, No. 9, pp. 726–740, DOI: 10.1061/(ASCE)1090-0241(2001)127:9(726).
Lu, S. W., Zhou, C. B., Jiang, N., and Xu, X. (2015). “Effect of excavation blasting in an under-cross tunnel on airport runway.” Geotechnical and Geological Engineering, Vol. 33, No. 4, pp. 973–981, DOI: 10.1007/s10706-015-9879-3.
Zhu, Z. Q., Huang, S., and Zhu, Y. Q. (2012). “Study of road surface settlement rule and controlled criterion for railway tunnel undercrossing highway.” Rock & Soil Mechanics, Vol. 33, No. 2, pp. 558–563, 576. (in Chinese)
Sugiyama, T., Hagiwara, T., Nomoto, T., Nomoto, M., Ano, Y., Mair, R. J., Bolton, M. D., and Soga, K. (1999). “Observations of ground movements during tunnel construction by slurry shield method at the Docklands Light Railway Lewisham Extension-East London.” Soils & Foundations, Vol. 39, No. 3, pp. 99–112, DOI: 10.3208/sandf.39.3_99.
Wang, H., Qin, W. M., and Jiao, Y. Y. (2013). “Stability assessment for highway with large-span box culvert jacking underneath: A case study.” Canadian Geotechnical Journal, Vol. 50, No. 6, pp. 585–594, DOI: 10.1139/cgj-2012-0334.
Jia, P., Zhao, W., Zhou, J. J, Li, H. W., and Song, J. (2014). “Optimal analysis of excavation method of a shallow tunnel beneath expressway.” Journal of Beijing University of Technology, Vol. 40, No. 8, pp. 1256–1262. (in Chinese)
China Urban Construction Design & Research Institute Co. Ltd. (1998). “The Standard of Loadings for the Municipal Bridge Design (CJJ77–98).” China Architecture & Building Press, Beijing.
Steindorfer, A. (1998). Short term prediction of rock mass behaviour in tunneling by advanced analysis of displacement monitoring data, PhD thesi. Technische Universitat Graz, Graz.
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Cao, C., Shi, C., Lei, M. et al. Deformation Characteristics and Countermeasures of shallow and Large-span Tunnel Under-crossing the Existing Highway in Soft Soil: a Case Study. KSCE J Civ Eng 22, 3170–3181 (2018). https://doi.org/10.1007/s12205-017-1586-6
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-017-1586-6