Skip to main content
Log in

An Innovative Framework of 5D BIM Solutions for Construction Cost Management: A Systematic Review

  • Original Paper
  • Published:
Archives of Computational Methods in Engineering Aims and scope Submit manuscript

Abstract

Cost management represents an important part of management in construction projects. Developments in the fifth dimension (5D) of building information modelling (BIM) has fostered new and potential improvements in terms of efficiency, quality and precision during cost management processes. The research aims to develop an innovative framework of 5D BIM solutions for construction cost management. A systematic review approach was adopted for the evaluation of the 5D BIM solutions. Interviews were conducted with three industry experts to validate and comment on the research findings. Eighteen software or web solutions were found and analysed against five main areas of the cost management practices. The research contributes to creating new awareness and knowledge from the available 5D BIM solutions towards the current cost management requirements as well as the future need in the digitalised working environment.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9

Similar content being viewed by others

References

  1. Abdul Rahman I, Hameed Memon A, Tarmizi Abd Karim A (2013) Significant factors causing cost overruns in large construction projects in Malaysia. J Appl Sci 13(2):286–293

    Google Scholar 

  2. Adafin J, Wilkinson S, Rotimi JOB, Odeyinka H (2014) An exploration of theoretical concepts and methods for assessing risk impacts on the variability between design stage elemental cost plan and tender sum. Constr Dev Ctries Contrib Sustain Dev 20:308–316

    Google Scholar 

  3. Ahuja H (1980) Successful construction cost control. Wiley, New York

    Google Scholar 

  4. Aibinu A, Venkatesh S (2014) Status of BIM adoption and the BIM experience of cost consultants in Australia. J Prof Issues Eng Educ Pract 140(3):04013021

    Google Scholar 

  5. Akmal N, Ismail A, Drogemuller R, Beazley S, Owen R (2016) A review of BIM capabilities for quantity surveying practice. In: MATEC web of conferences

  6. Alhasan S, Kumar B, Thanikal JV (2017) Effectiveness of implementing 5D functions of building information modeling on professions of quantity surveying: a review. Int J Civil Eng Technol 8(5):783–800

    Google Scholar 

  7. Antwi-Afari MF, Li H, Pärn EA, Edwards DJ (2018) Critical success factors for implementing building information modelling (BIM): a longitudinal review. Autom Constr 91(March):100–110

    Google Scholar 

  8. Ashworth A, Hogg K (2002) Willis’s practice and procedure for the quantity surveyor. Blackwell, Hoboken

    Google Scholar 

  9. Australian Institute of Quantity Surveyors (2000) Australian cost management manual, vol 1. Australian Institute of Quantity Surveyors, Deakin West

    Google Scholar 

  10. Azhar S (2011) Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry. Leadersh Manag Eng 11(3):241–252

    Google Scholar 

  11. Boon J, Prigg C (2012) Evolution of quantity surveying practice in the use of BIM: the New Zealand experience. In: Joint CIB international symposium, pp 84–98

  12. Boton C (2013) Conception de vues métiers dans les collecticiels orientés service: Vers des multi-vues adaptées pour la simulation collaborative 4D/nD de la construction. Université de Lorraine, Nancy

    Google Scholar 

  13. Boton C, Forgues D, Halin G (2018) A framework for building information modeling implementation in engineering education. Can J Civil Eng 45(10):866

    Google Scholar 

  14. Boton C, Kubicki S, Halin G (2013) Designing adapted visualization for collaborative 4D applications. Autom Constr 36:152–167

    Google Scholar 

  15. Brodie M (2010) Building information modelling: the UK legal context. Int J Law Built Environ 2(3):246–259

    Google Scholar 

  16. Bryde D, Broquetas M, Volm JM (2013) The project benefits of building information modelling (BIM). Int J Proj Manage 31(7):971–980

    Google Scholar 

  17. Bueno C, Fabricio MM (2018) Comparative analysis between a complete LCA study and results from a BIM-LCA plug-in. Autom Constr 90:188–200

    Google Scholar 

  18. Chan IYS, Liu AMM, Chen B (2018) Management strategies for 5D-BIM adoption in Hong Kong. In: Proceedings of the 21st international symposium on advancement of construction management and real estate (209889), pp 1023–1039

  19. Chang SE, Shinozuka M (1996) Life-cycle cost analysis with natural hazard risk. J Infrastruct Syst 2(3):118–126

    Google Scholar 

  20. Charef R, Alaka H, Emmitt S (2018) Beyond the third dimension of BIM: a systematic review of literature and assessment of professional views. J Build Eng 19(May):242–257

    Google Scholar 

  21. Cheng JCP, Tan Y, Song Y, Liu X, Wang X (2017) A semi-automated approach to generate 4D/5D BIM models for evaluating different offshore oil and gas platform decommissioning options. Vis Eng Vis Eng 5(1):12

    Google Scholar 

  22. Cheng YM (2014) An exploration into cost-influencing factors on construction projects. Int J Proj Manage 32(5):850–860

    Google Scholar 

  23. Chong H-Y, Lee C-Y, Wang X (2017) A mixed review of the adoption of building information modelling (BIM) for sustainability. J Clean Prod 142:4114–4126

    Google Scholar 

  24. Chong H-Y, Wong JS, Wang X (2014) An explanatory case study on cloud computing applications in the built environment. Autom Constr 44:152–162

    Google Scholar 

  25. COBIM (2012) CoBIM 2012-common BIM requirements. Series 7: quantity take-off

  26. Doloi H (2012) Cost overruns and failure in project management: understanding the roles of key stakeholders in construction projects. J Constr Eng Manag 139(3):267–279

    Google Scholar 

  27. Eastman C, Teicholz P, Sacks R, Liston K (2011) BIM handbook: a guide to building information modeling for owners, managers, designers, engineers and contractors. Wiley, New York

    Google Scholar 

  28. Forgues D, Iordanova I, Valdiveso F, Staub-French S (2012) Rethinking the cost estimating process through 5D BIM: a case study. In: Construction research congress, pp 778–786

  29. Fuchs S, Scherer RJ (2017) Multimodels: instant nD-modeling using original data. Autom Constr 75:22–32

    Google Scholar 

  30. Fuller S (2006) Life-cycle cost analysis LCCA. National Institute of Standards and Technology, Gaithersburg

    Google Scholar 

  31. Ganbat T, Chong HY, Liao PC, Lee CY (2018) A cross-systematic review of addressing risks in building information modelling-enabled international construction projects. Arch Comput Methods Eng. https://doi.org/10.1007/s11831-018-9265-4

    Article  Google Scholar 

  32. Gibbs D-J, Emmitt S, Ruikar K, Lord W (2013) An Investigation into whether building information modelling (BIM) can assist with construction delay claims. Int J3D Inf Model 2(1):45–52

    Google Scholar 

  33. Harrison C, Thurnell D (2014) 5D BIM in a consulting quantity surveying environment. In: Building A Better New Zealand Conference. MoBIE, Auckland, pp 43–53

    Google Scholar 

  34. Hartmann T, Gao J, Fischer M (2008) Areas of application for 3D and 4D models on construction projects. J Constr Eng 134(10):776–785

    Google Scholar 

  35. Hartmann T, van Meerveld H, Vossebeld N, Adriaanse A (2012) Aligning building information model tools and construction management methods. Autom Constr 22:605–613

    Google Scholar 

  36. Herszon L (2017) The complexity of projects: an adaptive model to incorporate complexity dimensions into the cost estimation process. University of Huddersfield, Huddersfield

    Google Scholar 

  37. Kehily D, Underwood J (2017) Embedding life cycle costing in 5D BIM. J Inf Technol Constr 22(22):145–167

    Google Scholar 

  38. Khanzadi M, Sheikhkhoshkar M, Banihashemi S (2018) BIM applications toward key performance indicators of construction projects in Iran. Int J Constr Manag 2018:1–16

    Google Scholar 

  39. Kim H, Grobler F (2013) Preparing a construction cash flow analysis using building information modeling (BIM) technology. KICEM J Constr Eng Proj Manag 704:1–9

    Google Scholar 

  40. Lee CY, Chong HY, Wang X (2018) Streamlining digital modeling and building information modelling (BIM) uses for the oil and gas projects. Arch Comput Methods Eng 25(2):349–396

    Google Scholar 

  41. Lee XS, Tsong W, Khamidi MF (2016) “5D building information modelling: a practicability review. In: The 4th international building control conference 2016 (IBCC 2016), pp 2–7

  42. Levin P (1998) Construction contract claims, changes and dispute resolution. ASCE Press, New York

    Google Scholar 

  43. Lopez R, Chong H-Y, Wang X, Graham J (2016) Technical review: analysis and appraisal of four-dimensional building information modeling usability in construction and engineering projects. J Constr Eng Manag 142(5):06015005

    Google Scholar 

  44. Lu Q, Won J, Cheng JCP (2016) A financial decision making framework for construction projects based on 5D building information modeling (BIM). Int J Proj Manage 34(1):3–21

    Google Scholar 

  45. Marzouk M, Azab S, Metawie M (2018) BIM-based approach for optimizing life cycle costs of sustainable buildings. J Clean Prod 188:217–226

    Google Scholar 

  46. McGraw Hill Construction (2012) The business value of BIM for owners. McGraw Hill Construction, New York

    Google Scholar 

  47. Memon AH, Rahman IA, Memon I, Azman NIA (2014) BIM in Malaysian construction industry: Status, advantages, barriers and strategies to enhance the implementation level. Res J Appl Sci Eng Technol 8(5):606–614

    Google Scholar 

  48. Mitchell D (2012) 5D BIM: creating cost certainty and better buildings. In: RICS cobra conference, pp 1–10

  49. Monteiro A, Poças Martins J (2013) A survey on modeling guidelines for quantity takeoff-oriented BIM-based design. Autom Constr 35:238–253

    Google Scholar 

  50. Nadeem A, Wong AKD, Wong FKW (2015) Bill of quantities with 3D views using building information modeling. Arab J Sci Eng 40(9):2465–2477

    Google Scholar 

  51. Olatunji OA, Sher W (2014) Perspectives on modelling bim-enabled estimating practices. Aust J Constr Econ Build 14(4):32–53

    Google Scholar 

  52. Olatunji OA, Sher WD, Gu N (2010) Building information modelling and quantity surveying practice. Emir J Eng Res 15(1):67–70

    Google Scholar 

  53. Pezeshki Z, Ivari SAS (2018) Applications of BIM: a brief review and future outline. Arch Comput Methods Eng 25(2):273–312

    Google Scholar 

  54. Pilyay A, Shilova L (2018) The use of normative basis for the construction cost for introduction of 5D BIM in Russia. IOP Conf Ser Mater Sci Eng 365(6):062009

    Google Scholar 

  55. Popov V, Juocevicius V, Migilinskas D, Ustinovichius L, Mikalauskas S (2010) The use of a virtual building design and construction model for developing an effective project concept in 5D environment. Autom Constr 19(3):357–367

    Google Scholar 

  56. Project Management Institute (2017) A guide to the project management body of knowledge. Project Management Institute Inc., Newtown

    Google Scholar 

  57. Ramabodu MS, Verster J (2010) Factors contributing to cost overruns of construction projects. In: 5th built environment conference, Durban, South Africa, pp 131–143

  58. Sabol L (2008) Challenges in cost estimating with building information modeling. In: IFMA world workplace, pp 1–16

  59. Santos R, Costa AA, Grilo A (2017) Bibliometric analysis and review of building information modelling literature published between 2005 and 2015. Autom Constr 80:118–136

    Google Scholar 

  60. Sattineni A, MacDonald JA (2014) 5D BIM : a case study of an implementation strategy in the construction industry. In: The 31st international symposium on automation and robotics in construction and mining (ISARC 2014), pp 1–7

  61. Schaufelberger JE, Holm L (2017) Management of construction projects. A constructor’s perspective. Routledge, New York

    Google Scholar 

  62. Seeley IH (1997) Quantity surveying practice. Macmillan International Higher Education, London

    Google Scholar 

  63. Smith D, Lovegrove S, Muse A, Pan DDZ, Sawhney A, Watkins P, Whisson G, Seah Kwee Yong T (2015) BIM for cost managers: requirements from the BIM model. RICS guidance note

  64. Smith P (2014) BIM and the 5D project cost manager. Proc Soc Behav Sci 119:475–484

    Google Scholar 

  65. Smith P (2016) Project cost management with 5D BIM. Proc Soc Behav Sci 226(226):193–200

    Google Scholar 

  66. Stanley R, Thurnell D (2013) Current and anticipated future impacts of BIM on cost modelling in Auckland. In: Proceedings of the 38th Australasian Universities building education association conference, 20–22 November 2013, Auckland, New Zealand

  67. Stanley R, Thurnell D (2014) The benefits of, and barriers to, implementation of 5d BIM for quantity survey in New Zealand. Austr J Constr Econ Build 14:105–117

    Google Scholar 

  68. Succar B, Kassem M (2015) Macro-BIM adoption: conceptual structures. Autom Constr 57:64–79

    Google Scholar 

  69. Turk Ž, Wu S, Wood G, Ginige K, Jong SW (2014) A technical review of bim based cost estimating in UK quantity surveying practice, standards and tools. J Inf Technol Constr 19:535–563

    Google Scholar 

  70. Verbeeten FHM (2011) Public sector cost management practices in The Netherlands. Int J Public Sector Manag 24(6):492–506

    Google Scholar 

  71. Woodward DG (1997) Life cycle costing–theory, information acquisition and application. Int J Proj Manage 15(6):335–344

    Google Scholar 

  72. Yalcinkaya M, Arditi D (2013) Building information modeling (BIM) and the construction management body of knowledge. In: 10th IFIP WG 5.1 international conference, pp 619–629

  73. Yu W-D, Lai C-C, Lee W-L (2006) A WICE approach to real-time construction cost estimation. Autom Constr 15:12–19

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Heap-Yih Chong.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Vigneault, MA., Boton, C., Chong, HY. et al. An Innovative Framework of 5D BIM Solutions for Construction Cost Management: A Systematic Review. Arch Computat Methods Eng 27, 1013–1030 (2020). https://doi.org/10.1007/s11831-019-09341-z

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11831-019-09341-z

Navigation