Skip to main content
Log in

On-Line Scheduling on Parallel Machines to Minimize the Makespan

  • Published:
Journal of Systems Science and Complexity Aims and scope Submit manuscript

Abstract

This paper considers two parallel machine scheduling problems, where the objectives of both problems are to minimize the makespan, and the jobs arrive over time, on two uniform machines with speeds 1 and s (s ≥ 1), and on m identical machines, respectively. For the first problem, the authors show that the on-line LPT algorithm has a competitive ratio of (1 + \(\sqrt 5 \))/2 ≈ 1.6180 and the bound is tight. Furthermore, the authors prove that the on-line LPT algorithm has the best possible competitive ratio if s ≥ 1.8020. For the second problem, the authors present a lower bound of (15 − \(\sqrt {17} \))/8 ≈ 1.3596 on the competitive ratio of any deterministic on-line algorithm. This improves a previous result of 1.3473.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Graham R L, Bounds for certain multiprocessing anomalies, Bell System Technical Journal, 1966, 45(9): 1563–1581.

    Article  MATH  Google Scholar 

  2. Epstein L, Noga J, Seiden S, et al., Randomized on-line scheduling on two uniform machines, Journal of Scheduling, 2001, 4(2): 71–92.

    Article  MathSciNet  MATH  Google Scholar 

  3. Li R and Huang H C, On-line scheduling for jobs with arbitrary release times, Computing, 2004, 73(1): 79–97.

    Article  MathSciNet  MATH  Google Scholar 

  4. Hall L A and Shmoys D B, Approximation schemes for constrained scheduling problems//Foundations of Computer Science, 1989, 30th Annual Symposium on IEEE, 1989, 134–139.

    Google Scholar 

  5. Shmoys D B, Wein J, and Williamson D P, Scheduling parallel machines on-line, SIAM Journal on Computing, 1995, 24(6): 1313–1331.

    Article  MathSciNet  MATH  Google Scholar 

  6. Graham R L, Bounds on multiprocessing timing anomalies, SIAM Journal on Applied Mathematics, 1969, 17(2): 416–429.

    Article  MathSciNet  MATH  Google Scholar 

  7. Chen B and Vestjens A, Scheduling on identical machines: How good is LPT in an on-line setting?, Operations Research Letters, 1997, 21(4): 165–169.

    Article  MathSciNet  MATH  Google Scholar 

  8. Noga J and Seiden S S, An optimal online algorithm for scheduling two machines with release times, Theoretical Computer Science, 2001, 268(1): 133–143.

    Article  MathSciNet  MATH  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Songsong Li.

Additional information

This work was supported by the Special Funds of the National Natural Science Foundation of China under Grant No. 61340045, the Specialized Research Fund for the Doctoral Program of Higher Education of China under Grant No. 20123705110003, and Innovation Project of Shangdong Graduate Education under Grant No. SDYC13036.

This paper was recommended for publication by Editor FANG Yong.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Li, S., Zhang, Y. On-Line Scheduling on Parallel Machines to Minimize the Makespan. J Syst Sci Complex 29, 472–477 (2016). https://doi.org/10.1007/s11424-015-3252-8

Download citation

  • Received:

  • Revised:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11424-015-3252-8

Keywords

Navigation