Abstract

Mine planners utilize production schedules to determine when activities should be executed, e.g., blocks of ore should be extracted; a medium-term schedule maximizes net present value associated with activity execution while a short-term schedule reacts to unforeseen events. Both types of schedules conform to spatial precedence and resource restrictions. As a result of executing activities, heat accumulates and activities must be curtailed. Airflow flushes heat from the mining areas, but is limited to the capacity of the ventilation system and operational setup. We propose two large-scale production scheduling models: (i) that which prescribes the start dates of activities in a medium-term schedule while considering airspeed, in conjunction with ventilation and refrigeration; and, (ii) that which minimizes deviation between both medium- and short-term schedules, and production goals. We correspondingly present novel techniques to improve model tractability, and demonstrate the efficacy of these techniques on cases that yield short-term schedules congruent with medium-term plans while ensuring the safety of the work environment. We solve otherwise-intractable medium-term instances using an enumeration technique if the gaps are greater than 10%. Our short-term instances solve in 1,800 seconds, on average, to a 0.1% optimality gap, and suggest varying optimal airspeeds based on the maximum heat load on each level.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Aminossadati SM, Mohammed NM, Shemshad J (2010) Distributed temperature measurements using optical fibre technology in an underground mine environment. Tunn Undergr Space Technol 25(3):220–229

    Article  Google Scholar 

  • Amoako R, Chowdu A, Brickey A (2023) A deviation-minimization approach to short-term underground mine schedule optimization. Min Metall Explor 40(5):1749–1765

    Google Scholar 

  • Anderson J, Longson I (1986) The optimisation of ventilation and refrigeration in British coal mines. Min Eng 146:115–120

    Google Scholar 

  • Bienstock D, Zuckerberg M (2010) Solving LP relaxations of large-scale precedence constrained problems. In: Eisenbrand F, Shepherd FB (eds) Integer programming and combinatorial optimization: 14th international conference, IPCO 2010, Lausanne, Switzerland, June 9–11, 2010, proceedings. Springer, Berlin Heidelberg, pp 1–14

  • Breeze P (2018) Chapter 5 - diesel engines. In: Breeze P (ed) Piston engine-based power plants. Academic Press, Cambridge, pp 47–57

    Google Scholar 

  • Brickey A, Chowdu A, Newman A, Goycoolea M, Godard R (2021) Barrick’s Turquoise Ridge gold mine optimizes underground production scheduling operations. INFORMS J Appl Anal 51(2):106–118

    Article  Google Scholar 

  • Brickey AJ (2015). Underground production scheduling optimization with ventilation constraints. PhD thesis, Colorado School of Mines

  • Campeau L-P, Gamache M (2020) Short-term planning optimization model for underground mines. Comput Oper Res 115:104642

    Article  MathSciNet  Google Scholar 

  • Carpentier S, Gamache M, Dimitrakopoulos R (2016) Underground long-term mine production scheduling with integrated geological risk management. Min Technol 125(2):93–102

    Article  Google Scholar 

  • Chehri A, Farjow W, Mouftah HT, Fernando X (2011). Design of wireless sensor network for mine safety monitoring. In: 2011 24th Canadian conference on electrical and computer engineering (CCECE), pp 001532–001535. Institute of Electrical and Electronics Engineers

  • Chicoisne R, Espinoza D, Goycoolea M, Moreno E, Rubio E (2012) A new algorithm for the open-pit mine production scheduling problem. Oper Res 60(3):517–528

    Article  MathSciNet  Google Scholar 

  • Chowdu A, Goycoolea M, Brickey A (2019). Mine schedule optimization and mine operational realities: Bridging the gap. In Mining goes Digital: Proceedings of the 39th International Symposium Application of Computers and Operations Research in the Mineral Industry (APCOM 2019), June 4-6, 2019, Wroclaw, Poland, page 412. CRC Press

  • Chowdu A, Nesbit P, Brickey A, Newman A (2021) Operations research in underground mine planning: a review. INFORMS J Appl Anal 52(2):109–132

    Article  Google Scholar 

  • Darling P (2011). SME mining engineering handbook, volume 1. SME

  • Gliwan SE, Crowe K (2022) A network flow model for operational planning in an underground gold mine. Mining 2(4):712–724

    Article  Google Scholar 

  • Gurobi Optimization, LLC (2022). Gurobi optimizer reference manual

  • Hartman HL, Mutmansky JM (2002) Introductory mining engineering. Wiley, New York

    Google Scholar 

  • Hartman HL, Mutmansky JM, Ramani RV, Wang Y (2012) Mine ventilation and air conditioning. Wiley, New York

    Google Scholar 

  • Hill A, Brickey AJ, Cipriano I, Goycoolea M, Newman A (2022) Optimization strategies for resource-constrained project scheduling problems in underground mining. INFORMS J Comput 34(6):3042–3058

    Article  MathSciNet  Google Scholar 

  • IBM (2019). IBM ILOG CPLEX 12.10 user manual

  • King B, Goycoolea M, Newman A (2017). New integer programming models for tactical and strategic underground production scheduling. Mining Eng, 69(3)

  • Kloppers B, Horn C, Visser J (2015) Strategic and tactical requirements of a mining long-term plan. J South Afr Inst Min Metall 115(6):515–521

    Google Scholar 

  • Lambert WB, Brickey A, Newman AM, Eurek K (2014) Open-pit block-sequencing formulations: a tutorial. Interfaces 44(2):127–142

    Article  Google Scholar 

  • Lazaro P, Momayez M (2021) Heat stress in hot underground mines: a brief literature review. Min Metall Explor 38(1):497–508

    Google Scholar 

  • L’Heureux G, Gamache M, Soumis F (2013) Mixed integer programming model for short term planning in open-pit mines. Min Technol 122(2):101–109

    Article  Google Scholar 

  • Manríquez F, Pérez J, Morales N (2020) A simulation-optimization framework for short-term underground mine production scheduling. Optim Eng 21:939–971

    Article  MathSciNet  Google Scholar 

  • Maurya T, Karena K, Vardhan H, Aruna M, Raj MG (2015) Effect of heat on underground mine workers. Procedia Earth Planet Sci 11:491–498

    Article  ADS  Google Scholar 

  • McPherson MJ, McPherson MJ (1993) Incompressible flow relationships. Subsurface Ventilation and Environmental Engineering, 134–174

  • MSHA (2023) Mine ventilation. In Code of Federal Regulations. U.S, Department of Labor, Mine Safety and Health Administration (MSHA), Washington, D.C

  • Muñoz G, Espinoza D, Goycoolea M, Moreno E, Queyranne M, Letelier OR (2018) A study of the Bienstock–Zuckerberg algorithm: applications in mining and resource constrained project scheduling. Comput Optim Appl 69(2):501–534

    Article  MathSciNet  Google Scholar 

  • Nesbitt P, Blake LR, Lamas P, Goycoolea M, Pagnoncelli BK, Newman A, Brickey A (2021) Underground mine scheduling under uncertainty. Eur J Oper Res 294(1):340–352

    Article  Google Scholar 

  • Newman AM, Kuchta M (2007) Using aggregation to optimize long-term production planning at an underground mine. Eur J Oper Res 176(2):1205–1218

    Article  Google Scholar 

  • Newman AM, Rubio E, Caro R, Weintraub A, Eurek K (2010) A review of operations research in mine planning. Interfaces 40(3):222–245

    Article  Google Scholar 

  • Ogunmodede O, Lamas P, Brickey A, Bogin G, Newman A (2022) Underground production scheduling with ventilation and refrigeration considerations. Optim Eng 23(3):1677–1705

    Article  Google Scholar 

  • Osanloo M, Gholamnejad J, Karimi B (2008) Long-term open pit mine production planning: a review of models and algorithms. Int J Min Reclam Environ 22(1):3–35

    Article  Google Scholar 

  • O’Sullivan D, Brickey A, Newman A (2015) Is openpit production scheduling“easier’’ than its underground counterpart? Min Eng 67(4):68–73

    Google Scholar 

  • Ramazan S, Dimitrakopoulos R (2004) Recent applications of operations research and efficient MIP formulations in open pit mining. SME Trans 316

  • Rivera O, Brickey AJ, Espinoza D, Goycoolea M, Moreno E (2016). The OMP user’s guide

  • Roghanchi P, Kocsis KC, Sunkpal M (2016) Sensitivity analysis of the effect of airflow velocity on the thermal comfort in underground mines. J Sustain Min 15(4):175–180

    Article  Google Scholar 

  • Roy S, Mishra DP, Bhattacharjee RM, Agrawal H (2022) Heat stress in underground mines and its control measures: a systematic literature review and retrospective analysis. Min Metall Explor 39(2):357–383

    Google Scholar 

  • Ryan A, Euler DS (2017) Heat stress management in underground mines. Int J Min Sci Technol 27(4):651–655

    Article  Google Scholar 

  • Sarin SC, West-Hansen J (2005) The long-term mine production scheduling problem. IIE Trans 37(2):109–121

    Article  Google Scholar 

  • Smith ML, Wicks SJ (2014) Medium-term production scheduling of the Lumwana mining complex. Interfaces 44(2):176–194

    Article  Google Scholar 

  • Song Z, Schunnesson H, Rinne M, Sturgul J (2015) Intelligent scheduling for underground mobile mining equipment. PLoS ONE 10(6):e0131003

    Article  PubMed  PubMed Central  Google Scholar 

  • Topal E (2008) Early start and late start algorithms to improve the solution time for long-term underground mine production scheduling. J S Afr Inst Min Metall 108(2):99–107

    Google Scholar 

  • Weintraub A, Pereira M, Schultz X (2008) A priori and a posteriori aggregation procedures to reduce model size in MIP mine planning models. Electron Notes Discret Math 30:297–302

    Article  MathSciNet  Google Scholar 

Download references

Acknowledgements

This research is funded in part by the National Institute of Occupational Safety and Health as part of the Mine Ventilation and Safety Research Capacity Building program, contract number: 0000HCCS-2019-36404. Daniel Bienstock acknowledges support from his ARPA-E “PERFORM” contract, DE-AR0001300. We would like to thank our industry sponsors for providing data and funding this project. We thank Nicholas Parham, from the Colorado School of Mines, for providing additional insights in model formulation and data processing. This work was made possible, in part, by a generous donation from Columbia University.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Alexandra Newman.

Additional information

Publisher's Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Ayaburi, J., Swift, A., Brickey, A. et al. Optimizing ventilation in medium- and short-term mine planning. Optim Eng (2024). https://doi.org/10.1007/s11081-023-09871-3

Download citation

  • Received:

  • Revised:

  • Accepted:

  • Published:

  • DOI: https://doi.org/10.1007/s11081-023-09871-3

Keywords

Navigation