Skip to main content

Advertisement

Log in

Transformation of the Kuban’ River Zelenchuk HPP into an HPP-PSPP

  • HYDROTECHNICAL CONSTRUCTION
  • Published:
Power Technology and Engineering Aims and scope

Various aspects are examined of the design to convert the Zelenchuk Hydroelectric Power Plant (HPP) into a Hydroelectric Power Plant and PSPP (HPP-PSPP). The most challenging engineering and technical issues are explored concerning the integration of new hydropower equipment in the powerhouse, and construction of a PSPP lower reservoir and tail pond conduits.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. E. L. Budnikov, V. N. Antonov, and I. I. Parinov, “The Zelenchuk HPP hydropower generation complex in the Kuban’ River basin,” Gidrotekh. Stroit., No. 8, 19 – 24 (2008).

  2. Zelenchuk HPP-PSPP Project Documentation. Infrastructure, JSC “Mosoblgidroproekt” (2007) [in Russian].

  3. Zelenchuk HPP-PSPP Revised Project Documentation. Infrastructure, JSC “Mosoblgidroproekt” (2013) [in Russian].

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to R. M. Ikhsanov.

Additional information

Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 9, September 2015, pp. 38 – 42.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Ikhsanov, R.M., Baranov, A.E., Kozlov, S.P. et al. Transformation of the Kuban’ River Zelenchuk HPP into an HPP-PSPP. Power Technol Eng 49, 397–401 (2016). https://doi.org/10.1007/s10749-016-0636-4

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10749-016-0636-4

Keywords

Navigation