1 Introduction

An earthquake with a magnitude of 7.8 (M w ) occurred at 11:56 Nepal Standard Time (NST), (local time) on 25 April 2015, in the central part of Nepal (Gorkha). The epicenter was east-southeast of Lamjung, 77 km south-west of Kathmandu, 28.15 at the north latitude and 84.71 at the east longitude, and the depth was 15 km (USGS). According to the statistics by The Nepal Police on 22 June the number of deaths 8660 and injured 21,952 for the main shock and deaths 172 and injured 3470 for the aftershock. It was also reported that >5,000,000 buildings and houses were damaged and about half those which of had collapsed. This earthquake was officially named as The 2015 Gorkha, Nepal earthquake, since the hypocenter was located in the Gorkha region.

A major aftershock with a moment magnitude of 7.3 (M w ) occurred at 12:51 NST on 12 May 2015. The epicenter was 75 km north-east of Kathmandu and near the Chinese border, 27.82 at the north latitude and 86.08 at the east longitude, and the depth was 19 km (USGS).

We surveyed to the affected area during 26 May to 3 June and 17 to 24 to investigate the damage and collect data. The findings of this investigation undertaken by this team on the various aspects of the earthquake disaster in the Kathmandu valley. Third damage survey and fourth damage were conducted for every house in Sankhu on 17–18 Aug/29 Oct 2015 and in Khokana on 19–20 Aug/30–31 Oct 2015.

We found traditional construction methods are stronger than imagined. Many traditional earthquake-resistance technologies exist in Nepal. This is an important factor in maintaining traditional construction methods to preserve such technologies.

The maintenance of traditional buildings contributes not only to the maintenance of world heritage but also improvements in the earthquake resistance of cities. The problem of the masonry structure and in maintenance is shown in this study.

Surveys of building types and damage extent were conducted, for every house in Sankhu and Khokana, Kathmandu, after a second survey term. For building types, we used building classification surveys by the Japan International Cooperation Agency, commonly called JICA (2002). Building damage magnitudes were classified using European Macroseismic Scale (EMS)-98 (Grünthal 1998). A high-resolution image from March 12 (before the disaster) was obtained from Google Earth™ prior to the survey. This image was used to identify the position of each building before the earthquake, based on which the damage to each building was estimated in accordance with EMS-98.

With the above approach, we determined damage in Sankhu and Khokana related to the 2015 Gorkha Earthquake in core areas, using the damage function indicated by JICA (2002) .

2 Earthquake Recorded in Kanti Path (Katnp), Central Kathmandu

The strong-motion data set from the USGS Center for Engineering Strong Motion Data (CESMD: http://strongmotioncenter.org/cgi-bin/CESMD/iqr1.pl). Figure 1 shows the three components of acceleration and velocity recorded by the CESMD station at the US Embassy in Kathmandu, which recorded the M w 7.8 main shock (06:11:26 UTC, 28.15°N 84.71°E, 15.0 km deep). Figure 2 shows the three components of the tripartite response spectra of the main shock and aftershocks. The dominant periods in the Fourier spectra were approximately in the range of 4–5 s for magnitude 7 class events. However, for magnitude 5 class events, the dominant periods of the Fourier spectra were about 0.5 s.

Fig. 1
figure 1

Acceleration (left) and velocity (light) record of M w 7.8 main shock

Fig. 2
figure 2

Response spectrum of main shock and aftershocks

In Fig. 1, the vertical velocity motion waveform has two pulse-like ground motions. The main parts of the velocity waveform can be seen centered at two points: 45.08 and 53.07 s. The difference between the rupture start time and arrival time for the S-wave is 8 s. The dominant period of the body wave is about 4 s.

These sizes can be estimated for each strong motion generation area (SMGA) by direct interpretation of body waves.

The methodology shows below;

$$R = T_{p} \times V_{r}$$
(1)
$$V_{r} = 0.72 \cdot V_{s}$$
(2)

where R Circular strong motion generation area, T p Pulse period, V r Rupture velocity, V s Shear-wave velocity

Thus, two SMGA might existed near the city of Kathmandu.

3 Damage in Kathmandu Valley

3.1 Kathmandu

At places along the Kathmandu Ring Road, reinforced concrete (RC) frame buildings were tilted damaged by the soft ground; however, most of the building damage in the city occurred in masonry buildings. At Gongabu, northwest of the Ring Road, many RC buildings were damaged; most of these were four to seven story structures. The damage was sometimes greater at locations with soft ground such as deltaic deposit near river branches (Fig. 3); however, some damage was also likely to have been caused by inappropriate construction methods. At Sitapaila, west of the Ring Road, some RC building collapsed at locations where the ground conditions on terraces were a bit stiff. At Balkhu, southwest of the Ring Road, RC frame buildings were tilted (Fig. 4). This is near the confluence of the Bagmati and Balkhu rivers, where collapsed buildings fell onto and destroyed a neighboring building (Fig. 5). The ground was soft in Balkhu because of the presence of riverbed sediments. Within our survey area, the liquefaction area was very limited. Building damage was caused by soft ground on the river branch (related to the 2015 Gorkha Earthquake), not by liquefaction.

Fig. 3
figure 3

At Gongabu, RC frame buildings were tilted (a, b). A shear crack in the first flower (c) (photo by T. Ohsumi)

Fig. 4
figure 4

At west side of the Ring Road in Kathmandu, RC frame buildings were tilted (photo by T. Ohsumi)

Fig. 5
figure 5

At the branch point of the Bagmati River and the Transformor River, collapsed building (a) fell onto and destroyed the next building (b) (photo by T. Ohsumi). OpenStreetMap https://www.openstreetmap.org/

3.2 Sanhkhu

Sankhu is an old town and locating on a small hill in the north east part of the Kathmandu Valley. Houses damaged by the earthquake have been demolished. In general, RC buildings were partially damaged, whereas masonry buildings were severely damaged.

The difference in damage as a result of building type was remarkable. Damage in Sankhu was extensive. Brick and cement mortar houses without RC columns experienced a lot of damage. In contrast, the damage to RC structures—particularly those erected in recent years—was generally minor. These structures were mainly five to six story buildings. In contrast, many of the non-engineered masonry structures that experienced complete collapse or partial damage were two to four story buildings in Sankhu (Fig. 6). Damage in non-engineered masonry structures was initiated by vertical cracks in the corners of the buildings, which contained no RC columns (Fig. 7a), the outer wall structures of such buildings were generally burned brick with cement mortar joints to withstand rain. In several cases, the inner walls of buildings are adobe bricks with mud mortar (Fig. 8b).

Fig. 6
figure 6

RC buildings were partially damaged, the difference appears remarkable in Sankhu (photo by T. Ohsumi)

Fig. 7
figure 7

A vertical crack in a brick masonry wall was generated from the corner (a). Structures having no RC columns on the corner (b) (photo by T. Ohsumi)

Fig. 8
figure 8

Building with a central courtyard/chowk in Lalitpur (a photo taken in 2001), b courtyard/chowk image

4 Traditional Construction Methods in Kathmandu Vally

4.1 Chowks, a Type of Courtyard

The traditional method of brick making is stronger than imagined. It is considered that buildings surrounding a courtyard have high rigidity. This is important to save the lost courtyard Fig. 8 shows typical courtyard in Lalitpur and Bhaktapur.

A chowk is a type of courtyard that is common in the community of Newar in Nepal. The chowk is characterized by a square or rectangular space surrounded by buildings on all sides. The surrounding buildings are built on a raised platform, called falcha. Opposite the main entrance on the ground floor is an area dedicated to the Guthi—Social Unify and other Gods with idols of deities. The chowk structure is excellent with respect to earthquake resistance. However, these traditional buildings are gradually becoming less common as a result of rebuilding (Fig. 9).

Fig. 9
figure 9

Traditional buildings are gradually becoming less common as a result of rebuilding (photo by T. Ohsumi, taken after earthquake in Sankhu)

4.2 Typical Masonry Building Four-Story Structures

In urban core areas, four-story buildings dominate, and more than a third of the buildings are five stories or higher. The construction of the Nepalese traditional four-story house is shown in Fig. 10. These are mainly brick masonry structures, but many of them have been extended vertically by adding additional stories to the original three- or three and a half-story buildings. In addition, many of them are divided vertically for the use of separate families because of the local custom of succession of property. This contributes to higher seismic risk, even if one does not consider the poor building technology actually adopted for the construction.

Fig. 10
figure 10

Typical cross section of a multiple-story building (after Toffin 1991)

4.3 The Timber Repair

The traditional method of construction, which does not use metal with timber (Fig. 11) has prevented degradation for a long time. This type of construction should be repaired using traditional methods without resorting to modern methods. This traditional construction method resist motion throughout the structure during earthquakes (Fig. 12). The traditional structures caused brittleness transformations and defective corners of the structures related to the 2015 Gorkha earthquake (Fig. 13). Reinforcement with such components as hold down hardware and battledore bolts is indispensable.

Fig. 11
figure 11

Timber technology (after Toffin 1991)—detail of opening canage—a exploded, perspective; b transversal section; c perspective of assemblage elements; d main frame; e secondary frame; f wedge key

Fig. 12
figure 12

Traditional construction method resist motion throughout the structure during earthquakes (photo by T. Ohsumi)

Fig. 13
figure 13

Traditional structures caused brittleness deformations and defective corners of the building related to the 2015 Gorkha Earthquake in Khokana (photo by T.Ohsumi after the 2015 Earthquake)

4.4 The Latticed Window and the Outer Frame Effect

A latticed window and an outer frame (puratva) surrounds door are reinforced the buildings (Fig. 14). The window and the door made with a tree have its own stiffness. The wooden frame is arranged with the outside wall and the inside. The wooden frame and the door fixed from both sides has reinforced stiffness in an opening (Fig. 15). Shuttering windows (Pasahdhi) consists of a lower panel or planks inserted into a joint and locked in its position by a rail and a movable shutter. The shutter is fastened at the ceiling joints before the rail and panel are removed (Fig. 16).

Fig. 14
figure 14

Building constructed over 100 years ago that was slightly damaged by the Gorkha earthquake: (photo by T. Ohsumi; photo by T. Ohsumi, taken after Gorkha earthquake in Sankhu)

Fig. 15
figure 15

Structural elements of a window: a and Section of a door: b details of sill, lintel, door leaves and bolts (after Gutschow et al. 1987)

Fig. 16
figure 16

Shuttering window: a (photo by T. Ohsumi) and section of a shuttering window: b (after Gutschow et al. 1987)

5 Manintenance Technology

5.1 Roof Repair

Roof soil, which is cured clay/silt, prevents heat conduction from sunlight and is water resistant indoors (Fig. 17). Flying weeds cause the roof for long year. For the infiltration of rainwater, the building deteriorates. The roof renovation is important periodically.

Fig. 17
figure 17

Typical roof cross section. (courtesy of Assistant Prof. Ram Prasad Suwal with Nepal Engineering College)

Renovation of the temple’s roof was carried out in 2015 (Fig. 18). Figure 19 shows a house roof renovation carried out in 2015.

Fig. 18
figure 18

Renovation of a temple’s roof was carried out in 2015 a installation of timber rafters, b hand wood planking (photo by T. Ohsumi)

Fig. 19
figure 19

Renovation of a house roof was carried out in 2015 (photo by T. Ohsumi)

5.2 Renovation of the Royal Palace

The Patan palace was renovated with assistance from the Kathmandu Valley Preservation Trust (KVPT) and the Sumitomo Foundation in 2013 (Fig. 20). Thus, in Patan, after the earthquake, this palace had only partial damage at the top of the structure (Gajur and Baymvah).

Fig. 20
figure 20

Renovation of the structure and the covering of the roof was carried out in 2011: a (top left) installation of timber rafters, b hand wood planking, c waterproof membrane, d traditional terracotta roof tiles on a mud bed (from information plate at the Patan Museum)

6 Building Types in the Kathmandu Valley

Hazards and damage were analyzed in a study on earthquake disaster mitigation in the Kathmandu Valley (JICA 2002). To estimate damage to buildings from the earthquake, a building inventory, especially one with the distribution of buildings by structural type, is necessary. Building structure types were grouped into the following seven classes based on the inventory.

ST:

Stone

AD:

Adobe

BM:

Brick with mud mortar, poorly built

BMW:

Brick with mud mortar, well built

BC:

Brick with cement or lime mortar

RC5:

Reinforced concrete (RC) frame with masonry of four stories or more

RC3:

RC frame with masonry of three stories or less

According to the inventory, we determined building types and their distribution in the settlement types of Kathmandu Valley. The main types are ST, AD, BM, BC and RC. Newer types (BC and RC) are predominant in the central and rapidly developing areas, and other types (ST, AD and BM) are predominant in rural or older core areas with dense population.

  1. (a)

    RC

RC buildings have been constructed in the last 30 or 40 years in urban areas. Although most building owners and constructors believe that RC buildings are safer and sufficiently strong, most buildings were designed without a structural engineer and were built with supervision by unskilled craftsmen or masons who had no fundamental practice or structural knowledge of RC work. The initial plan including such items as the size of columns and beams was probably for three-story buildings, but current RC buildings extend four to six stories without strengthening of columns and beams. This may be attributed to rapid increase of the urban population. Walls of the widened floors are supported by cantilever beams and are located outside the RC frames. The latter case has particularly great fragility in case of a great earthquake.

  1. (b)

    BC and BM

BC buildings, also constructed in the past 30 or 40 years, comprise about half the buildings in the valley. This type of building is still weak regarding horizontal rigidity, owing to poor workmanship and lack of structural consideration of the joints from wall to wall, wall to wooden floor and roof, and non-integration of the masonry wall itself. Although buildings of this type that are less than four stories are generally constructed with suitable workmanship and adequate wall balance, those more than four stories tall have great fragility during a powerful earthquake.

BM buildings remain in urban and rural areas. These buildings have very poor horizontal rigidity because of low bond strength and strong absorption of moisture in mud joints, wooden floors and roofs. During a great earthquake, BM buildings of less than three stories appear fragile and those of three or more are even more fragile.

  1. (c)

    AD and ST

AD and ST buildings have great fragility during a moderate earthquake.

7 Classification of Damage to Masonry Buildings

Table 1 shows EMS-98, which is the European standard. According to this, Grades 1–5 are defined below.

Table 1 Classification of damage to masonry buildings by EMS-98 (Grade1–5) (Grünthal 1998)
Grade 5:

Very heavy structural damage

Grade 4:

Very heavy structural and non-structural damage

Grade 3:

Moderate structural damage and heavy non-structural damage

Grade 2:

Slight structural damage and non-structural damage

Grade 1:

No structural damage and slight non-structural damage

According to JICA (2002), “Collapse” and “Damage” were defined as below.

Collapse:

Collapsed or un-repairable (unsuitable for living)

Damage:

Collapsed or un-repairable (unsuitable for living) + 1/2 repairable (available for temporary living)

This standard is difficult to correspond with Nepalese building conditions. Figure shows the building state of the site after the earthquake. In this study, Grade 5 or upper Grade 4 was determined by complete or non-complete collapse.

Grade 3 or upper Grade 4 was determined by moderate structural damage or not enough. A grade >3 was not determined for ground truth distinction by a satellite image, and was assigned a corresponding category.

7.1 Survey of Building Damage in Sankhu Core Area

This town was the ancient trade route with Tibet. Many Tibetan is living even at present. However these, buildings lose a source of income by present and decline, and are superannuated, and a renovation is not performed.

The difference in damage between the various building types is remarkable. Generally, the damage in Sankhu was extensive. Brick and cement mortar houses without RC columns had considerable damage, whereas damage to RC structures—particularly those erected in recent years—was generally minor. These latter structures were mainly five- to six-story buildings, whereas many of the non-engineered masonry structures that experienced complete collapse or partial damage had two to four stories.

7.2 Survey of Building Damage in Khokana Core Area

Khokana is a traditional old town on a small hill in the southwestern Kathmandu Valley. It is a municipality in the Lalitpur District of Bagmati Prefecture, central Nepal, ~10 km south of the city of Kathmandu.

According to an interview survey of the inhabitants, all buildings collapsed during the 1934 Bihar Earthquake in Khokana, except for one, which is being renovated. Thus, the historical buildings are <80 years old. Well-built historical buildings had expensive improvements for earthquake resistance, which included mixing plaster with mud joints.

7.3 Survey of Damage for Every House in Sankhu and Khokana

NIED and JAXA surveyed of damage for every house in Sankhu and Khokana (Ohsumi et al. 2015; Watanabe et al. submitted). A survey of the degree of damage was conducted for every house in Sankhu and Khokana by the European Macroseismic Scale (EMS)-98.

Damage extent was surveyed for every house in Sankhu on August 17–18, 2015 (Fig. 21a) using EMS-98. A high-resolution image from March 12 (before the disaster) was obtained via Google Earth™ prior to the survey. This image was used to identify the position of each building before the earthquake, based on which the extent of damage to each building was estimated in accord with EMS-98.

Fig. 21
figure 21

Survey of damage extent for every house in Sankhu (a), and Khokana (b) (Ohsumi et al. 2015; Watanabe et al. submitted)

Khokana was once Newari village and has retained its tradition and culture as a World Heritage Site in Nepal. A damage survey was conducted for every house in Khokana on August 19–20, 2015 (Fig. 21b).

We performed a helicopter and unmanned aerial vehicle (UAV) photogrammetry survey in Sankhu and Khokana, to map buildings and damage related to the 2015 Nepal Earthquake. NIED and National Society for Earthquake Technology (NSET) Nepal will use the data for research on building damage distribution, calibration of satellite imagery by ground truth data, and more detailed risk assessment of cities and rural communities as a survey in addition to the ground truth survey.

3D digital surface models of buildings will be created to measure building heights and shapes. Raw photos with oblique views can be used to investigate damage in more detail and structures. This technique was applied to the helicopter and UAV investigation. The helicopter flight was used for a photogrammetry survey of Sankhu on 20 Aug 2015. We used a helicopter (Bell Jet Ranger 206B).

The UAV flight was used for a photogrammetry survey of Khokana on 23 Nov 2015. We used a compact UAV, a battery-powered aircraft with onboard digital camera in auto-pilot mode to take aerial photos from 50 to 150 m above ground. The craft cruises at a speed ~60 km/h for about 20 min, covering an area of 2 km2 in one flight. Pictures are processed by photogrammetry software to create Orthomosaic photos for mapping. Safety of the flights and compliance with regulations were of primary importance. Our fixed-wing foam aircraft is much safer than popular multi-rotor drones. It will not injure people if it crashes because: (1) the fuselage is made of soft Styrofoam; (2) the propeller is rear-facing; and (3) it can glide when falling. Autopilot flight can be programmed to avoid prohibited zones and is above the height limit directed by the Civil Aviation Authority.

Figure 22a, b show the survey of building type classification for every house in Sankhu and Khokana. The number for damage extent of each building type for every house is shown in Tables 2 and 3. The difference in damage by building type was remarkable. Brick and cement mortar houses without RC columns experienced substantial damage. In contrast, damage to RC structures, particularly those erected in recent years, was generally minor.

Fig. 22
figure 22

Survey of building type for every house in Sankhu (a), and Khokana (b)

Table 2 EMS level for each ratio and building type in Sankhu
Table 3 EMS level for each ratio and building type in Khokana

The total number of buildings for each area are shown in the upper stage, and the percentages of each item are shown in the lower stage. There was no damage to 94 % of the surveyed RC buildings. From the comparison of BM and BC, the collapse ratio was improved by 27 % in Sankhu and 16 % in Khokana for BC houses. There was 0 % BM Well with very heavy structural damage in both areas.

7.4 Completion with Fragility Curves

JICA (2002) study defining fragility curves for estimating damage to buildings was to determine the relationship between damage ratio and ground acceleration for each building type. These curves refer to the graph showing this relationship. In this study, the curves for buildings in the Kathmandu Valley were determined as shown in Fig. 23a, b.

Fig. 23
figure 23

Fragility curves of relation between damage rate and peak ground acceleration. a Damage rate, b Collapse rate

In the aforementioned JICA study, fragility curves for buildings in the valley were adjusted by calibrating existing fragility curves for Indian buildings from Arya (2000) and those for West Nepal from a UNDP/UNCHS (1994) study. For this calibration, damage from the 1988 Udayapur earthquake cited in Murakami et al. (1990) and Dikshit (1991) were analyzed. These papers present very large seismic intensity distributions compared to the expected peak ground accelerations. We reanalyzed the intensity considering building weakness in our damage area, most of which are AD or poor BM. Fragility curves of the relationship between damage rate and peak ground acceleration for each building type are shown in Fig. 23.

In the 2015 Gorkha Earthquake, there were no acceleration observation points in Sankhu and Khokana. The USGS maximum acceleration record was 160 Gal at the US embassy in the city of Kathmandu. The distance between that embassy and Sankhu is ~15 km, and that between the embassy and Khokana is ~5 km. According to Takai et al. (2015), the main shock in the observation results was 151 Gal at Lalitpur and 146 Gal at Thimi. Estimation of main shock acceleration values was 150 Gal in Sankhu and Khokana.

Damage ratio of RC is 7–8 % and damage ratio of BM is the 20 %.

Graed 5, damage ratio of RC is 0 %, damage ratio of BM is 40 %. In Khokana, damage ratio (Table 4) of RC is 6 %, BM is 70 %. Collapse ratio of RC is 0 %, BM is 20 %. The damage curved line of BM is exceeded the damage curved line of ST, AD.

Table 4 Fragility curves (JICA, 2002) and damage and collapse rate

BM is composite structure including the sun-dried brick (AD). The building classification is different in ages and referred earthquakes (i.e., the 1934 Bihal Earthquake, the 1988 Udayapur Earthquake).

The complicated composite structure is being classified in BM by the damage function. On the other hand, RC is actual damage rate and the damage function rate are good agreement (Table 4).

7.5 SAR Analysis

In the severely damaged core area, the principal mechanism of microwave radar backscattering changes from double-bounce to rough-surface scattering. This change corresponds to a decrease of coherence (γ) in synthetic aperture radar (SAR) imagery observed before and after the disaster (Fig. 24). The value of γ represents the similarity between two images. A decrease in γ was determined in the data obtained over Sankhu and Khokana by the Japanese SAR satellite ALOS-2, and this was used to delineate severely damaged urban areas. Field surveys confirmed that damaged areas were effectively detected by a decrease in γ (Watanabe et al. submitted).

Fig. 24
figure 24

Whole interferogram obtained by the analysis. a Pre-event, b Post-event

Figure 25 shows the full view area as a Google Earth image, including (a) the Timi, Bhaktapur and Sankhu core areas, and (b) the Kirtipur, Khokana and Bungamati core areas. The damaged core area is identified using the coherence change (Δγ) obtained before the disaster (γpre) and between the disasters (γint).

Fig. 25
figure 25

Full view of the area as a Google Earth image, including a the Timi, Bhaktapur and Sankhu core areas and b the Kirtipur, Khokana and Bungamati core areas. The damaged core area is detected using the coherence change (Δγ) obtained before the disaster (γ pre) and between the disasters (γ int). Subscript (pre2–pre1): Two coherences that were acquired from the images before the disaster (γ pre). Subscript (pre2-int): Two coherences that were acquired from the images before the disaster (γ pre) and between the disasters (γ int)

Figure 26 shows regions of bright reflections within severely damaged core areas such as Timi, Bhaktapur and Sankhu. Figure 27 shows the coherence magnitude and a survey of damage extent for every house in Sankhu. The decrease in coherence (γ) in the SAR imagery observed before and after the disaster readily facilitated detection of damage in the region.

Fig. 26
figure 26

Bright reflection areas for severely damaged urban area such as Timi, Bhaktapur and Sankhu core areas

Fig. 27
figure 27

Coherence magnitude (a) and survey of damage extent (b) for every house in Sankhu

Figure 28 shows regions of bright reflections within severely damaged core areas such as Khokana and Bungamati. Figure 29 shows the coherence magnitude and a survey of damage extent for every house in Khokana. Reflections in the slightly damaged Kirtipur core area are not as clear and bright as those in the severely damaged core areas of Khokana and Bungamati.

Fig. 28
figure 28

Bright reflection areas for Khokana and Bungamati core areas. Kirtipur was not clear bright reflection

Fig. 29
figure 29

Coherence magnitude (a) and survey of damage extent (b) for every house in Khokana

7.5.1 Reason for Slight Damage at Kirtipur

The epicentral distance of the Kirtipur core area was 79.74 km, compared with 80.69 km for the epicentral distance of the Khokana core area. Both core areas are old traditional towns on small hills in the southwestern Kathmandu Valley. According to Takai et al. (2015), acceleration was amplified in Patan (Khokana) located in the Kathmandu Valley. In contrast, acceleration was less amplified in Kirtipur, which is located on outcropping basement rock units outside the valley.

8 After the 2015 Gorkha, Nepal Earthquake and Beyound

The recovery and reconstruction processes following the 2015 Gorkha, Nepal Earthquake are ongoing. The damage to RC structures was generally minor. Many of the non-engineered masonry structures that experienced complete collapse or partial damage were two- to four-story buildings. Although many of the masonry structures will be reconstructed as RC structures, traditional building methods should be sustained by traditional communities not only to conserve world heritage but also to improve the earthquake resistance of cities. In the following subsections we present a method for the constructing earthquake-resistant buildings using traditional methods.

8.1 Stabilized Mud Mortar with Lime

In the Sankhu core area, traditional buildings over 100 years old suffered little damage in the 2015 Gorkha Earthquake. Well-built historical buildings underwent expensive improvements for earthquake resistance, which included using a mix of plaster and mud. Rashmi et al. (2014) proposed the use of a homogenous mixture comprising fine aggregates as mud mortars to bind, individually or combined with cement and lime (Fig. 30). According to this report, the workability and strength of twelve different combinations of stabilized mud mortars were examined. The compressive strength of mortar with 50 % sand and 12 % cement is in the range of 4.25 MPa, which is within the IS (Indian Standard) code specification. The use of this mixture as a stabilizing mud mortar in construction was shown to be sustainable as well as economical.

Fig. 30
figure 30

28 days compressive strength (Rashmi et al. 2014) Y-axis is each magnification of the strengths of the case indicate taken as 1 at 20 % clay (100 % soil) case after 28 days of curing

8.2 Horizontal Timber Beam Reinforcement

A number of documents discussing improvements in seismic-resistant construction methods for masonry structure were prepared under the National Building Code Development Project (NEP/88/054/21.03) in 1993.

“Guidelines for Earthquake Resistant Building Construction: Low Strength Masonry (LSM)” is one of them. This document provides basic guidelines for earthquake-resistant construction methods of low-strength masonry.

NBC 202:

Mandatory Basic Rules for Load Bearing Masonry

NBC 203:

Guidelines for Earthquake Resistant Building Construction: Low Strength Masonry

NBC 204:

Guidelines for Earthquake Resistant Building Construction: Earthen Buildings (EB)

NBC 203 and 204 describe the effect of wooden strips as horizontal reinforcing members. An assemblage of two parallel lengths of timber connected by struts is placed horizontally in the wall covering the entire thickness of the wall, as illustrated in Fig. 31.

Fig. 31
figure 31

Placement of timber for horizontal reinforcement bands (after National Building Code NBC203). Wooden Collar Beam with anchor bolt (a), Horizontal reinforcement with liner (b), Two sawn lumbers (c)

In Dolakha Bazaar, an old town located 4 km from Charikot in north-eastern Nepal, the buildings installed horizontal timber support planks. The timber planks were installed between the first and second floors of the building, along the outside wall of the building. In buildings with narrow sides and a gable wall, the timber is usually fitted along the outer periphery of the building separate from the floor beam. In the long side of the building, the timber is installed so as to form a common joint in the outer periphery of the building. The corner joint varies according to the building style, but notched joints are commonly used (Fig. 32).

Fig. 32
figure 32

Timber band installed between the first and second floors in a house in Charikot (a) and Corner joint of horizontal timber planks (b). (Photos by Dr. Hiroshi Imai of the JICA study team)

Traditional construction methods should be sustained by traditional communities not only to conserve world heritage but also to improve the earthquake resistance of cities. Technologies for the construction of earthquake-resistant buildings using traditional methods such as stabilizing buildings using mud mortar with lime and horizontal timber beams are both effective and sustainable.

9 Conclusions

  1. 1.

    RC buildings were partially damaged, and many masonry buildings were severely damaged. The difference in damage extent between the various building types was remarkable.

  2. 2.

    Along the west side of the Kathmandu Ring Road, RC frame buildings were damaged in some cases by during the 2015 Gorkha, Nepal Earthquake. The building damage might be caused by the soft ground conditions near the river branch as well as inappropriate construction methods.

  3. 3.

    BM buildings survived in urban and rural areas. These buildings have very poor horizontal rigidity because of low bond strength and strong moisture absorption in mud joints, wooden floors and roofs.

  4. 4.

    Damage extent and building type classification were surveyed for every house in Sankhu and Khokana. There was no damage to 94 % of surveyed RC buildings. The collapse ratio was improved using BC relative to BW.

  5. 5.

    Some buildings survived the 1934 Bihar Earthquake and the 2015 Gorkha Earthquake in Sankhu. These building structure types were classified as well built, using a type of brick with mud mortar.

  6. 6.

    For RC, the actual damage rate and damage function rate were in good agreement. The damage curve of BM exceeded that of ST and AD.

  7. 7.

    Tradition chowks are observed to have excellent earthquake resistance. However, chowks that have been altered and/or changed were damaged.

  8. 8.

    Comparison of the coherence magnitude with a survey of the damage extent for every house in Sankhu and Khokana detected damage well. Greatest damage correlated with the decreases of coherence (γ) in SAR imagery observed before and after the disaster. The brightest reflections occurred for severely damaged core areas, such as those in Khokana and Bungamati. Regions of less-bright reflections, such as those observed in Kirtipur, corresponded to only slightly damaged core areas.