Skip to main content
Log in

Moment balanced machine: a new supervised inference engine for on-site construction productivity prediction

  • Published:
Applied Intelligence Aims and scope Submit manuscript

Abstract

Predicting construction productivity is challenging because of the complexity involved in the construction process and the variability in factors that regularly affect these projects. Machine learning models have the potential to improve the accuracy of construction productivity predictions. This study introduces a model for generating accurate predictions of construction productivity using an AI-based inference engine called Moment Balanced Machine (MBM). Instead of identifying the hyperplane of SVM, MBM considers moments to determine the optimal moment hyperplane. MBM balances the moments, which are the product of force and distance, with force representing the weight assigned to a datapoint and distance indicating its position relative to the moment hyperplane. To obtain the weights for each datapoint within the MBM framework, Backpropagation Neural Network (BPNN) is employed. Moreover, the performance of MBM is benchmarked against five other machine learning models, including SVM, BPNN, K-Nearest Neighbor (KNN), Decision Tree (DT), and Linear Regression (LR). According to the results of the 10-fold cross-validation, MBM consistently outperformed the other models across five evaluation metrics, including RMSE (0.068), MAE (0.054), MAPE (3.42%), R (0.982), and R2 (0.965). The comprehensive assessment, summarized by the Reference Index (RI), indicates that MBM achieved the highest RI score of 1.000, emphasizing its superior performance. Furthermore, MBM exhibits robustness against data imperfections, including incomplete and noisy datasets. Given these findings, the proposed model could serve as an advanced machine learning decision-support system that improves the prediction accuracy of construction productivity. This reinforces the data-driven approach for improving the efficiency of construction projects.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Fig. 11
Fig. 12
Fig. 13

Similar content being viewed by others

Data availability

The code and dataset for this study is available at:    https://github.com/MomentBalancedMachine/MBM.

References

  1. Liang W, Yang M (2019) Urbanization, economic growth and environmental pollution: evidence from China. Sustain Comput Inf Syst 21:1–9. https://doi.org/10.1016/j.suscom.2018.11.007

    Article  Google Scholar 

  2. Kianto A, Shujahat M, Hussain S, Nawaz F, Ali M (2019) The impact of knowledge management on knowledge worker productivity. Baltic J Manage 14:178–197. https://doi.org/10.1108/BJM-12-2017-0404

    Article  Google Scholar 

  3. Alaloul WS, Liew MS, Zawawi NAWA, Kennedy IB (2020) Industrial revolution 4.0 in the construction industry: challenges and opportunities for stakeholders. Ain Shams Eng J 11:225–230. https://doi.org/10.1016/j.asej.2019.08.010

    Article  Google Scholar 

  4. Zou X, Zhang L (2020) A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic. Autom Constr 109:102990. https://doi.org/10.1016/j.autcon.2019.102990

    Article  Google Scholar 

  5. Kavuma A, Ock J, Jang H (2019) Factors influencing time and cost overruns on freeform construction projects. KSCE J Civ Eng 23:1442–1450. https://doi.org/10.1007/s12205-019-0447-x

    Article  Google Scholar 

  6. Zhang N, Deng X, Zhao X, Chang T (2019) Exploring the sources of contractors’ competitive advantage on international HSR construction projects. Int J Civil Eng 17:1115–1129. https://doi.org/10.1007/s40999-018-0373-1

    Article  Google Scholar 

  7. Javed AA, Pan W, Chen L, Zhan W (2018) A systemic exploration of drivers for and constraints on construction productivity enhancement, built environment project and asset. Management 8:239–252. https://doi.org/10.1108/BEPAM-10-2017-0099

    Article  Google Scholar 

  8. Safapour E, Kermanshachi S (2019) Identifying early indicators of manageable rework causes and selecting mitigating best practices for construction. J Manag Eng 35:04018060. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000669

    Article  Google Scholar 

  9. Abbasi O, Noorzai E, Gharouni Jafari K, Golabchi M (2020) Exploring the causes of delays in construction industry using a cause-and-effect diagram: case study for Iran. J Archit Eng 26:05020008. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000431

    Article  Google Scholar 

  10. Tariq J, Gardezi SSS (2023) Study the delays and conflicts for construction projects and their mutual relationship: a review. Ain Shams Eng J 14:101815. https://doi.org/10.1016/j.asej.2022.101815

    Article  Google Scholar 

  11. Alaghbari W, Al-Sakkaf AA, Sultan B (2019) Factors affecting construction labour productivity in Yemen. Int J Constr Manage 19:79–91. https://doi.org/10.1080/15623599.2017.1382091

    Article  Google Scholar 

  12. Hasan A, Baroudi B, Elmualim A, Rameezdeen R (2018) Factors affecting construction productivity: a 30 year systematic review. Eng Constr Archit Manag 25:916–937. https://doi.org/10.1108/ECAM-02-2017-0035

    Article  Google Scholar 

  13. Cui P, Ge Y, Li S, Li Z, Xu X, Zhou GGD, Chen H, Wang H, Lei Y, Zhou L, Yi S, Wu C, Guo J, Wang Q, Lan H, Ding M, Ren J, Zeng L, Jiang Y, Wang Y (2022) Scientific challenges in disaster risk reduction for the Sichuan–Tibet railway. Eng Geol 309:106837. https://doi.org/10.1016/j.enggeo.2022.106837

    Article  Google Scholar 

  14. Regona M, Yigitcanlar T, Xia B, Li RYM (2022) Opportunities and adoption challenges of AI in the construction industry: a PRISMA Review. J Open Innov: Technol Market Complex 8:45. https://doi.org/10.3390/joitmc8010045

    Article  Google Scholar 

  15. Khanh HD, Kim SY, Linh LQ (2022) Construction productivity prediction through Bayesian networks for building projects: case from Vietnam. Eng Constr Archit Manag 30:2075–2100. https://doi.org/10.1108/ECAM-07-2021-0602

    Article  Google Scholar 

  16. Taboada I, Daneshpajouh A, Toledo N, de Vass T (2023) Artificial intelligence enabled project management: a systematic literature review. Appl Sci (Switzerland) 13. https://doi.org/10.3390/app13085014

  17. Pan Y, Zhang L (2021) Roles of artificial intelligence in construction engineering and management: a critical review and future trends. Autom Constr 122:103517. https://doi.org/10.1016/j.autcon.2020.103517

    Article  Google Scholar 

  18. Momade MH, Shahid S, bin Hainin MR, Nashwan MS, Tahir Umar A (2022) Modelling labour productivity using SVM and RF: a comparative study on classifiers performance. Int J Constr Manage 22:1924–1934. https://doi.org/10.1080/15623599.2020.1744799

    Article  Google Scholar 

  19. Nasirzadeh F, Kabir HMD, Akbari M, Khosravi A, Nahavandi S, Carmichael DG (2020) ANN-based prediction intervals to forecast labour productivity. Eng Constr Archit Manag 27:2335–2351. https://doi.org/10.1108/ECAM-08-2019-0406

    Article  Google Scholar 

  20. El-Gohary KM, Aziz RF, Abdel-Khalek HA (2017) Engineering approach using ANN to improve and predict construction labor productivity under different influences. J Constr Eng Manag 143:1–10. https://doi.org/10.1061/(asce)co.1943-7862.0001340

    Article  Google Scholar 

  21. Sadatnya A, Sadeghi N, Sabzekar S, Khanjani M, Tak AN, Taghaddos H (2023) Machine learning for construction crew productivity prediction using daily work reports. Autom Constr 152:104891. https://doi.org/10.1016/j.autcon.2023.104891

    Article  Google Scholar 

  22. Ghodrati N, Wing Yiu T, Wilkinson S, Shahbazpour M (2018) Role of management strategies in improving labor productivity in general construction projects in New Zealand: managerial perspective. J Manag Eng 34:04018035. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000641

    Article  Google Scholar 

  23. Oppong GD, Chan APC, Dansoh A (2017) A review of stakeholder management performance attributes in construction projects. Int J Project Manage 35:1037–1051. https://doi.org/10.1016/j.ijproman.2017.04.015

    Article  Google Scholar 

  24. Agrawal A, Halder S (2020) Identifying factors affecting construction labour productivity in India and measures to improve productivity. Asian J Civil Eng 21:569–579. https://doi.org/10.1007/s42107-019-00212-3

    Article  Google Scholar 

  25. Luangcharoenrat C, Intrachooto S, Peansupap V, Sutthinarakorn W (2019) Factors influencing construction waste generation in building construction: Thailand’s perspective. Sustainability (Switzerland) 11. https://doi.org/10.3390/su11133638

  26. García de Soto B, Agustí-Juan I, Hunhevicz J, Joss S, Graser K, Habert G, Adey BT (2018) Productivity of digital fabrication in construction: cost and time analysis of a robotically built wall. Autom Constr 92:297–311. https://doi.org/10.1016/j.autcon.2018.04.004

    Article  Google Scholar 

  27. Cheng MY, Cao MT, Mendrofa AY (2021) Dynamic feature selection for accurately predicting construction productivity using symbiotic organisms search-optimized least square support vector machine. J Build Eng 35:101973. https://doi.org/10.1016/j.jobe.2020.101973

    Article  Google Scholar 

  28. Sarker IH (2021) Machine learning: algorithms, real-world applications and research directions. SN Comput Sci 2:1–21. https://doi.org/10.1007/s42979-021-00592-x

    Article  MathSciNet  Google Scholar 

  29. Karatas I, Budak A (2022) Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity. Eng Constr Archit Manag. https://doi.org/10.1108/ECAM-08-2021-0692

    Article  Google Scholar 

  30. Chan APC, Zhang Y, Wang F, Wong FFK, Chan DWM (2017) A field study of the effectiveness and practicality of a novel hybrid personal cooling vest worn during rest in Hong Kong construction industry. J Therm Biol 70:21–27

    Article  Google Scholar 

  31. Ballesteros-Pérez P, Smith ST, Lloyd-Papworth JG, Cooke P (2018) Incorporating the effect of weather in construction scheduling and management with sine wave curves: application in the United Kingdom. Constr Manage Econ 36:666–682. https://doi.org/10.1080/01446193.2018.1478109

    Article  Google Scholar 

  32. Elwakil E (2018) Construction productivity fuzzy knowledge base management system. Can J Civ Eng 45:329–338. https://doi.org/10.1139/cjce-2017-0540

    Article  Google Scholar 

  33. Wang F (2005) On-Site labor productivity estimation using neural networks. Concordia University. https://spectrum.library.concordia.ca/id/eprint/8516/. Accessed 14 Apr 2023

  34. Li X, Chow KH, Zhu Y, Lin Y (2016) Evaluating the impacts of high-temperature outdoor working environments on construction labor productivity in China: a case study of rebar workers. Build Environ 95:42–52. https://doi.org/10.1016/j.buildenv.2015.09.005

    Article  Google Scholar 

  35. Elshaboury N (2022) Training adaptive neuro fuzzy inference system using genetic algorithms for Predicting Labor Productivity. Springer International Publishing. https://doi.org/10.1007/978-3-030-97255-4_24

  36. Golnaraghi S, Zangenehmadar Z, Moselhi O, Alkass S, Vosoughi AR (2019) Application of artificial neural network(s) in predicting formwork labour productivity. Adv Civ Eng 2019. https://doi.org/10.1155/2019/5972620

  37. Shahtaheri M, Nasir H, Haas CT (2015) Setting baseline rates for on-site work categories in the construction industry. J Constr Eng Manag 141:1–11. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000959

    Article  Google Scholar 

  38. Liu X, Song Y, Yi W, Wang X, Zhu J (2018) Comparing the random forest with the generalized additive model to evaluate the impacts of outdoor ambient environmental factors on scaffolding construction productivity. J Constr Eng Manag 144:4018037. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001495

    Article  Google Scholar 

  39. Khan ZU (2005) Modeling and parameter ranking of construction labor productivity. Concordia University. https://concordiauniversity.on.worldcat.org/search?queryString=ot:(Spectrum)+8615. Accessed 14 Apr 2023

  40. Senarath Jayasinghe R, Fernando NG (2017) Developing labour productivity norms for aluminium system formwork in Sri Lanka. Built Environ Project Asset Manag 7:199–211. https://doi.org/10.1108/BEPAM-09-2015-0049

  41. Al Refaie AM, Alashwal AM, Abdul-Samad Z, Salleh H (2021) Weather and labor productivity in construction: a literature review and taxonomy of studies. Int J Product Perform Manage 70:941–957. https://doi.org/10.1108/IJPPM-12-2019-0577

    Article  Google Scholar 

  42. Wandahl S, Pérez CT, Salling S, Neve HH (2023) Correlation of construction workers’ movement and direct work rates. J Eng Project Prod Manage 13:125–137. https://doi.org/10.32738/JEPPM-2023-0013

    Article  Google Scholar 

  43. Chan APC, Guo YP, Wong FKW, Li Y, Sun S, Han X (2016) The development of anti-heat stress clothing for construction workers in hot and humid weather. Ergonomics 59:479–495. https://doi.org/10.1080/00140139.2015.1098733

    Article  Google Scholar 

  44. Jarkas AM, Al Balushi RA, Raveendranath PK (2015) Determinants of construction labour productivity in Oman. Int J Constr Manage 15:332–344. https://doi.org/10.1080/15623599.2015.1094849

    Article  Google Scholar 

  45. Ghoddousi P, Poorafshar O, Chileshe N, Hosseini MR (2015) Labour productivity in Iranian construction projects perceptions of chief executive officers. Int J Product Perform Manage 64:811–830. https://doi.org/10.1108/IJPPM-10-2013-0169

    Article  Google Scholar 

  46. Rivas RA, Borcherding JD, González V, Alarcón LF (2011) Analysis of factors influencing productivity using craftsmen questionnaires: case study in a chilean construction company. J Constr Eng Manag 137:312–320. https://doi.org/10.1061/(asce)co.1943-7862.0000274

    Article  Google Scholar 

  47. Li G, Xue Y, Qu C, Qiu D, Wang P, Liu Q (2023) Intelligent prediction of rockburst in tunnels based on back propagation neural network integrated beetle antennae search algorithm. Environ Sci Pollut Res: 33960–33973. https://doi.org/10.1007/s11356-022-24420-8

  48. Fei J, Wu Z, Sun X, Su D, Bao X (2021) Research on tunnel engineering monitoring technology based on BPNN neural network and MARS machine learning regression algorithm. Neural Comput Appl 33:239–255. https://doi.org/10.1007/s00521-020-04988-3

    Article  Google Scholar 

  49. Han B, Geng F, Dai S, Gan G, Liu S, Yao L (2020) Statistically optimized back-propagation neural-network model and its application for deformation monitoring and prediction of concrete-face Rockfill dams. J Perform Constr Facil 34:1–8. https://doi.org/10.1061/(asce)cf.1943-5509.0001485

    Article  Google Scholar 

  50. Cai B, Pan G, Fu F (2020) Prediction of the postfire flexural capacity of RC beam using GA-BPNN machine learning. J Perform Constr Facil 34:1–11. https://doi.org/10.1061/(asce)cf.1943-5509.0001514

    Article  Google Scholar 

  51. Liu Z, Liu X, Wang K, Liang Z, Correia JAFO, De Jesus A (2019) Neural network-based strain prediction in full-scale static testing of wind turbine blades. Energies 12:1026. https://doi.org/10.3390/en12061026

    Article  Google Scholar 

  52. Song X, Wang K, Zhou L, Chen Y, Ren K, Wang J (2022) Multi-factor mining and corrosion rate prediction model construction of carbon steel under dynamic atmospheric corrosion environment. Eng Fail Anal 134:105987. https://doi.org/10.1016/j.engfailanal.2021.105987

    Article  Google Scholar 

  53. Chen S, Associate D, Zhao Y (2020) The prediction analysis of properties of recycled aggregate permeable concrete based on back-propagation neural network. J Clean Prod 276:124187. https://doi.org/10.1016/j.jclepro.2020.124187

    Article  Google Scholar 

  54. Cortes C, Vapnik V (1995) Support-vector networks. Mach Learn 20:273–297

    Article  Google Scholar 

  55. Zhang Q, Liu D, Fan Z, Lee Y, Li Z (2011) Feature and sample weighted support vector machine. BMC Bioinformatics 8:365–371. https://doi.org/10.1007/978-3-642-25661-5_47

    Article  Google Scholar 

  56. Lapin M, Hein M, Schiele B (2014) Learning using privileged information: SV M + and weighted SVM. Neural Netw 53:95–108. https://doi.org/10.1016/j.neunet.2014.02.002

    Article  Google Scholar 

  57. Moslemnejad S, Hamidzadeh J (2021) Weighted support vector machine using fuzzy rough set theory. Soft Comput 25:8461–8481. https://doi.org/10.1007/s00500-021-05773-7

    Article  Google Scholar 

  58. Fan Z, Chiong R, Hu Z, Lin Y (2020) A fuzzy weighted relative error support vector machine for reverse prediction of concrete components. Comput Struct 230:106171. https://doi.org/10.1016/j.compstruc.2019.106171

    Article  Google Scholar 

  59. Luo S, Dai Z, Chen T, Chen H, Jian L (2020) A weighted SVM ensemble predictor based on AdaBoost for blast furnace ironmaking process. Appl Intell 50:1997–2008. https://doi.org/10.1007/s10489-020-01662-y

    Article  Google Scholar 

  60. Pedregosa F, Varoquaux G, Gramfort A, Michel V, Thirion B, Grisel O, Blondel M, Prettenhofer P, Weiss R (2011) Dubourg, others, Scikit-learn: machine learning in Python. J Mach Learn Res 12:2825–2830

    MathSciNet  Google Scholar 

  61. Gohari M, Eydi AM (2020) Modelling of shaft unbalance: Modelling a multi discs rotor using K-Nearest Neighbor and Decision Tree Algorithms, Measurement: Journal of the International Measurement Confederation. 151:107253. https://doi.org/10.1016/j.measurement.2019.107253

  62. Bansal M, Goyal A, Choudhary A (2022) A comparative analysis of K-Nearest neighbor, genetic, support vector machine, decision tree, and long short term memory algorithms in machine learning. Decis Anal J 3:100071. https://doi.org/10.1016/j.dajour.2022.100071

    Article  Google Scholar 

  63. Chang CC, Lin CJ (2011) LIBSVM: A Library for support vector machines. ACM Trans Intell Syst Technol 2. https://doi.org/10.1145/1961189.1961199

  64. Yeh I-C (2007) Concrete compressive strength. UCI Mach Learn Repository. https://doi.org/10.24432/C5PK67

  65. Harrison D, Rubinfeld D (2016) Boston Housing. UCI Mach Learn Repository. https://kaggle.com/competitions/boston-housing

  66. Tsanas A, Xifara A (2012) Energy efficiency. UCI Mach Learn Repository. https://doi.org/10.24432/C51307

  67. Ding C, Xia Y, Yuan Z, Yang H, Fu J, Chen Z (2023) Performance prediction for a fuel cell air compressor based on the combination of backpropagation neural network optimized by genetic algorithm (GA-BP) and support vector machine (SVM) algorithms. Therm Sci Eng Prog 44:102070. https://doi.org/10.1016/j.tsep.2023.102070

    Article  Google Scholar 

  68. Rosso MM, Cucuzza R, Di Trapani F, Marano GC (2021) Nonpenalty machine learning constraint handling using PSO-SVM for structural optimization. Adv Civil Eng 2021:1–17. https://doi.org/10.1155/2021/6617750

    Article  Google Scholar 

  69. Cheng M-Y, Prayogo D (2014) Symbiotic organisms search: a new metaheuristic optimization algorithm. Comput Struct 139:98–112. https://doi.org/10.1016/j.compstruc.2014.03.007

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Min-Yuan Cheng.

Additional information

Publisher’s Note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Rights and permissions

Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Cheng, MY., Khasani, R.R. Moment balanced machine: a new supervised inference engine for on-site construction productivity prediction. Appl Intell 54, 5441–5464 (2024). https://doi.org/10.1007/s10489-024-05419-9

Download citation

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s10489-024-05419-9

Keywords

Navigation