A bi-objective identical parallel machine scheduling problem with controllable processing times: a just-in-time approach

  • ORIGINAL ARTICLE
  • Published:
The International Journal of Advanced Manufacturing Technology Aims and scope Submit manuscript

Abstract

In this research, a bi-objective scheduling problem with controllable processing times on identical parallel machines is investigated. The direction of this paper is mainly motivated by the adoption of the just-in-time (JIT) philosophy on identical parallel machines in terms of bi-objective approach, where the job processing times are controllable. The aim of this study is to simultaneously minimize (1) total cost of tardiness, earliness as well as compression and expansion costs of job processing times and (2) maximum completion time or makespan. Also, the best possible set amount of compression/expansion of processing times on each machine is acquired via the proposed “bi-objective parallel net benefit compression-net benefit expansion” (BPNBC-NBE) heuristic. Besides that, a sequence of jobs on each machine, with capability of processing all jobs, is determined. In this area, no inserted idle time is allowed after starting machine processing. For solving such bi-objective problem, two multi-objective meta-heuristic algorithms, i.e., non-dominated sorting genetic algorithm II (NSGAII) and non-dominated ranking genetic algorithm (NRGA) are applied. Also, three measurement factors are then employed to evaluate the algorithms’ performance. Experimental results reveal that NRGA has better convergence near the true Pareto-optimal front as compared to NSGAII, while NSGAII finds a better spread in the entire Pareto-optimal region.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Baker, K.R., 1994. Elements of sequencing and scheduling, Hanover: HN

  2. Sun H, Wang G (2003) Parallel machine earliness and tardiness scheduling with proportional weights. Comput Oper Res 30(5):801–808

    Article  MATH  Google Scholar 

  3. Hall NG, Posner ME (2001) Generating experimental date for computational testing with machine scheduling applications. Oper Res 49:854–865

    Article  MATH  MathSciNet  Google Scholar 

  4. Baker KR, Scudder GD (1990) Sequencing with earliness and tardiness penalties: a review. Oper Res 38:22–36

    Article  MATH  MathSciNet  Google Scholar 

  5. Hall NG, Posner ME (1991) Earliness–tardiness scheduling problems. I: weighted deviation of completion times about a common due date. Oper Res 39:836–846

    Article  MATH  MathSciNet  Google Scholar 

  6. Wang A, Huang Y, Taunk P, Magnin DR, Ghosh K, Robertson JG (2003) Application of robotics to steady state enzyme kinetics: analysis of tight-binding inhibitors of dipeptidyl peptidase IV. Anal Biochem 321(2):157–166

    Article  Google Scholar 

  7. Sørensen, J.F., Kragh, K.M., Sibbesen, O., Delcour, J., Goesaert, H., Svensson, B., et al., 2004. Potential role of glycosidase inhibitors in industrial biotechnological applications. Biochimica et Biophysica Acta (BBA)-Proteins & amp; Proteomics 1696(2), 275–287

  8. Sivrikaya F, Ulusoy G (1999) Parallel machine scheduling with earliness and tardiness penalties. Comput Oper Res 26:773–787

    Article  MATH  MathSciNet  Google Scholar 

  9. Cheng R, Gen M, Tosawa T (1995) Minmax earliness/tardiness scheduling in identical parallel machine system using genetic algorithms. Comput Ind Eng 29:513–517

    Article  Google Scholar 

  10. Kedad-Sidhoum S, Solis YR, Sourd F (2008) Lower bounds for the earliness-tardiness scheduling problem on parallel machines with distinct due dates. Eur J Oper Res 189(3):1305–1316

    Article  MATH  MathSciNet  Google Scholar 

  11. Su LH (2009) Minimizing earliness and tardiness subject to total completion time in an identical parallel machine system. Comput Oper Res 36(2):461–471

    Article  MATH  MathSciNet  Google Scholar 

  12. Drobouchevitch IG, Sidney JB (2012) Minimization of earliness, tardiness and due date penalties on uniform parallel machines with identical jobs. Comput Oper Res 39(9):1919–1926

    Article  MATH  MathSciNet  Google Scholar 

  13. Biskup D, Herrmann J, Gupta JND (2008) Scheduling identical parallel machines to minimize total tardiness. Int J Prod Econ 115(1):134–142

    Article  Google Scholar 

  14. Xi Y, Jang J (2012) Scheduling jobs on identical parallel machines with unequal future ready time and sequence dependent setup: an experimental study. Int J Prod Econ 137(1):1–10

    Article  Google Scholar 

  15. Shmoys, D.B., Tardos, E., 1993. Scheduling unrelated machines with costs, In: Proceedings of the 4th Annual ACM-SIAM Symposium, Austin, TX, January 25–27, pp. 448–454

  16. Coffman EG, Sethi R (1976) Algorithms minimizing mean flow time: schedule length properties. Acta Informatica 6:1–14

    Article  MATH  MathSciNet  Google Scholar 

  17. Lin CH, Liao CJ (2004) Makespan minimization subject to flowtime optimality on identical parallel machines. Comput Oper Res 31:1655–1666

    Article  MATH  MathSciNet  Google Scholar 

  18. Ruiz-Torres AJ, Lopez FJ (2004) Using the FDH formulation of DEA to evaluate a multi-criteria problem in parallel machine scheduling. Comput Ind Eng 47:107–121

    Article  Google Scholar 

  19. Suresh V, Chaudhuri D (1996) Bicriteria scheduling problem for unrelated parallel machines. Comput Ind Eng 30:77–82

    Article  Google Scholar 

  20. Ruiz-Torres AJ, Enscore EE, Barton RR (1997) Simulated annealing heuristics for the average flow-time and the number of tardy jobs bi-criteria identical parallel machine problem. Comput Ind Eng 33:257–260

    Article  Google Scholar 

  21. Chang PC, Chen SH, Lin KL (2005) Two-phase sub population genetic algorithm for parallel machine-scheduling problem. Expert Syst Appl 29:705–712

    Article  Google Scholar 

  22. Gao J, He G, Wang Y (2009) A new parallel genetic algorithm for solving multi objective scheduling problems subjected to special process constraint. Int J Adv Manuf Technol 43:151–160

    Article  Google Scholar 

  23. Gao J (2010) A novel artificial immune system for solving multiobjective scheduling problems subject to special process constraint. Comput Ind Eng 58:602–609

    Article  Google Scholar 

  24. Tavakkoli-Moghaddam R, Taheri F, Bazzazi M, Izadi M, Sassani F (2009) Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints. Comput Oper Res 36(12):3224–3230

    Article  MATH  Google Scholar 

  25. Radhakrishnan S, Ventura JA (2000) Simulated annealing for parallel machine scheduling with earliness/tardiness penalties and sequence-dependent setup times. Int J Prod Res 38(10):2233–2252

    Article  MATH  Google Scholar 

  26. Vickson RG (1980) Two single machine sequencing problems involving controllable job processing times. AIIE Trans 12:258–262

    Article  MathSciNet  Google Scholar 

  27. Nowicki E, Zdrzalka S (1990) A survey of results for sequencing problems with controllable processing times. Discret Appl Math 26:271–287

    Article  MATH  MathSciNet  Google Scholar 

  28. Lee IS (1991) Single machine scheduling with controllable processing times: a parametric study. Int J Prod Econ 22(2):105–110

    Article  Google Scholar 

  29. Liman S, Panwalkar S, Thongmee S (1997) A single machine scheduling problem with common due window and controllable processing times. Ann Oper Res 70:145–154

    Article  MATH  MathSciNet  Google Scholar 

  30. Shabtay D, Steiner G (2007) A survey of scheduling with controllable processing times. Discret Appl Math 155:1643–1666

    Article  MATH  MathSciNet  Google Scholar 

  31. Gurel S, Akturk MS (2007) Scheduling parallel CNC machines with time/cost trade-off considerations. Comput Oper Res 34(9):2774–2789

    Article  MATH  Google Scholar 

  32. Alidaee B, Ahmadian A (1993) Two parallel machine sequencing problems involving controllable job processing times. Eur J Oper Res 70(3):335–341

    Article  MATH  Google Scholar 

  33. Wan, G., 2007. Single machine common due window scheduling with controllable job processing times, combinatorial optimization and applications, A. Dress, Y. Xu, and B. Zhu, Editors. Springer Berlin Heidelberg. pp. 279–290

  34. Shakhlevich N, Strusevich V (2008) Preemptive scheduling on uniform parallel machines with controllable job processing times. Algorithmica 51(4):451–473

    Article  MATH  MathSciNet  Google Scholar 

  35. Shabtay D (2010) Scheduling and due date assignment to minimize earliness, tardiness, holding, due date assignment and batch delivery costs. Int J Prod Econ 123(1):235–242

    Article  Google Scholar 

  36. Aktürk M, Atamtürk A, Gürel S (2010) Parallel machine match-up scheduling with manufacturing cost considerations. J Sched 13(1):95–110

    Article  MATH  MathSciNet  Google Scholar 

  37. Leyvand Y, Shabtay D, Steiner G, Yedidsion L (2010) Just-in-time scheduling with controllable processing times on parallel machines. J Comb Optim 19(3):347–368

    Article  MATH  MathSciNet  Google Scholar 

  38. Yin N, Wang X-Y (2011) Single-machine scheduling with controllable processing times and learning effect. Int J Adv Manuf Technol 54(5–8):743–748

    Article  Google Scholar 

  39. Li K, Shi Y, Yang S, Cheng BY (2011) Parallel machine scheduling problem to minimize the makespan with resource dependent processing times. Appl Soft Comput 11(8):5551–5557

    Article  Google Scholar 

  40. Jansen K, Mastrolilli M (2004) Approximation schemes for parallel machine scheduling problems with controllable processing times. Comput Oper Res 31(10):1565–1581

    Article  MATH  MathSciNet  Google Scholar 

  41. Niu, G., Sun, S., Lafon, P., Zhang, Y., & Wang, J. (2012). Two decompositions for the bicriteria job-shop scheduling problem with discretely controllable processing times. International Journal of Production Research, 50(24):7415–7427

  42. Renna P (2013) Controllable processing time policies for job shop manufacturing system. Int J Adv Manuf Technol 67(9–12):2127–2136

    Article  Google Scholar 

  43. Low C, Li R-K, Wu G-H (2013) Ant colony optimization algorithms for unrelated parallel machine scheduling with controllable processing times and eligibility constraints. Proceedings of the Institute of Industrial Engineers Asian Conference 2013. Springer, Singapore, pp 79–87

    Google Scholar 

  44. Kayvanfar V, Mahdavi I, Komaki GM (2013) Single machine scheduling with controllable processing times to minimize total tardiness and earliness. Comput Ind Eng 65(1):166–175

    Article  Google Scholar 

  45. Kayvanfar V, Mahdavi I, Komaki GM (2013) A drastic hybrid heuristic algorithm to approach to JIT policy considering controllable processing times. Int J Adv Manuf Technol 69:257–267

    Article  Google Scholar 

  46. Kayvanfar V, Komaki GHM, Aalaei A, Zandieh M (2014) Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times. Comput Oper Res 41:31–43

    Article  MathSciNet  Google Scholar 

  47. Pinedo, M., 1995. Scheduling: theory, algorithms, and systems. Englewood Cli (s, NJ: Prentice-Hall

  48. Hillier FS, Lieberman GJ (2001) Introduction to operations research, 7th edn. McGraw-Hill, New York

    Google Scholar 

  49. Anagnostopoulos KP, Mamanis G (2010) A portfolio optimization model with three objectives and discrete variables. Comput Oper Res 37(7):1285–1297

    Article  MATH  MathSciNet  Google Scholar 

  50. Zitzler, E., Laumanns, M., Thiele, L., 2001. SPEA2: Improving the strength Pareto evolutionary algorithm. Technical Report 103, Computer Engineering and Networks Laboratory (TIK), Swiss Federal Institute of Technology (ETH) Zurich, Gloriastrasse 35: CH-8092 Zurich, Switzerland

  51. Horn, J., Nafploitis, N., Goldberg, D.E., 1994. A niched Pareto genetic algorithm for multiobjective optimization. In: Proceeding of the first IEEE Conference on Evolutionary Computation, IEEE Press, pp. 82–87

  52. Deb K, Pratap A, Agarwal S, Meyarivan T (2002) A fast and elitist multi-objective genetic algorithm: NSGA-II. IEEE Trans Evol Comput 6(2):182–197

    Article  Google Scholar 

  53. Al Jadaan O, Rajamani L, Rao CR (2008) Non-dominated ranked genetic algorithm for solving multi-objective optimisation problems: NRGA. J Theor Appl Inf Technol 2:60–67

    Google Scholar 

  54. Coello, C.C., Lamont, G.B., Veldhuizen, D.A., 2007. Evolutionary algorithms for solving multi-objective problems. 2nd ed. Springer

  55. Deb K (2001) Multi objective optimization using evolutionary algorithms. Wiley, Chichester

    MATH  Google Scholar 

  56. Deb, K., Sachin, J., 2004. Running performance metrics for evolutionary multi-objective optimization. Kanpur Genetic Algorithm Laboratory (KanGAL), Report No.2002004

  57. Zitzler, E., 1999. Evolutionary algorithms for multiobjective optimization: methods and applications. Ph.D. dissertation ETH 13398, Swiss Federal Institute of Technology (ETH), Zurich, Switzerland

  58. Schott, J.R., 1995. Fault tolerant design using single and multi-criteria genetic algorithms. Master’s Thesis, Boston MA: Department of Aeronautics and Astronautics, Massachusetts Institute of Technology

  59. Deb K, Agarwal S, Pratap A, Meyarivan T (2000) Technical report 200001, Indian Institute of Technology. Kanpur Genetic Algorithms Laboratory (KanGAL), Kanpur, A fast and elitist multi objective genetic algorithm: NSGA-II

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to M. H. Fazel Zarandi.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Zarandi, M.H.F., Kayvanfar, V. A bi-objective identical parallel machine scheduling problem with controllable processing times: a just-in-time approach. Int J Adv Manuf Technol 77, 545–563 (2015). https://doi.org/10.1007/s00170-014-6461-8

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00170-014-6461-8

Keywords

Navigation