Abstract
Conflicts, claims, and disputes cause cost and schedule overruns in construction projects. Previous research studies have considered contractual risks as one of the main factors affecting the performance of modular construction projects. In fact, modularization requires unique contractual agreements that foster the successful implementation of such construction method. This paper identifies the causes of disputes in modular construction projects. To this end, a multi-step interrelated research methodology was used. First, the authors collected and analyzed 15 actual national case studies reflecting disputes in modular construction projects. Second, social network analysis was conducted where frequency analysis and centrality measures were used to identify the top causes of disputes as well as understand the dispute causation network in modular construction projects. The results showed that the common causes of disputes in modular projects include: (1) delays in work progress, (2) lack of team spirit, and (3) lack of communication. The analysis of the dispute causation network identified the lack of collaborative environment and adequate communication among the project stakeholders as primary contractual risks in modular projects. Ultimately, this paper adds to the body of knowledge by helping practitioners in better understanding the contractual risks that should be addressed to minimize disputes in modular construction projects.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
El-adaway IH, Ali GG, Abotaleb IS, Barber HM Jr (2020) Studying the relationship between stock prices of publicly traded US construction companies and gross domestic product: preliminary step toward construction–economy nexus. J Constr Eng Manage 146(1):04019087
Barbosa F, Woetzel J, Mischke J, Ribeirinho MJ, Sridhar M, Parsons M, Brown S (2017) Reinventing construction: a route to higher productivity. McKinsey Global Institute, New York, USA
Duncheva T, Bradley FF (2019) Multifaceted productivity comparison of off-site timber manufacturing strategies in Mainland Europe and the United Kingdom. J Constr Eng Manage 145(8):04019043
Abdul Nabi M, Ali G, El-adaway IH, Garza LA, Tichy S, Girse J (2021) Contractual guidelines for substantial completion under national design-build standard forms of contract. J Leg Aff Disput Resolut Eng Constr 13(1):04520043
Assaad R, Elsayegh A, Ali G, Abdul Nabi M, El-adaway IH (2020) Back-to-back relationship under standard subcontract agreements: comparative study. J Leg Aff Disput Resolut Eng Constr 12(3):04520020
Jaillon L, Poon CS (2009) The evolution of prefabricated residential building systems in Hong Kong: a review of the public and the private sector. Autom Constr 18(3):239–248
Enshassi MS, Walbridge S, West JS, Haas CT (2019) Integrated risk management framework for tolerance-based mitigation strategy decision support in modular construction projects. J Manag Eng 35(4):05019004
O’Connor JT, O’Brien WJ, Choi JO (2015) Standardization strategy for modular industrial plants. J Constr Eng Manag 141(9):04015026
Nadim W, Goulding JS (2011) Offsite production: a model for building down barriers: a European construction industry perspective. Eng Constr Archit Manag 18(1):82–101
Arashpour M, Abbasi B, Arashpour M, Hosseini MR, Yang R (2017) Integrated management of on-site, coordination and off-site uncertainty: theorizing risk analysis within a hybrid project setting. Int J Project Manage 35(4):647–655
Haas CT, O’Connor JT, Tucker RL, Eickmann JA, Fagerlund WR (2000) Prefabrication and preassembly trends and effects on the construction workforce. Center for Construction Industry Studies, University of Texas at Austin, Austin, TX
Swistun M (2018) Offsite construction—why it is important for the survival of your firm.” https://www.bdcnetwork.com/blog/offsite-construction-why-it%E2%80%99s-important-survival-your-firm. Accessed 14 Feb 2002
Assaad R, El-adaway IH, Hastak M, Needy KL (2020) Commercial and legal considerations of offsite construction projects and their hybrid transactions. J Constr Eng Manag 146(12):05020019
Global Modular Construction Market Research Report (2017) Forecast to 2023: market scenario. https://www.reportbuyer.com/product/5376942/global-modular-construction-market-research-report-forecast-to-2023.html. Accessed 14 Feb 2021
Research and Markets (2020) Modular construction market—growth, trends, and forecast (2020–2025). https://www.researchandmarkets.com/reports/4515000/modular-construction-market-growth-trendsand?utm_source=dynamic&utm_medium=GNOM&utm_code=4j24t6&utm_campaign=1336234+-+Modular+Construction+Market++Global+Forecast+to+2024%3a+Relocatable+Modular+Construction+-+A+Huge+Market+Potential&utm_exec=chdo54gnomd. Accessed 08 Dec 2020
Blismas NG, Pendlebury M, Gibb A, Pasquire C (2005) Constraints to the use of off-site production on construction projects. Archit Eng Des Manage 1(3):153–162
Goodier C, Gibb A (2005) Barriers and opportunities for offsite in the UK. In: ICONDA (International Construction Database). International Council for Building Research, Studies and Documentation (CIB), Delft, The Netherlands
Cakmak PI, Cakmak E (2013) An analysis of causes of disputes in the construction industry using analytical hierarchy process (AHP). AEI 2013: Building Solutions for Architectural Engineering, 94–102
Lee CY, Chong HY, Liao PC, Wang X (2017) Critical review of social network analysis applications in complex project management. J Manag Eng 34(2):04017061
Abdul Nabi M, El-adaway IH (2020) Modular construction: determining decision-making factors and future research needs. J Manag Eng 36(6):04020085
Aljassmi H, Han S, Davis S (2014) Project pathogens network: new approach to analyzing construction-defects-generation mechanisms. J Constr Eng Manage. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000774,04013028
Eteifa SO, El-Adaway IH (2018) Using social network analysis to model the interaction between root causes of fatalities in the construction industry. J Manag Eng 34(1):04017045
Isaac S, Bock T, Stoliar Y (2016) A methodology for the optimal modularization of building design. Autom Constr 65:116–124
Arashpour M, Wakefield R, Blismas N, Minas J (2015) Optimization of process integration and multi-skilled resource utilization in off-site construction. Autom Constr 50:72–80
Yunus R, Yang J (2012) Critical sustainability factors in industrialised building systems. Constr Innov 12(4):447–463
Wong PS, Zwar C, Gharaie E (2017) Examining the drivers and states of organizational change for greater use of prefabrication in construction projects. J. Constr. Eng. Manage. 143(7):04017020
Jaillon L, Poon CS (2010) Design issues of using prefabrication in Hong Kong building construction. Constr Manag Econ 28(10):1025–1042
O’Connor JT, O’Brien WJ, Choi JO (2014) Critical success factors and enablers for optimum and maximum industrial modularization. J Constr Eng Manag 140(6):04014012
Hamzeh F, Abdul Ghani O, Saleh Bacha MB, Abbas Y (2017) Modular concrete construction: the differing perspectives of designers, manufacturers, and contractors in Lebanon. Eng Constr Archit Manag 24(6):935–949
Choi JO, O’Connor JT, Kwak YH, Shrestha BK (2019) Modularization business case analysis model for industrial projects. J Manag Eng 35(3):04019004
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2023 Canadian Society for Civil Engineering
About this paper
Cite this paper
Abdul Nabi, M., El-adaway, I.H. (2023). Analyzing the Causes of Conflicts and Disputes in Modular Construction Projects. In: Walbridge, S., et al. Proceedings of the Canadian Society of Civil Engineering Annual Conference 2021 . CSCE 2021. Lecture Notes in Civil Engineering, vol 251. Springer, Singapore. https://doi.org/10.1007/978-981-19-1029-6_41
Download citation
DOI: https://doi.org/10.1007/978-981-19-1029-6_41
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-19-1028-9
Online ISBN: 978-981-19-1029-6
eBook Packages: EngineeringEngineering (R0)