Abstract
This chapter presents a case study of evaluation and improvisation of Overall Equipment Effectiveness for the machines like CNC Laser Cutting and CNC Panel Bender present in a small-scale industry involved in the fabrication of steel furniture. The calculations and analysis of Overall Equipment Effectiveness for the machines are carried out by measuring the time required for various steps involved during the manufacturing of the parts and also through conversation, interrogation and observations over a period of one week. After the current status of Overall Equipment Effectiveness is known, the lean tools and techniques like Root cause analysis, Six Big Losses, Kaizen and Single Minute Exchange of Die was used. The Kaizen team was formed and was led for four days. Also, the suggestions were implemented with the assistance of the Kaizen team. After the implementation of the tools and techniques again Overall Equipment Effectiveness was calculated and it was found to have improved. Later, the scheduling of the CNC Laser Cutting and CNC Panel Bender was also carried out with the assistance of scheduling software “LEKIN” for further improvement of Overall Equipment Effectiveness.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Narses, A.: Case study: production and OEE improvement for an 800 tons stamping press. M.Tech thesis. Malardalen University. Sweden (2013)
Nayak, E.A., Vijaya Kumar, M., Naidu, G.S., Shankar, V.: Evaluation of OEE in a continuous process industry on an installation line in a cable manufacturing unit. Int. J. Innov. Res. Sci. Eng. Technol. 2, 1629–1634 (2013)
Mhetre, R.S., Dhake, R.J.: TPM review in a sheet metal part manufacturing company. Int. J. Mech. Indus. Eng. (IJMIE) 1, 38–43 (2012)
Shettar, M., Hiremath, P., Nikhil, R., Chauhan, V.R.: KAIZEN—a case study. Int. J. Eng. Res. Appl. 5(2), 101–103 (2015)
Gabahne, L.D., Gupta, M.M., Zanwar, D.R.: Overall equipment effectiveness improvement: a case of injection molding machine. Int. J. Eng. Sci. (IJES) 3, 1–10 (2014)
Sahu, L.K., Sridhar, K.: Shifting bottleneck algorithm for job shop scheduling program. Int. J. Sci. Eng. Appl. Sci. (IJSEAS) 2, 215–219 (2015)
Martomo, Z.I., Laksono, P.W.: Analysis of total productive maintenance (TPM) implementation using overall equipment effectiveness (OEE) and six big losses: a case study. In: 3rd International Conference on Industrial, Mechanical, Electrical, and Chemical Engineering, Indonesia, pp. 030026.1–030026.6 (2017)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2021 Springer Nature Singapore Pte Ltd.
About this paper
Cite this paper
Borkar, A.M., Andhare, A.B. (2021). Evaluation and Improvisation of Overall Equipment Effectiveness in a Sheet Metal Parts Manufacturing Industry. In: Sachdeva, A., Kumar, P., Yadav, O., Garg, R., Gupta, A. (eds) Operations Management and Systems Engineering . Lecture Notes on Multidisciplinary Industrial Engineering. Springer, Singapore. https://doi.org/10.1007/978-981-15-6017-0_14
Download citation
DOI: https://doi.org/10.1007/978-981-15-6017-0_14
Published:
Publisher Name: Springer, Singapore
Print ISBN: 978-981-15-6016-3
Online ISBN: 978-981-15-6017-0
eBook Packages: EngineeringEngineering (R0)