Abstract
In this study the comparative analysis of various reliability measures of a computer system is carried out under the concepts of maximum repair time, maximum operation time, and priority. An immediate repair facility is provided to the system. The system consists of two identical unit one in operative mode and other in cold standby mode. For the derivation of various reliability measures, two stochastic models are developed hereby using the concept of priority. Priority to preventive maintenance over h/w repair in Model II whereas no priority is given in Model I. The failure time distribution of the s/w and h/w follows exponential while other random variables are taken as arbitrary. Graphs are drawn with respect to preventive maintenance to analyze the mean time to system failure and profit function of both models comparatively.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Friedman, M.A., Tran, P.: Reliability techniques for combined hardware/software systems. In: Proceedings of Annual Reliability and Maintainability Symposium, pp. 290–293 (1992)
Welke, S.R., Labib, S.W., Ahmed, A.M.: Reliability modeling of hardware/software system. IEEE Trans. Reliab. 44(3), 413–418 (1995)
Malik, S.C., Anand, J.: Reliability and economic analysis of a computer system with independent hardware and software failures. Bull. Pure Appl. Sci. (Math. Stat.) 29 E (1), 141–153 (2010)
Malik, S.C., Kumar, A.: Profit analysis of a computer system with priority to software replacement over hardware repair subject to maximum operation and repair times. Int. J. Eng. Sci. Technol. 3(10), 7452–7468 (2011)
Malik, S.C., Nandal, P.: Cost-analysis of stochastic models with priority to repair over preventive maintenance subject to maximum operation time, Edited Book. In: Learning Manual on Modeling, Optimization and Their Applications, pp. 165–178. Excel India Publishers (2010)
Kumar, A., Malik, S.C., Barak, M.S.: Reliability modeling of a computer system with independent H/W and S/W failures subject to maximum operation and repair times. Int. J. Math. Achieves 3(7), 2622–2630 (2012)
Kumar, A., Malik, S.C.: Stochastic modeling of a computer system with priority to PM over S/W replacement subject to maximum operation and repair times. Int. J. Comput. Appl. 43(3), 27–34 (2012)
Malik, S.C., Anand, J.: Analysis of a computer system with arbitrary distribution for h/w and s/w replacement time and priority to repair activities of h/w over replacement of the s/w. Int. J. Syst. Assur. Engg. Manage. 3(3), 230–236 (2012)
Nandal, J., Sureria, J.K., Malik, S.C.: Reliability measures of a cold standby system with priority for operation and preventive maintenance. Int. J. Math. Archives. 4(3), 84–91 (2013)
Malik, S.C.: Reliability modeling of a computer system with preventive maintenance and priority subject to maximum operation and repair times. Int. J. Syst. Assur. Engg. Manage. 4(1), 94–100 (2013)
Kumar, A.: Comparison of performance measures of an integrated H/w and S/w systems under priority and preventive maintenance. Elixir Stat. 80, 31289–31300 (2015)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2016 Springer India
About this paper
Cite this paper
Ashish Kumar, Monika Saini (2016). Comparison of Various Reliability Measures of a Computer System with the Provision of Priority. In: Afzalpulkar, N., Srivastava, V., Singh, G., Bhatnagar, D. (eds) Proceedings of the International Conference on Recent Cognizance in Wireless Communication & Image Processing. Springer, New Delhi. https://doi.org/10.1007/978-81-322-2638-3_5
Download citation
DOI: https://doi.org/10.1007/978-81-322-2638-3_5
Published:
Publisher Name: Springer, New Delhi
Print ISBN: 978-81-322-2636-9
Online ISBN: 978-81-322-2638-3
eBook Packages: EngineeringEngineering (R0)