Skip to main content

Analytical Estimation and Experimental Validation of Acceleration at Spacecraft Solar Array Latch-up Considering Differential Latching

  • Conference paper
  • First Online:
ICoRD’15 – Research into Design Across Boundaries Volume 2

Part of the book series: Smart Innovation, Systems and Technologies ((SIST,volume 35))

  • 1400 Accesses

Abstract

Solar array deployment on-board a spacecraft is a mission critical activity. The torque margin over friction torque in the deployment hinge mechanism is an important parameter that ensures positive deployment. Higher torque margin results in higher latch-up moment that affects the design of panel substrates and hinges. Latch-up moment estimated earlier assumes simultaneous latching of hinges. However, in reality, hinges latch at different instants of time due to the presence of closed control loops which has been confirmed by on-orbit observations. The latch-up sequence of the panels influences the distribution of latch-up moments induced at the hinges. In this paper, a mathematical model for a solar array with a yoke two panel configuration is developed using ADAMS software which considers differential latching of hinges. The mathematical model includes the influence of panel flexibility, close control loops, harness, snubbers, ejectors and air drag. The acceleration and moment at latch-up are estimated as a function of time. Deployment time and acceleration at latch-up dictate the magnitude of latch-up moment at hinges and have been compared with experimental value obtained from accelerometer mounted on the outermost panel, during ground deployment test. The novelty in the present work is the formulation of a test validated methodology to analyse the deployment dynamics of a multi-panel solar array considering differential latching which has the potential to simulate the latching of solar array more accurately compared to previously adopted methods. It will be useful in carrying out deployment dynamics of futuristic solar arrays with larger number of panels.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 169.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 219.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 219.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Nataraju, B.S., Vidyasagar, A.: Deployment dynamics of accordian type solar array considering flexibility of closed control loops. In: 38th Congress of International Astronautical Federation, Brighton, UK (1987)

    Google Scholar 

  2. Nataraju, B.S., Chinnasamy, R., Krishnamurthy, T.S., Bonde, D.H.: Modelling of deployment mechanisms for latchup shock. ESA J 13, 393–400 (1989)

    Google Scholar 

  3. Nagaraj, B.P., Nataraju, B.S., Ghosal, A.: Dynamics of a two link flexible system under going locking: mathematical modeling and comparison with experiments. J. Sound Vib. 207(4), 567–589 (1997)

    Google Scholar 

  4. Balaji, K., Nataraju, B.S., Suresha kumar, H.N.: Matrix approach to deployment dynamics of an n panel solar array. Proc. Inst. Mech. Eng. K J. Multi-body Dyn. 217, 15–27 (2003)

    Google Scholar 

  5. Nagaraj, B.P., Nataraju, B.S., Ghosal, A.: Energy transfer during locking of deployable flexible links. J. Spacecraft Technol. 13(2), 19–32 (2003)

    Google Scholar 

  6. de Faria, A.R., Cardozo, L., Fonseca, I.M.: Brazilian multimission platform solar array generator deployment. In: 55th International Astronautical Congress 2004, Vancouver, Canada

    Google Scholar 

  7. Na, K.S., Kim, J.H.: Deployment of multi link flexible structures. J. Sound Vib. 294(1–2), 298–313 (2006)

    Google Scholar 

  8. ADAMS Users’ Guide, Version 10 (2010)

    Google Scholar 

Download references

Acknowledgments

The authors would like to thank Group Director, Spacecraft Mechanisms Group, Deputy Director, Mechanical Systems Area and Director, ISAC for their support and encouragement. The authors wish to thank colleagues from Spacecraft Mechanisms Group, Structures Group and Environmental Test Facility, for providing guidance and support for carrying out the experiment.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to B. Lakshmi Narayana .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2015 Springer India

About this paper

Cite this paper

Lakshmi Narayana, B., Sharma, G., Nagesh, G., Sridhara, C.D., Ranganath, R. (2015). Analytical Estimation and Experimental Validation of Acceleration at Spacecraft Solar Array Latch-up Considering Differential Latching. In: Chakrabarti, A. (eds) ICoRD’15 – Research into Design Across Boundaries Volume 2. Smart Innovation, Systems and Technologies, vol 35. Springer, New Delhi. https://doi.org/10.1007/978-81-322-2229-3_2

Download citation

  • DOI: https://doi.org/10.1007/978-81-322-2229-3_2

  • Published:

  • Publisher Name: Springer, New Delhi

  • Print ISBN: 978-81-322-2228-6

  • Online ISBN: 978-81-322-2229-3

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics