Abstract
Production scheduling optimization is one of the main issues that have a significant effect on the mine economics. Production scheduling optimization in underground mines, has received less attention than in surface mines, and it is still a manual process and in most cases, achieving the truly optimal result through manual scheduling is impossible due to the complexity of the scheduling problem. Caving methods compared with other underground mining methods are low-cost methods and have high production rates. Sublevel caving is one of the main underground mining methods for hard rock mining and there are limited studies about its long-term production scheduling. In this paper, an integer linear programming (IP) model with the objective of net present value (NPV) maximization is developed for production scheduling that is suited for sublevel caving method. The model contains acceptable technical and operational constraints. This model is formulated two-dimensionally (2D) and it can optimize production schedule in thin-layer deposits. In this research, MATLAB programming platform was used to capture the IP model framework. The model was applied on a real block model and the maximum NPV is determined. With respect to determining maximum NPV, it is recommended that the mine development should be determined based on the optimal mining sequence.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Ataee-pour, M.: A critical survey of the existing stope layout optimization techniques. J. Min. Sci. 41(5), 447–466 (2005)
Bai, X., Marcotte, D., Simon, R.: A heuristic sublevel stope optimizer with multiple raises. J. Southern African Inst. Mining Metall. 114, 427–434 (2014)
Alford, C.: Optimization in underground mine design. APCOM 25, 213–218 (1995)
Shenavar, M., Ataee-pour, M., Rahmanpour, M.: Evaluating mineable reserve in presence of grade uncertainty using floating stope optimizer in underground mines. In: 6th International Conference on Computer Applications in the Minerals Industries (CAMI), Turkey (2016)
Pourrahimian, Y.: Mathematical programming for sequence optimization in block cave mining. Doctor of Philosophy Thesis, Department of Civil and Environmental Engineering, Edmonton, Alberta (2013)
Williams, J.K., Smith, L., Wells, P.M.: Planning of underground copper mining. In: 10th International Application Symposium on the Application of Computer in the Mineral Industrial (APCOM), Johannesburg, South Africa, pp. 251–254 (1973)
Gillenwater, E.L.: An integrated model for production planning and scheduling in underground coal mining. Doctor of Business dissertation, University of Kentucky (1988)
Subhash, C., Sarin, J., Hansen W.: The long-term mine production scheduling problem. J. IIE Trans. 37(2) (2005)
Chanda, E.K.C.: An application of integer programming and simulation to production planning for a strati form ore body. Mining Sci. Tech. 11(2), 165–172 (1990)
Jawed, M.: Optimal production planning in underground coal mines through goal programming: a case study from an Indian mine. In: Elbrond, J., Tang, X., (eds.) Proceeding of 24th International Application of Computer and Operation Research in the Mineral Industry, (APCOM) Symposium, CIM, Montréal, pp. 44–50 (1993)
Winkler, B.: System for quality oriented mine production planning with MOLP. In: Proceeding of 27th International Application of Computer and Operation Research in the Mineral Industry, (APCOM) Symposium, Royal School of Mines, London, pp. 53–59 (1998)
Topal, E.: Advanced underground mine scheduling using mixed integer programming. Ph.D. thesis, Colorado School of Mines, Colorado (2003)
Rahal, D., Smith, M., Van G., Hout, A., Johannides, V.: The use of mixed integer linear programming for long-term scheduling in block caving mines. In: Camisani-Calzolari, F. (ed.) Proceeding of 31st International Application of Computer and Operation Research in the Mineral Industry, (APCOM) Symposium, SAIMM, Cape Town, South Africa, pp. 123–131 (2003)
Rubio, E., Diering, E.: Block cave production planning using operation research tools. In: Karzulovic, A., Alfaro, M. (eds.) Proceeding of MassMines in Chile, pp. 141–149 (2004)
Kuchta, M., Newman, A., Topal, E.: Implementing a production schedule at LKAB’s Kiruna Mine. Interfaces 34(2), 124–134 (2004)
Newman, A., Kuchta, M.: Using aggregation to optimize long-term production planning at an underground mine. Eur. J. Oper. Res. 176(2), 1205–1218 (2007)
Carlyle, W.M., Eaves, B.C.: Underground planning at stillwater mining company. Interfaces 31(4), 50–60 (2001)
McIsaac, G.: Long-term planning of an underground mine using mixed-integer linear programming. CIM Bull. 98(1089), 1–6 (2005)
Fava, L., Saavedra-Rosas, J., Tough, V., Haarala, P.: Heuristic optimization of scheduling scenarios for achieving strategic mine planning targets. In: The 23rd World Mining Congress, Canada (2013)
O’Sullivan, D., Newman, A.: Optimization-based heuristics for underground mine scheduling. Eur. J. Oper. Res. 241(1), 248–259 (2015)
Magda, R.: Mathematical model for estimating the economic effectiveness of production process in coal panels and an example of its practical application. Internat. J. Prod. Econom. 34(1), 47–55 (1994)
Whitchurch, K., Cram, A.A., Ozawa, N., Koizumf, K.: Underground and open-cut coal scheduling using expert systems. In: 26th APCOM Proceedings, pp. 339–346 (1996)
Epstein, R., Gaete, S., Caro, F., Weintraub, A., Santibañez, P., Catalan, J.: Optimizing long term planning for underground copper mines. In: Proceeding of Copper 2003-Cobre 2003, 5th International Conference, Santiago, Chile, CIM and the Chilean Institute of Mining, vol. 1, pp. 265–279 (2003)
Schulze, M., Zimmermann, J.: Scheduling in the context of underground mining. In: Operations Research Proceedings (2010)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2019 Springer Nature Switzerland AG
About this paper
Cite this paper
Shenavar, M., Ataee-pour, M., Rahmanpour, M. (2019). Production Scheduling in Sublevel Caving Method with the Objective of NPV Maximization. In: Widzyk-Capehart, E., Hekmat, A., Singhal, R. (eds) Proceedings of the 27th International Symposium on Mine Planning and Equipment Selection - MPES 2018. Springer, Cham. https://doi.org/10.1007/978-3-319-99220-4_12
Download citation
DOI: https://doi.org/10.1007/978-3-319-99220-4_12
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-99219-8
Online ISBN: 978-3-319-99220-4
eBook Packages: Earth and Environmental ScienceEarth and Environmental Science (R0)