Abstract
In this work we consider a scheduling problem in an assembly area composed of several machines of various characteristics and used to resist welding different parts using specific tools.
The area is equipped with a monitoring interface installed on remote computer representing in real time the state of the machines, the progress data of the schedule are extracted from this application.
The problem consists in optimizing the efficiency of the zone by minimizing the time of the logistic shutdown (change of tools, overproduction processing time, disruptions due to stock shortages…)
The results will be illustrated through an application (case study) carried out on this area.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
MARTIN, Alain and Chantal BONNEFOUS,Gestion de la production, Chapitre 9 - «La gestion d’atelier par les contraintes», 5th edn. (2011)
Prins, C., Sevaux, M.: Programmation linéaire avec Excel: 55 problèmes d’optimisation modélisés pas à pas et résolus avec Excel, chapitre 13 - Emplois du temps et gestion de personnel, pp. 215–350, 3 Mars 2011
Huq, F., Cutright, K., Martin, C.: Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study. Omega 32(2), 121–129 (2004)
Yalaoui, F.: Optimisation et gestion de la production: problème de conception et problème d’ordonnancement. Habilitation à diriger les recherches, Université de Technologie de Compiègne (2006)
Lalande, J.F.: Equilibrage des lignes de montage, Rapport de Stage ISIMA (2000)
Amen, M.: An exact method for cost-oriented assembly line balancing. Int. J. Prod. Econ. 64, 187–195 (2000)
Som, H.: Modèle Mathématique pour le problème de l’Équilibrage de la Charge sur une ligne de Production, Rapport de projet CUST (2001)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2018 Springer International Publishing AG
About this paper
Cite this paper
Yassine, E.F., Mustapha, O., Abdelaziz, B.F., Abdessamad, B. (2018). Improvement of Scheduling, Assignment of Tools on Assembly Machines Connected to a Supervision Interface. In: Ben Ahmed, M., Boudhir, A. (eds) Innovations in Smart Cities and Applications. SCAMS 2017. Lecture Notes in Networks and Systems, vol 37. Springer, Cham. https://doi.org/10.1007/978-3-319-74500-8_78
Download citation
DOI: https://doi.org/10.1007/978-3-319-74500-8_78
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-74499-5
Online ISBN: 978-3-319-74500-8
eBook Packages: EngineeringEngineering (R0)