Chaâbane and Co Tunisian company has been contracted by “El Jihez Iskene and El Marafek Libya” to achieve 2,000 villa’s in Ghadames and Derj (Nalout). The agreed implementation period was 30 months. This project covers an area of approximately 260 ha. The extent important project and the remarkable number of housing building and the diversity of construction activities (Reinforced concrete foundation, reinforced concrete in elevation, masonry, cladding, etc.) deserve the establishment of an efficient management of work through the control of the fixed time and the reserved budget. To do so, a process of planning, organization and management as well the affected resources must be put in place. This process is to break down the project managing in simple tasks or activities, to provide forecasts for these tasks and then to monitor their progress. The conventional planning tools (Primavera, Msproject, …), generally adapted by project managers, allow a representation in time of the tasks to be performed, specifying the executions’ duration and conditions of each one. However, this representation does not allow a spatial or geographic monitoring of the performed tasks within the scope of project intervention. From then, the application of Geographic Information System (GIS) complements the above monitoring tools for civil engineering projects occupying large areas on the one hand and having different types of scattered structures on the other. In fact, GIS can identify the collected data on task progress, can structure and present them in maps form in order to graphically and geographically visualize the overall progress and to conveniently extract useful summaries to the decision making.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Notes
- 1.
MERISE: A method for analyzing information. It’s a software method for the construction of an information system using the Model Entity/Relation.
References
Naik, G.M., et al.: GIS based 4D model development for planning and scheduling of a construction project common structural and construction deficiencies of Nepalese. Int. J. Innov. Manag. Technol. 2, 447 (2011)
Oloufa, A.R., et al.: Integrated GIS for construction site investigation. J. Constr. Eng. Manag. 120(1), 211–222 (1994)
Rajesh, K., et al.: 4D model through GIS for planning and scheduling of residential construction projects. Res. J. Appl. Sci. 7(4), 222–228 (2012)
Zhang, J.P., et al.: 4D visualization of construction site management. In: Proceedings of 5th International Conference Information Visualisation, pp. 382–387 (2001)
Acknowledgments
This work is undertaken as part of an applied research project funded by the Chaabane and Co Company. Helps, have been supplied by the executive team of the later, and are gratefully acknowledged.
The authors would also like to acknowledge the review of Mouna Zaabar Touil whose comments were great help and improved the quality of this paper.
Permission to publish has been granted by the Head Chief Manager of the Chaabane Company.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2018 Springer International Publishing AG
About this paper
Cite this paper
Medhioub, S., Baklouti, M., Bouraoui, S. (2018). Applied GIS to the Monitoring of Building Work Case Study: Construction of 2000 Houses in Ghadames-Lybia. In: Shehata, H., Rashed, Y. (eds) Numerical Analysis of Nonlinear Coupled Problems. GeoMEast 2017. Sustainable Civil Infrastructures. Springer, Cham. https://doi.org/10.1007/978-3-319-61905-7_3
Download citation
DOI: https://doi.org/10.1007/978-3-319-61905-7_3
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-61904-0
Online ISBN: 978-3-319-61905-7
eBook Packages: Earth and Environmental ScienceEarth and Environmental Science (R0)