Skip to main content

Ship Stability Considerations in the Quay Crane Scheduling Problem

  • Chapter
  • First Online:
Modeling, Computing and Data Handling Methodologies for Maritime Transportation

Part of the book series: Intelligent Systems Reference Library ((ISRL,volume 131))

  • 903 Accesses

Abstract

The aim of this paper is to present the recent literature that has advanced in the field of maritime logistics, specifically with regards to the consideration of vessel stability during the process of unloading and/or loading containers onto vessels. This process is essentially known as the Quay Crane Scheduling Problem (QCSP) which determines the operational profile of each quay crane in terms of the container tasks and timing. The literature on this and other problems pertaining to quayside operational planning is presented, before introducing the works with a contribution in ship stability. The works are described with insights into their formulation and solution techniques, as well as their contribution to the literature. Most importantly, the results are discussed and directions are provided for future work in the area.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 149.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 199.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 199.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Al Hammadi, J., Diabat, A.: An integrated berth allocation and yard assignment problem for bulk ports: formulation and case study. RAIRO Oper. Res. (2017) (in press)

    Google Scholar 

  2. Al-Dhaheri, N., Diabat, A.: The quay crane scheduling problem. J. Manuf. Syst. 36, 87–94 (2015)

    Google Scholar 

  3. Al-Dhaheri, N., Diabat, A.: A Lagrangian-relaxation-based heuristic for the multiship quay crane scheduling problem with ship stability constraints. Ann. Oper. Res. (2016)

    Google Scholar 

  4. Al-Dhaheri, N., Jebali, A., Diabat, A.: A simulation based Genetic Algorithm approach for the quay crane scheduling under uncertainty. Simul. Model. Pract. Theory 66, 122–138 (2016a)

    Google Scholar 

  5. Al-Dhaheri, N., Jebali, A., Diabat, A.: The quay crane scheduling problem with nonzero crane repositioning time and vessel stability constraints. Comput. Ind. Eng. 94, 230–244 (2016b)

    Google Scholar 

  6. Alzaabi, S., Diabat, A.: On the berth allocation problem. RAIRO Oper. Res. 50(3), 491–501 (2016)

    Google Scholar 

  7. Arango, C., Corts, P., Onieva, L., Escudero, A.: Simulation-optimization models for the dynamic berth allocation problem. Comput. Aided Civil Infrastruct. Eng. 28(10), 769–779 (2013)

    Google Scholar 

  8. Diabat, A., Theodorou, E.: An integrated quay crane assignment and scheduling problem. Comput. Ind. Eng. 73, 115–123 (2014)

    Google Scholar 

  9. Fu, YM., Diabat, A.: A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem. Appl. Math. Model. 39(3–4), 1194–1201 (2015)

    Google Scholar 

  10. Fu, YM., Diabat, A., Tsai, IT.: A multi-vessel quay crane assignment and scheduling problem: formulation and heuristic solution approach. Expert Syst. Appl. 41(15), 6959–6965 (2014)

    Google Scholar 

  11. Imai, A., Nishimura, E., Papadimitriou, S.: Berth allocation with service priority. Transp. Res. Part B: Methodol. 37(5), 437–457 (2003)

    Google Scholar 

  12. Kenan, N., Diabat, A.: A branch-and-price algorithm to solve a quay crane scheduling problem. Proc. Comput. Sci. 61, 527–532 (2015)

    Google Scholar 

  13. Kim, K.H., Park, Y.M.: A crane scheduling method for port container terminals. Eur. J. Oper. Res. 156(3), 752–768 (2004)

    Google Scholar 

  14. Liang, C., Huang, Y., Yang, Y.: A quay crane dynamic scheduling problem by hybrid evolutionary algorithm for berth allocation planning. Comput. Ind. Eng. 56(3), 1021–1028 (2009)

    Google Scholar 

  15. Lu, Z., Han, X., Xi, L.: Simultaneous berth and quay crane allocation problem in container terminal. Adv. Sci. Lett. 4(6–7), 2113–2118 (2011)

    Google Scholar 

  16. Meisel, F.: The quay crane scheduling problem with time windows. Naval Res. Logist. (NRL) 53(1), 45–59

    Google Scholar 

  17. Moccia, L., Cordeau, JF., Gaudioso, M., Laporte, G.: A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal. Naval Res. Logist. 53(1), 45–59 (2006)

    Google Scholar 

  18. Sammarra, M., Cordeau, JF., Laporte, G., Monaco, MF.: A Tabu search heuristic for the quay crane scheduling problem. J. Sched. 10(4–5), 327–336 (2007)

    Google Scholar 

  19. Schoonenberg, W., Hols, J., Diabat, A.: A cost based approach for a crane assignment and scheduling problem. In: International Conference on Industrial Engineering and Systems Management (IESM), 21–23 Oct 2015, Seville, Spain

    Google Scholar 

  20. Simrin, A., Diabat, A.: The dynamic berth allocation problem: a linearized formulation. RAIRO Oper. Res. 49(3), 473–494 (2015)

    Google Scholar 

  21. Simrin, A.S., Alkawaleet, N.N., Diabat, A.H.: A Lagrangian relaxation based Heuristic for the static berth allocation problem using the cutting plane method. In: Proceedings of the 15th International Conference on Enterprise Information Systems, pp. 565–569 (2013)

    Google Scholar 

  22. Theodorou, E., Diabat, A.: A joint quay crane assignment and scheduling problem: Formulation, solution algorithm and computational results. Optim. Lett. 9, 799–817 (2015)

    Google Scholar 

  23. Vo, S., Stahlbock, R., Steenken, D.: Container terminal operation and operations research—a classification and literature review. OR Spectrum 26(1), 3–49 (2004)

    Google Scholar 

  24. Wang, J., Hu, H., Song, Y.: Optimization of quay crane scheduling constrained by stability of vessels. Transp. Res. Rec.: J. Transp. Res. Board 2330(1), 47–54 (2013)

    Google Scholar 

  25. Zeng, Q., Diabat, A., Zhang, Q.: A simulation optimization approach for solving the dual-cycling problem in container terminals. Marit. Policy Manag. 42(8), 87–94 (2015)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Noura Al-Dhaheri .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer International Publishing AG

About this chapter

Cite this chapter

Al-Dhaheri, N. (2018). Ship Stability Considerations in the Quay Crane Scheduling Problem. In: Konstantopoulos, C., Pantziou, G. (eds) Modeling, Computing and Data Handling Methodologies for Maritime Transportation. Intelligent Systems Reference Library, vol 131. Springer, Cham. https://doi.org/10.1007/978-3-319-61801-2_2

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-61801-2_2

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-61800-5

  • Online ISBN: 978-3-319-61801-2

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics