Abstract
The growing globalization and the rapid technical development intensify competition for nearly all manufacturing companies and increase the pressure to act. For companies using tooling machines to process metal, there is only little potential to improve the processing itself. A holistic view on the production system, however, provides an opportunity for cost savings and optimization. Therefore a two-level concept for lot sizing and scheduling is presented, transferring two different lot sizing and scheduling models from the literature into an integrated one. Each of the two models has a different time scope and an adjusted level of detail. The solution behavior and solution quality is analyzed for different test instances, and the advantages and disadvantages of such a two-level concept are pointed out.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Belvaux, G., Wolsey, L.A.: bc-prod: a specialized Branch-and-Cut system for Lot-Sizing problems. Manage. Sci. 46(5), 724–738 (2000)
Buschkühl, L., Sahling, F., Helber, S., Tempelmeier, H.: Dynamic capacitated lot-sizing problems: a classification and review of solution approaches. OR Spect. 32(2), 231–261 (2010)
Copil, K., Wörbelauer, M., Meyr, H., Tempelmeier, H.: Simultaneous lotsizing and scheduling problems: a classification and review of models. OR Spect. (2016). doi:10.1007/s00291-015-0429-4
Dangelmaier, W.: A concept for an accurate and closely coordinated production. In: Dangelmaier, W., Blecken, A., Delius, R., Klöpfer, S. (eds.) Advanced Manufacturing and Sustainable Logistics. Springer, Berlin (2010)
De Araujo, S.A., Arenales, M.N., Clark, A.R.: Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups. J. Heuristics 13(4), 337–358 (2007)
Kimms, A., Drexl, A.: Proportional lot sizing and scheduling: some extensions. Networks 32(2), 85–101 (1998)
Özdamar, L., Barbarosoǧlu, G.: Hybrid heuristics for the multi-stage capacitated lot sizing and loading problem. J. Oper. Res. Soc. 50(8), 810–825 (1999)
Stadtler, H., Sahling, F.: A lot-sizing and scheduling model for multi-stage flow lines with zero lead times. Eur. J. Oper. Res. 225(3), 404–419 (2013)
Acknowledgements
This work is supported by the German Federal Ministry of Education and Research as part of the Spitzencluster “its OWL”.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2018 Springer International Publishing AG
About this paper
Cite this paper
Isenberg, F., Suhl, L. (2018). Lot Sizing and Scheduling for Companies with Tooling Machines. In: Fink, A., Fügenschuh, A., Geiger, M. (eds) Operations Research Proceedings 2016. Operations Research Proceedings. Springer, Cham. https://doi.org/10.1007/978-3-319-55702-1_64
Download citation
DOI: https://doi.org/10.1007/978-3-319-55702-1_64
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-55701-4
Online ISBN: 978-3-319-55702-1
eBook Packages: Business and ManagementBusiness and Management (R0)