Skip to main content

Improved Compact Models for the Resource-Constrained Project Scheduling Problem

  • Conference paper
  • First Online:
Operations Research Proceedings 2016

Part of the book series: Operations Research Proceedings ((ORP))

Abstract

In this article, we study compact Mixed-Integer Programming (MIP) models for the Resource-Constrained Project Scheduling Problem (RCPSP). Compared to the classical time-indexed formulation, the size of compact models is strongly polynomial in the number of jobs. In addition to two compact models from the literature, we propose a new compact model. We can show that all three compact models are equivalent by successive linear transformations. For their LP-relaxations, however, we state a full inclusion hierarchy where our new model dominates the previous models in terms of polyhedral strength. Moreover, we reveal a polyhedral relationship to the common time-indexed model. Furthermore, a general class of valid cutting planes for the compact models is introduced and finally all models are evaluated by computational experiments.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  1. Artigues, C., Michelon, P., Reusser, S.: Insertion techniques for static and dynamic resource-constrained project scheduling. Eur. J. Oper. Res. 149(2), 249–267 (2003)

    Article  Google Scholar 

  2. Brucker, P., Knust, S.: Lower bounds for resource-constrained project scheduling problems. Eur. J. Oper. Res. 149(2), 302–313 (2003)

    Article  Google Scholar 

  3. Carlier, J., Néron, E.: On linear lower bounds for the resource constrained project scheduling problem. Eur. J. Oper. Res. 149(2), 314–324 (2003)

    Article  Google Scholar 

  4. Cavalcante, C.C., De Souza, C.C., Savelsbergh, M.W., Wang, Y., Wolsey, L.A.: Scheduling projects with labor constraints. Discrete Appl. Math. 112(1), 27–52 (2001)

    Article  Google Scholar 

  5. Christofides, N., Alvarez-Valdés, R., Tamarit, J.M.: Project scheduling with resource constraints: a branch and bound approach. Eur. J. Oper. Res. 29(3), 262–273 (1987)

    Article  Google Scholar 

  6. Haouari, M., Kooli, A., Néron, E., Carlier, J.: A preemptive bound for the resource constrained project scheduling problem. J. Scheduling 17(3), 237–248 (2014)

    Article  Google Scholar 

  7. Kolisch, R., Sprecher, A.: PSPLIB-a project scheduling problem library: OR software-ORSEP operations research software exchange program. Eur. J. Oper. Res. 96(1), 205–216 (1997)

    Article  Google Scholar 

  8. Koné, O., Artigues, C., Lopez, P., Mongeau, M.: Event-based MILP models for resource-constrained project scheduling problems. Comput. Oper. Res. 38(1), 3–13 (2011)

    Article  Google Scholar 

  9. Möhring, R.H., Schulz, A.S., Stork, F., Uetz, M.: Solving project scheduling problems by minimum cut computations. Manage. Sci. 49(3), 330–350 (2003)

    Article  Google Scholar 

  10. Pritsker, A.A.B., Waiters, L.J., Wolfe, P.M.: Multiproject scheduling with limited resources: a zero-one programming approach. Manage. Sci. 16(1), 93–108 (1969)

    Article  Google Scholar 

  11. Schrijver, A.: Combinatorial Optimization, vol. A (2003)

    Google Scholar 

  12. Tesch, A.: Compact MIP models for the resource-constrained project scheduling problem. Master’s Thesis, TU-Berlin (2015)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Alexander Tesch .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer International Publishing AG

About this paper

Cite this paper

Tesch, A. (2018). Improved Compact Models for the Resource-Constrained Project Scheduling Problem. In: Fink, A., Fügenschuh, A., Geiger, M. (eds) Operations Research Proceedings 2016. Operations Research Proceedings. Springer, Cham. https://doi.org/10.1007/978-3-319-55702-1_4

Download citation

Publish with us

Policies and ethics