Abstract
As the economic growth of China gradually slows down in recent years, the flow-shop production enterprises pay more and more attention to the production capacity planning problem. The order selection problem plays a central role in the production capacity planning of flow-shop production enterprises. Traditional order selection models separate the processes of production scheduling and order selection. The performance of the order selection depends entirely on production scheduling. In this paper we study the relationship between the processes of order selection and production scheduling, and propose a new nonlinear 0–1 programming model aiming at profit maximization. Our new model considers simultaneously order selection and production scheduling and we will demonstrate that our new model generates a production schedule that is much better than that from traditional models. We solved the new model using Lingo 11.0 and numerical results show that the optimal solution can be obtained within an hour on a personal computer when the order size is less than 16.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
D. Li, J. Wang, X.L. Sun, Computing exact solution to nonlinear integer programming: convergent Lagrangian and objective level cut method, journal of global optimization. J. Glob. Optim. 39 (1), 127–154 (2007)
J. Li, J. Wang, Research of order acceptance with process production based on outsourcing. Logist. Manag. 37 (2), 68–70 (2014)
Z. Liao, S. Hu, B. Zhang, J. Ou, Strategy for priority of order based on AHP and fuzzy comprehensive evaluation. Sci. Technol. Managem. Rese. 31 (24), 191–194 (2011)
S.A. Slotnick, T.E. Morton, Order acceptance with weighted tardiness. Comput. Oper. Res. 34 (10), 3029–3042 (2007)
H. Song, S. Ma, Co-optimization for mixed-model assembly flow line to minimize makespan. Syst. Eng. Theory Pract. 27 (2), 153–160 (2007)
J. Wang, D. Li, X.L. Sun, A revised Taha’s algorithm for polynomial 0–1 programming. Optimization 56 (5), 699–713 (2007)
F. Wester, J. Wijngaard, W.R.M. Zijm, Order acceptance strategies in a production-to-order environment with setup times and due-dates. Int. J. Prod. Res. 30 (6), 1313–1326 (1992)
S. Xu, T. Li, B. Wang, L. Bai, Repair-based constraint satisfaction algorithm for an order release problem in flow shop environment. Manuf. Autom. 36 (3), 1–6 (2014)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2017 Springer International Publishing AG
About this chapter
Cite this chapter
Wang, J., Zhuang, X., Wu, B. (2017). A New Model and Method for Order Selection Problems in Flow-Shop Production. In: Choi, TM., Gao, J., Lambert, J., Ng, CK., Wang, J. (eds) Optimization and Control for Systems in the Big-Data Era. International Series in Operations Research & Management Science, vol 252. Springer, Cham. https://doi.org/10.1007/978-3-319-53518-0_13
Download citation
DOI: https://doi.org/10.1007/978-3-319-53518-0_13
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-53516-6
Online ISBN: 978-3-319-53518-0
eBook Packages: Business and ManagementBusiness and Management (R0)