Abstract
In steel industry hot rolling is an energy-intensive process as steel slabs need to be heated to about 1,250 \(^\circ \)C before being rolled on the hot strip mill. Due to time-dependent piecewise energy demand, the total energy consumption for heating is determined by the hot rolling schedule. However, there is no modeling approach known which incorporates the interdependencies between the schedule, the charging time of the slabs, their charging temperature and the energy requirement for heating. We present a MILP formulation for the hot strip mill scheduling problem (HSMSP) under consideration of energy consumption. It takes into account the mentioned interdependencies as well as setups and makespan.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Chen, Y. W., Lu, Y. Z., Ge, M., Yang, G. K., & Pan, C. C. (2012). Development of hybrid evolutionary algorithms for production scheduling of hot strip mill. Computers and Operations Research, 39(2), 339–349.
Jia, S., Zhu, J., Yang, G., Yi, J., & Du, B. (2012). A decomposition-based hierarchical optimization algorithm for hot rolling batch scheduling problem. The International Journal of Advanced Manufacturing Technology, 61(5), 487–501.
Liu, S. (2010). Model and algorithm for hot rolling batch planning in steel plants. International Journal of Information and Management Sciences, 21, 247–263.
Tu, N., Luo, X., & Chai, T. (2011). Two-stage method for solving large-scale hot rolling planning problem in steel production. In International Federation of Automatic Control (eds.), Preprints of the 18th IFAC World Congress (Vol. 18, pp. 12120–12125).
Wang, X., & Tang, L. (2008). Integration of batching and scheduling for hot rolling production in the steel industry. The International Journal of Advanced Manufacturing Technology, 36(5), 431–441.
Yadollahpour, M., Bijari, M., Kavosh, S., & Mahnam, M. (2009). Guided local search algorithm for hot strip mill scheduling problem with considering hot charge rolling. The International Journal of Advanced Manufacturing Technology, 45(11), 1215–1231.
Zhao, J., Wang, W., Liu, Q., Wang, Z., & Shi, P. (2009). A two-stage scheduling method for hot rolling and its application. Control Engineering Practice, 17(6), 629–641.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2014 Springer International Publishing Switzerland
About this paper
Cite this paper
Puttkammer, K., Wichmann, M.G., Spengler, T.S. (2014). Hot Strip Mill Scheduling Under Consideration of Energy Consumption. In: Huisman, D., Louwerse, I., Wagelmans, A. (eds) Operations Research Proceedings 2013. Operations Research Proceedings. Springer, Cham. https://doi.org/10.1007/978-3-319-07001-8_48
Download citation
DOI: https://doi.org/10.1007/978-3-319-07001-8_48
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-07000-1
Online ISBN: 978-3-319-07001-8
eBook Packages: Business and EconomicsBusiness and Management (R0)