Abstract
The growth of construction projects and technology in Indonesia is very rapid in the implementation process which has resulted in several innovations. One of the innovation models in construction modeling is building information modeling (BIM). Meanwhile, in implementing a construction project, there is often cost overrun and delays. This paper aims to analyze the causes of cost overrun in building construction projects in the construction phase using BIM. A structural equation model (SEM) method with a smart partial least square tool was used to analyze what causes and influences cost overrun that can be tackled by BIM. The factors that influence cost overrun are the high frequency of change in the construction phase, schedule delays, inadequate control and monitoring, poor finance control in the field, inadequate supervisor placement and qualifications, shipping delays, inadequate equipment, a lack of material, and poor management and supervision at the site. This paper contributes to project managers and project teams to know what factors influence cost overrun in building a construction project.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Santosa, B.: Manajemen Proyek - Konsep & Implementasi. Graha Ilmu, Yogyakarta (2009)
Wisudanto, A.W.: Factor Contributing Delay in Building Constructing Projects at Kediri [In Indonesian]. Master Thesis, Institut Teknologi Sepuluh Nopember (ITS) Surabaya (2012). https://chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://repository.its.ac.id/63037/1/3109203006-Master%20Thesis.pdf
Dapu, Y., Dundu, A., Walangitan, R.: Faktor – Faktor Yang Menyebabkan Cost Overrun Pada Proyek Konstruksi. Jurnal Sipil Statik (4), 641–647 (2016)
Tri, I.: Teknologi Turut Mendukung Industri Jasa Konstruksi Lebih Efisien (2019). https://pu.go.id/berita/view/17195/teknologi-turut-mendukung-industri-jasa-konstruksi-lebih-efisien
Latiffi, A., Mohd S., Kasim, N., Fathi, M.: Building information modeling (BIM) application in Malaysian construction industry. Int. J. Constr. Eng. Manag. 1(6) (2013)
Andrić, J., Mahamadu, A., Wang, J., Zou, P., Zhong, R.: The cost performance and causes of overruns in infrastructure development projects in Asia. J. Civil Eng. Manag. 25(3), 203–214 (2019)
Messner, J., et al.: BIM Project Execution Planning Guide - Version 2.2. Computer Integration Construction Research Program, Penn State - University Park, PA, USA (2019). https://psu.pb.unizin.org/%0Abimprojectexecutionplanningv2x2/
Berlian, C., Adhi, R., Hidayat, A., Nugroho, H.: Perbandingan Efisiensi Waktu, Biaya, Dan Sumber Daya Manusia Antara Metode Building Information Modeling (BIM) Dan Konvensional (Studi Kasus: Perencanaan Gedung 20 Lantai). Jurnal Karya Teknik Sipil 5(2), 220–229 (2016)
Ullah, K., Lill, I., Witt, E.: An overview of BIM adoption in the construction industry: benefits and barriers. In: Emerald Reach Proceedings Series, pp. 291–303 (2019)
Ghozali, H., Latan H.: Partial Least Square - Konsep, Teknik dan Aplikasi Menggunakan Program SmartPLS 3.0. 2 ed. Badan Penerbit – Undip, Semarang (2015)
Memon, A., Rahman I., Azis, A.: Preliminary study on causative factors leading to construction cost overrun. Int. J. Sustain. Constr. Eng. Technol. 2(1) (2011)
Remi, F: Kajian Faktor Penyebab Cost Overrun Pada Proyek Konstruksi Gedung. Jurnal Teknik Mesin 06 (2017)
Achirwan, Y., dan Abidin, I.: Pola Hubungan Antara Kinerja Biaya Proyek Dan Dampak Penyimpangan Biaya Proyek Dengan Pendekatan Indikator Cost Overrun Pada Pengelolaan Sub Kontraktor. Jurnal Konstruksia 4(2), 61–75 (2013)
Sahusilawane, T., Bisri, M., Rachmansyah, A.: Analisis Faktor-Faktor Penyebab Terjadinya Pembengkakan Biaya (Cost Overrun) Pada Proyek Konstruksi Gedung Di Kota Ambon. Jurnal Rekayasa Sipil 5(2), 118–128 (2011)
Kulkarni, S., Mhetar, G.: Cost control technique using building information modeling (BIM) for a residential building. Int. J. Eng. Res. Technol. (2017)
Tahir, M., et al.: Improving cost and time control in construction using building information model (BIM). A review. Pertanika J. Sci. Technol. 26, 1 (2018)
ICB - IPMA Competence Baseline, Version 4.0. International Project Management Association, The Netherlands (2015)
Wirabakti, D., Abdullah, R., Maddeppungeng A.: Studi Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Bangunan Gedung. Jurnal Konstruksia 6(1) (2014)
Fuadie, D.: Analisis Faktor Penyebab Dan Dampak Kesalahan Desain Pada Proyek-Proyek Di Pt. Pertamina Mor V, Institut Teknologi Sepuluh Nopember Surabaya (2017)
Widhiawati, I.A.., Wiranata, A.A., Wirawan I. P.Y.: Faktor-Faktor Penyebab Change Order Pada Proyek Konstruksi Gedung. Jurnal Ilmiah Teknik Sipil 20(1) (2016)
Glavinich, T.: Construction Planning & Scheduling. Associated General Contractors of America (2004)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2023 The Author(s), under exclusive license to Springer Nature Switzerland AG
About this paper
Cite this paper
Sihombing, L.B., Baskoro, A.T. (2023). Analysing Cost Overrun in Building a Construction Project Using Building Information Modeling. In: Bushuyev, S., Ding, R., Radujkovic, M. (eds) Project Management in the Digital Transformation Era. IPMA 2021. Lecture Notes in Networks and Systems, vol 704. Springer, Cham. https://doi.org/10.1007/978-3-031-34629-3_16
Download citation
DOI: https://doi.org/10.1007/978-3-031-34629-3_16
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-031-34628-6
Online ISBN: 978-3-031-34629-3
eBook Packages: Intelligent Technologies and RoboticsIntelligent Technologies and Robotics (R0)