Abstract
Surface mount technology, usually on the context of Pick-up and Placement, is used on printed circuit boards assembling. In this paper, some aspects and physical parameters related with the pick-up and placement process are analysed in detail throughout the entire work sequence, such as the different variants of these same components among the various suppliers under study. In this process, there are problems of rejection and quality. The aim of this work is to identify and analyse these types of components, as well as their differences and possible causes for their misplacement on the printed circuit boards. Measurements and analyses were performed in lab tests and the study focused more on the capacitors’ assembling details. Experimental tests were carried out on the production line in order to obtain conclusive results regarding the study of nozzles and placement of components. Finally, it was concluded that nozzles 907 present a good behaviour in resistors and nozzles 925 present a good behaviour in capacitors.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Notes
- 1.
Internal number that identifies the component.
References
Kunz, G., Perondi, E., Machado, J.: Modeling and simulating the controller behavior of an automated people mover using IEC 61850 communication requirements. In: IEEE International Conference on Industrial Informatics (INDIN), art. no. 6034947, pp. 603–608 (2011). https://doi.org/10.1109/INDIN.2011.6034947
Campos, J.C., Machado, J.: Pattern-based analysis of automated production systems. IFAC Proc. Volumes (IFAC-PapersOnline) 13(PART 1), 972–977 (2009). https://doi.org/10.3182/20090603-3-RU-2001.0425
Kunz, G., Machado, J., Perondi, E., Vyatkin, V.: A Formal methodology for accomplishing IEC 61850 real-time communication requirements. IEEE Trans. Ind. Electron. 64(8), art. no. 7878522, 6582–6590 (2017). https://doi.org/10.1109/TIE.2017.2682042
Gangala, C., Modi, M., Manupati, V.K., Varela, M.L.R., Machado, J., Trojanowska, J.: Cycle time reduction in deck roller assembly production unit with value stream mapping analysis. In: Rocha, Á., Correia, A.M., Adeli, H., Reis, L.P., Costanzo, S. (eds.) WorldCIST. AISC, vol. 571, pp. 509–518. Springer, Cham (2017). https://doi.org/10.1007/978-3-319-56541-5_52
Trojanowska, J., Zywicki, K., Varela, M.L.R., Machado, J.M.: Shortening changeover time - an industrial study. In: 2015 10th Iberian Conference on Information Systems and Technologies, CISTI 2015, art. no. 7170373 (2015). https://doi.org/10.1109/CISTI.2015.7170373
Vieira, G.G., Varela, M.L.R., Putnik, G.D., Machado, J.M., Trojanowska, J.: Integrated platform for real-time control and production and productivity monitoring and analysis. Rom. Rev. Precis. Mech. Opt. Mechatron. 2016(50), 119–127 (2016)
Surface-mount technology Homepage. https://en.wikipedia.org/wiki/Surface-mount_technology#/media/File:SMT_sizes,_based_on_original_by_Zureks.svg. Accessed 18 Apr 2019
Kitada, T., Seki, Y.: Mounting Technique of 0402 - Sized Surface-Mount (SMD) on FPC, p. 29, Fujikura Technical Review (2011)
Bosch em Portugal Braga Homepage. https://www.bosch.pt/a-nossa-empresa/bosch-em-portugal/braga/. Accessed 03 June 2019
Yilmaz, I.: Development and Evaluation of Setup Strategies in Printed Circuit Board Assembly, 1st edn. Springer, Heidelberg (2008). https://doi.org/10.1007/978-3-8349-9872-9
Ayob, M., Kendall, G.: A survey of surface mount device placement machine optimisation: machine classification. Eur. J. Oper. Res. 22 (2007)
SMT_Nomenclature Homepage. https://www.topline.tv/SMT_Nomenclature.pdf. Accessed 15 Apr 2019
Samsung-Electro-Mechanics-datasheet-81461623.pdf Homepage. https://datasheet.octopart.com/CL05B104KO5NNNC-Samsung-Electro-Mechanics-datasheet-81461623.pdf. Accessed 05 Apr 2019
mcr-e.pdf. Homepage. https://fscdn.rohm.com/en/products/databook/datasheet/passive/resistor/chip_resistor/mcr-e.pdf. Accessed 12 Apr 2019
Acknowledgements
This work is supported by: European Structural and Investment Funds in the FEDER component, through the Operational Competitiveness and Internationalization Programme (COMPETE 2020) [Project nº 39479; Funding Reference: POCI-01-0247-FEDER-39479].
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2022 The Author(s), under exclusive license to Springer Nature Switzerland AG
About this paper
Cite this paper
Silva, L., Meireles, J., Pinhão, M., Gonçalves, A.M., Malheiro, M.T. (2022). Pick-Up and Placement Improvement: An Industrial Case Study. In: Machado, J., Soares, F., Trojanowska, J., Ottaviano, E. (eds) Innovations in Mechanical Engineering. icieng 2021. Lecture Notes in Mechanical Engineering. Springer, Cham. https://doi.org/10.1007/978-3-030-79165-0_28
Download citation
DOI: https://doi.org/10.1007/978-3-030-79165-0_28
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-79164-3
Online ISBN: 978-3-030-79165-0
eBook Packages: EngineeringEngineering (R0)