ELC Electroconsult S.p.A. (Italy), in association with NEWJEC Inc. (Japan), is carrying out the updating of a feasibility study and the detailed design of a storage hydropower project in the Himalayas, under a grant from the Asian Development Bank. The project layout includes two powerhouses. The main powerhouse, with a capacity of 600 MW, is located at some 14 km distance from the reservoir. The headrace tunnel to the main powerhouse has a length of 13.3 km. It is located in a region of high seismicity, with lack of access along the tunnel alignment, which it makes it difficult to get comprehensive geotechnical information along the tunnel route. Despite the uncertainties present, it is necessary to provide and assessment of the headrace tunnel cost and schedule to determine the project feasibility. This paper shows the procedure followed by the Consultant to assess a risk-based contingency cost for the tunnel accounting for the uncertainties present. The uncertainties have been grouped in three types: (1) extent of the geological formations, (2) geo-mechanical properties, and (3) the occurrence of adverse events such as collapses, rockfalls, squeezing and tunnel flooding due to groundwater. The objective is to assess a level of cost contingency associated with a certain probability of not being exceeded, to inform the decision on the amount of the contingency cost that should be considered at this stage of the project.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Dhital MR (2015) Geology of the Nepal Himalaya: regional perspective of the classic collided orogen. In:Regional geology review. Springer, Heidelberg
Carosi R, Montomoli C, Iaccarino S (2018) 20 years of geological mapping of metamorphic core across Central and Eastern Himalayas. Earth Sci Rev 177:124–138
Groppo C, Rolfo F, Indares A (2012) Partial melting in the Higher Himalayan Crystallines of Eastern Nepal: the effect of decompression and implications for the “channel flow” model. J Petrol 53:1057–1088
Mosca P, Groppo C, Rolfo F (2014) The geology between Khimti Khola and Likhu Khola valleys: a field trip along the Numbur Cheese Circuit (central-eastern Nepal Himalaya). J Virtual Explor (Electronic Edition 47, paper 4)
Hoek E Practical rock engineering. https://www.rocscience.com/learning/hoeks-corner. Accessed 05 June 2019
Marinos P, Hoek E (2000) GSI: a geologically friendly tool for rock mass strength estimation. In: Proceedings of GeoEng 2000 at the International conference on geotechnical and geological engineering
Sousa RL (2010) Risk analysis for tunneling projects. Doctoral Thesis, Massachusetts Institute of Technology, USA
Eskesen SD, Tengborg P, Kampmann J, Veicherts TH (2004) Guidelines for tunnelling risk management: International Tunnlling Association, Working Group No 2. Tunn Undergr Space Technol 19:217–237
Isakson T (2002) Model for estimation of time and cost based on risk evaluation applied on tunnel projects. Doctoral Thesis, Royal Institute of Technology, Sweden
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2021 The Editor(s) (if applicable) and The Author(s), under exclusive license to Springer Nature Switzerland AG
About this paper
Cite this paper
Raggi, F., Tamburini, A., Altarejos-Garcia, L. (2021). Cost Risk Assessment of 13 km Long Headrace Tunnel in the Himalayas. In: Bolzon, G., Sterpi, D., Mazzà, G., Frigerio, A. (eds) Numerical Analysis of Dams . ICOLD-BW 2019. Lecture Notes in Civil Engineering, vol 91. Springer, Cham. https://doi.org/10.1007/978-3-030-51085-5_47
Download citation
DOI: https://doi.org/10.1007/978-3-030-51085-5_47
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-51084-8
Online ISBN: 978-3-030-51085-5
eBook Packages: EngineeringEngineering (R0)