Skip to main content

Tailoring PMI and OGC Portfolio Frameworks

  • Conference paper
  • First Online:
Computational Science and Its Applications – ICCSA 2019 (ICCSA 2019)

Part of the book series: Lecture Notes in Computer Science ((LNTCS,volume 11622))

Included in the following conference series:

  • 1671 Accesses

Abstract

The strategy definition in organizations and its implementation by projects has been difficult to achieve. Project portfolio management processes provide the linkage between the organization’s strategic objectives and their programs and projects. It is worthless to have the latest technology and resources to develop projects, if there are no organized processes and focus on strategic interests. The organizations need to develop processes, tools, and techniques that support their business, to act at the required level, but keeping in mind that these processes and tools need to evolve over time. Therefore, for a better understanding of the processes and use of artefacts from ‘project portfolio management’, this paper aims to develop an information technology ‘project portfolio management’ framework based on ‘project portfolio management’ processes from PMI and artefacts from OGC (Axelos, until 2013). For a better understanding of the process, inputs and outputs artefacts, the framework is modelled using the BPMN-Business Process Modelling and is done a traceability map, of an example artefact, using UML State Machine Model.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 84.99
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Similar content being viewed by others

References

  1. Markowitz, H.: Portfolio selection. J. Finance 7(1), 77–91 (1952)

    Google Scholar 

  2. Kopmann, J., Kock, A., Killen, C.P., Gemünden, H.G.: The role of project portfolio management in fostering both deliberate and emergent strategy. Int. J. Proj. Manag. 35(4), 557–570 (2017)

    Article  Google Scholar 

  3. Kester, L., Griffin, A., Hultink, E.J., Lauche, K.: Exploring portfolio decision-making processes. J. Prod. Innov. Manag. 28(5), 641–661 (2011)

    Google Scholar 

  4. McNally, R.C., Durmuşoğlu, S.S., Calantone, R.J.: New product portfolio management decisions: antecedents and consequences. J. Prod. Innov. Manag. 30(2), 245–261 (2013)

    Article  Google Scholar 

  5. McCarthy, I.P., Tsinopoulos, C., Allen, P., Rose-Anderssen, C.: New product development as a complex adaptive system of decisions. J. Prod. Innov. Manag. 23(5), 437–456 (2006)

    Article  Google Scholar 

  6. Archer, N., Ghasemzadeh, F.: An integrated framework for project portfolio selection. Int. J. Proj. Manag. 17(4), 207–216 (1999)

    Article  Google Scholar 

  7. Rautiainen, K., Schantz, J., Vahaniitty, J.: Supporting scaling agile with portfolio management: case Paf. com. In: 2011 44th Hawaii International Conference on System Sciences (HICSS), pp. 1–10 (2011)

    Google Scholar 

  8. Bitman, W.R., Sharif, N.: A conceptual framework for ranking R&D projects. IEEE Trans. Eng. Manag. 55(2), 267–278 (2008)

    Article  Google Scholar 

  9. Blau, G.E., Pekny, J.F., Varma, V.A., Bunch, P.R.: Managing a portfolio of interdependent new product candidates in the pharmaceutical industry. J. Prod. Innov. Manag. 21(4), 227–245 (2004)

    Article  Google Scholar 

  10. Cooper, R., Edgett, S., Kleinschmidt, E.: Portfolio management in new product development: lessons from the leaders-II. Res. Technol. Manag. 40(6), 43–52 (1997)

    Article  Google Scholar 

  11. Mikkola, J.H.: Portfolio management of R&D projects: implications for innovation management. Technovation 21(7), 423–435 (2001)

    Article  Google Scholar 

  12. Project Management Institute: The Standard for Portfolio Management. Project Management Institute, Newtown Square (2013)

    Google Scholar 

  13. Axelos, MoPTM Management of Portfolios, London (2011)

    Google Scholar 

  14. McDonald, C., Sarbazhosseini, H.: A state transition approach to conceptualising research: the project portfolio management domain. In: 24th Australasian Conference on Information Systems (ACIS), pp. 1–10 (2013)

    Google Scholar 

  15. Young, M., Conboy, K.: Contemporary project portfolio management: reflections on the development of an Australian competency standard for project portfolio management. Int. J. Proj. Manag. 31(8), 1089–1100 (2013)

    Article  Google Scholar 

  16. Williams, B., Young, M., Young, R., Zapata, J.: Project, programme and portfolio maturity: a case study of Australian Federal Government. Int. J. Manag. Proj. Bus. 7(2), 215–230 (2014)

    Article  Google Scholar 

  17. Lima, A., Monteiro, P., Fernandes, G., Machado, Ricardo J.: Dependency analysis between PMI portfolio management processes. In: Gervasi, O., et al. (eds.) ICCSA 2016. LNCS, vol. 9790, pp. 288–300. Springer, Cham (2016). https://doi.org/10.1007/978-3-319-42092-9_22

    Chapter  Google Scholar 

  18. Lima, A., Machado, R.J., Fernandes, G.: Input and output artefacts in portfolio practices from the OGC standard for Management of Portfolios. In: 2017 17th International Conference on Computational Science and Its Applications (ICCSA), pp. 1–8 (2017)

    Google Scholar 

  19. OMG, Business Process Model And NotationTM (BPMNTM), OMG (2013). http://www.omg.org/spec/BPMN/2.0.2/PDF/. Accessed 25 Aug 2017

  20. Lima, A., Fernandes, G., Machado, R.J.: Mapping between PMI and OGC artefacts for project portfolio management. In: International Conference on Intelligent Systems 2018’IS (2018)

    Google Scholar 

  21. Lübke, D., Schneider, K.: Visualizing use case sets as BPMN processes. In: Requirements Engineering Visualization, 2008. REV 2008, pp. 21–25 (2008)

    Google Scholar 

  22. OMG, OMG unified modeling language, superstructure version, 2015 (2015). http://www.omg.org/spec/UML/2.5/PDF/. Accessed 28 Aug 2017

  23. Harel, D.: Statecharts: a visual formalism for complex systems. Sci. Comput. Program. 8(3), 231–274 (1987)

    Article  MathSciNet  MATH  Google Scholar 

  24. Gross, H.: Component-Based Software Testing with UML. Springer, Heidelberg (1998)

    MATH  Google Scholar 

Download references

Acknowledgements

This work has been supported by FCT – Fundação para a Ciência e Tecnologia within the Project Scope: UID/CEC/00319/2019.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Ana Lima .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Lima, A., Fernandes, G., Machado, R.J. (2019). Tailoring PMI and OGC Portfolio Frameworks. In: Misra, S., et al. Computational Science and Its Applications – ICCSA 2019. ICCSA 2019. Lecture Notes in Computer Science(), vol 11622. Springer, Cham. https://doi.org/10.1007/978-3-030-24305-0_27

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-24305-0_27

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-24304-3

  • Online ISBN: 978-3-030-24305-0

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics