Skip to main content

A Proposal to Improve the Earned Value Management Technique Using Quality Data in Software Projects

  • Conference paper
  • First Online:
16th International Conference on Information Technology-New Generations (ITNG 2019)

Abstract

Currently the Project Management Institute (PMI) estimates that approximately 25% of the world’s Gross Domestic Product (GDP) is spent on projects of various kinds and that about 16.5 million professionals are directly involved in project management worldwide. This volume of projects and changes in the world scenario, increasingly competitive, generate the need for faster results, with higher quality, lower costs and shorter deadlines. Among the main techniques for analyzing cost, time and scope performance, the Earned Value Management (EVM) technique is considered to be the most reliable. Several formulas derived from EVM’s measurements are available and have been studied over the past 15 years. However, EVM has a significant limitation regarding quality in its method. The technique is effective in providing cost and schedule related information but is still weak in taking the quality factor into account. The objective of this work is to improve the predictability of cost and schedule of software projects using the EVM technique, by adding quality variables and allowing EVM to integrate not only scope, schedule and cost but quality as well. This paper presents a proposal to enhance the EVM technique by integrating the quality component. The proposed technique is evaluated and compared to the traditional technique through different hypothesis tests, utilizing data from simulated projects. Hypotheses tests with 95% significance level were performed, and the technique was more accurate than the traditional EVM for the projection of the Cost Performance Index – CPI and the Schedule Performance Index – SPI.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.00
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Lipke, W.: Statistical methods applied to EVM: the next frontier. CrossTalk 19, 20–23 (2006)

    Google Scholar 

  2. Vandevoorde, S., Vanhoucke, M.: A comparison of different project duration forecasting methods using earned value metrics. Int. J. Proj. Manag. 24(4), 289–302 (2006)

    Article  Google Scholar 

  3. Lipke, W.: Schedule is different. PMI CPM J. Meas. News 1, 31–34 (2003)

    Google Scholar 

  4. Solomon, P.: Using CMMI to improve earned value management. Technical report CMU/SEI-2002-TN-016, Software Engineering Institute, Carnegie Mellon University, Pittsburgh (2002)

    Google Scholar 

  5. Suarez, J., Crosby, P., Total Quality Leadership Office Arlington VA, Deming, W., Juran, J., United States. Navy Department, Total Quality Leadership Office: Three Experts on Quality Management: Philip B. Crosby, W. Edwards Deming, Joseph M. Juran. TQLO publication, Department of the Navy TQL Office (1992)

    Google Scholar 

  6. Dodson, M., Defavari, G., de Carvalho, V.: Quality: the third element of earned value management. Proc. Comput. Sci. 64, 932–939 (2015). Conference on ENTERprise Information Systems/International Conference on Project MANagement/Conference on Health and Social Care Information Systems and Technologies, CENTERIS/ProjMAN/HCist 2015, 7–9 Oct 2015

    Google Scholar 

  7. Lipke, W., Zwikael, O., Henderson, K., Anbari, F.: Prediction of project outcome. Int. J. Proj. Manag. 27(4), 400–407 (2009)

    Article  Google Scholar 

  8. Henderson, K., Zwikael, D.O.: Does project performance stability exist? A re-examination of CPI and evaluation of SPI(t) stability. CrossTalk 21 (2008)

    Google Scholar 

  9. Solomon, P.J.: Practical performance-based earned value. In: Systems and Software Technology Conference (2006)

    Google Scholar 

  10. Solomon, P.J.: Performance-based earned value. In: INCOSE International Symposium, vol. 15 (2007)

    Google Scholar 

  11. Solomon1, P.J.: Basing earned value on technical performance. CrossTalk 26, 25–28 (2013)

    Google Scholar 

  12. Leu, S.-S., Lin, Y.-C., Chen, T.-A., Ho, Y.-Y.: Improving traditional earned value management by incorporating statistical process charts, In: 23rd International Symposium on Automation and Robotics in Construction (2006)

    Google Scholar 

  13. Yerabolu, R., P.M. Institute: Framework for Integrating Project Quality, Risk Management, and Integration Management Disciplines into Earned Value Management (EVM) for Deriving Performance Based Earned Value (PBEV) (2010)

    Google Scholar 

  14. Ma, X., Yang, B.: Optimization study of earned value method in construction project management. In: 2012 International Conference on Information Management, Innovation Management and Industrial Engineering, vol. 2, pp. 201–204 (2012)

    Google Scholar 

  15. Mafra, S.N., Barcelos, R.F., Travassos, G.H.: Aplicando uma Metodologia Baseada em Evidência na Definição de Novas Tecnologias de Software. In: XX Simpósio Brasileiro de Engenharia de Software, Florianópolis, pp. 239–254, Oct 2006

    Google Scholar 

  16. Conte, T., Massolar, J., Mendes, E., Travassos, G.H.: Web usability inspection technique based on design perspectives. IET Softw. 3, 106–123 (2009)

    Article  Google Scholar 

  17. Shull, F., Carver, J., Travassos, G.H.: An empirical methodology for introducing software processes. SIGSOFT Softw. Eng. Notes 26, 288–296 (2001)

    Article  Google Scholar 

  18. Kitchenham, B.: Procedures for performing systematic reviews. Keele University, Technical report tr/se-0401, Department of Computer Science, Keele University (2004)

    Google Scholar 

  19. Pohl, M.J.: A total quality management (Tqm) strategic measurement perspective with specific reference to the software industry. PhD thesis (1997)

    Google Scholar 

  20. Rever, H.: Quality in project management – a practical look, chapter 8. In: Paper presented at PMI Global Congress 2007–Latin America, Cancún, Mexico. Project Management Institute, Newtown Square (2007)

    Google Scholar 

  21. de Souza, A.D., Rocha, A.R.C., Cristina, D., Constantino, B.A.: A Proposal for the Improvement of Project’s Cost Predictability Using Earned Value Management and Quality Data – An Empirical Study, pp. 170–181. Springer, Berlin/Heidelberg (2014)

    Google Scholar 

  22. Peccoud, J.: If you can’t measure it, you can’t manage it. PLoS Comput. Biol. 10(3), e1003462. https://doi.org/10.1371/journal.pcbi.1003462

  23. Lipke, W.: Is something missing from project management? CrossTalk 26, 16–20 (2013)

    Google Scholar 

  24. Khalid, T.A.: Controlling software cost using fuzzy quality based EVM. In: International Conference on Computing, Control, Networking, Electronics and Embedded Systems Engineering (2015)

    Google Scholar 

  25. Project Management Institute: A Guide to the Project Management Body of Knowledge (PMBOK Guides). Project Management Institute (2004)

    Google Scholar 

  26. de Souza, A.D., Rocha, A.R.C.: A Proposal for the Improvement Predictability of Cost Using Earned Value Management and Quality Data, pp. 190–201. Springer, Berlin/Heidelberg (2013)

    Google Scholar 

  27. Iranmanesh, S.H., Hojati, Z.T.: Intelligent Systems in Project Performance Measurement and Evaluation, pp. 581–619. Springer International Publishing, Cham (2015)

    Google Scholar 

  28. Wohlin, C., Runeson, P., Höst, M., Ohlsson, M.C., Regnell, B., Wesslén, A.: Experimentation in Software Engineering: An Introduction. Kluwer Academic Publishers, Norwell (2000)

    Book  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Christopher de Souza Lima Francisco .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2019 Springer Nature Switzerland AG

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

de Souza Lima Francisco, C., de Souza, A.D. (2019). A Proposal to Improve the Earned Value Management Technique Using Quality Data in Software Projects. In: Latifi, S. (eds) 16th International Conference on Information Technology-New Generations (ITNG 2019). Advances in Intelligent Systems and Computing, vol 800. Springer, Cham. https://doi.org/10.1007/978-3-030-14070-0_84

Download citation

  • DOI: https://doi.org/10.1007/978-3-030-14070-0_84

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-030-14069-4

  • Online ISBN: 978-3-030-14070-0

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics