Role of the Project Engineer in the Construction Stage

  • Chapter
  • First Online:
Handbook of Food Factory Design
  • 3891 Accesses

Abstract

The first challenge faced by the project engineer in the construction phase is to make sure that the project scope is well understood by all parties involved. In particular, it should be reflected in the cost schedules, with due allowances made for unforeseen aspects. A Quality Plan, which will set out the agreed format for communications, requirements for quality checks, certification of work completed, and authority levels, etc. must also be developed. The possible forms of construction contract (e.g., traditional and turnkey) are then discussed. The following three sections address project planning, construction approvals and permits, and site issues. The author also stresses the need to ensure the timely execution of ancillary activities such as equipment commissioning, obtaining raw materials for trials, recruitment and training, etc., if delays and overruns are to be avoided (a checklist is provided). The chapter concludes with advice on completion and hand-over.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 139.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 179.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 249.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Further Reading

  • Barrie, D.S. and Paulson, B.C. (1991) “Professional construction management”, 3rd edit., McGraw-Hill, New York, 672 pp.

    Google Scholar 

  • Halpin, D.W. and Senior, B.A. (2010) “Construction management”, John Wiley & Sons, Hoboken, NJ, 480 pp.

    Google Scholar 

  • Fewings, P. and Jones, M. (2005) “Construction project management. An integrated approach”, Taylor & Francis, New York, 400 pp.

    Google Scholar 

  • Kharbanda, O.P., Stalloworthy E.A. and Williams L.F. (1987) “Project cost control in action”, 22nd edit., Gower, Aldershot, UK, 320 pp.

    Google Scholar 

  • Walker, A. (2007) “Project management in construction” John Wiley & Sons, Hoboken, NJ, 328 pp.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to G. M. Kirt .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2013 Springer Science+Business Media New York

About this chapter

Cite this chapter

Kirt, G.M. (2013). Role of the Project Engineer in the Construction Stage. In: Baker, C. (eds) Handbook of Food Factory Design. Springer, New York, NY. https://doi.org/10.1007/978-1-4614-7450-0_20

Download citation

Publish with us

Policies and ethics