A method is proposed for estimating the reliability of multiparametric instrumented monitoring of limited production runs based on simulations taking customer and producer risks into account.
Similar content being viewed by others
References
S. B. Danilevich and S. S. Kolesnikov, “Choice of indices of the reliability of monitoring,” Zakonodat. Prikl. Metrol., No. 2, 48–51 (2008).
S. B. Danilevich and S. S. Kolesnikov, “Development of methods for effective monitoring of complicated systems,” Izmer. Tekhn., No. 5, 19–22 (2007); Measur. Techn., 50, No. 5, 485–489 (2007).
S. B. Danilevich and V. V. Knyazhevskii, “Planning sampling instrumented monitoring by simulation modelling,” Metody Menedzh. Kach., No. 4, 33–36 (2004).
S. B. Danilevich, V. V. Knyazhevskii, and S. S. Kolesnikov, “Is output monitoring of serial production necessary?” Metody Menedzh. Kach., No. 7, 40–43 (2006).
S. B. Danilevich, Development of Efficient Methods for Monitoring and Testing Production [in Russian], Izd. NGTU, Novosibirsk (2011).
S. B. Danilevich, S. S. Kolesnikov, and Yu. A. Palchun, “Use of simulation modelling for certification of monitoring and testing procedures,” Izmer. Tekhn., No. 7, 70–73 (2011); Measur. Techn., 54, No. 7, 846–850 (2011).
B. Yu. Lemeshko et al., Statistical Analysis of Data, Modelling and Study of Probabilistic Behavior: A Computer Approach [in Russian], Izd. NGTU, Novosibirsk (2011).
S. B. Danilevich and S. S. Kolesnikov, “Quality of production and the reliability of monitoring procedures,” Kompetentnost, No. 2, 20–22 (2011).
Author information
Authors and Affiliations
Corresponding author
Additional information
Translated from Izmeritel’naya Tekhnika, No. 11, pp. 18–21, November, 2012.
Rights and permissions
About this article
Cite this article
Danilevich, S.B. Estimating the Reliability of Monitoring Limited Production Runs. Meas Tech 55, 1252–1255 (2013). https://doi.org/10.1007/s11018-013-0116-2
Received:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s11018-013-0116-2