Abstract
As already mentioned in Chap. 1, the preparatory investigation, design and construction of the Honshu-Shikoku Bridges (HSB) had 40 years of history as shown in Table 3.1, and its construction finally came to the end by completing the Akashi-Kaikyo Bridge in 1998 and the Tatara Bridge as well as Kurushima-Kaikyo Bridges in 1999.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
Copyright information
© 2012 Springer
About this chapter
Cite this chapter
Fujino, Y., Kimura, K., Tanaka, H. (2012). Wind Related Codes for the Honshu-Shikoku Project. In: Wind Resistant Design of Bridges in Japan. Springer, Tokyo. https://doi.org/10.1007/978-4-431-54046-5_3
Download citation
DOI: https://doi.org/10.1007/978-4-431-54046-5_3
Publisher Name: Springer, Tokyo
Print ISBN: 978-4-431-54045-8
Online ISBN: 978-4-431-54046-5
eBook Packages: EngineeringEngineering (R0)