Abstract
Owing to the amazing rise attention of the government has paid to the railway construction, and high-speed projects have been started in various places, the railway construction enterprises begin to focus more emphasis upon how to implement and balance multi-projects at the same time. On the other hand, these projects occupy the cherish resources and lead to competition. In this research, Genetic Algorithm (GA) is used to solve the allocation resources problem in order to achieve the shortest total duration. Finally, an example is as a proof to the conclusion.
Keywords
This is a preview of subscription content, log in via an institution.
Buying options
Tax calculation will be finalised at checkout
Purchases are for personal use only
Learn about institutional subscriptionsPreview
Unable to display preview. Download preview PDF.
References
Liu, Y.-M., Wang, Z.-F., Zhang, Y.-M.: Time-resources tradeoffs of PERT construction schedule under resource constraints. Advances in Science and Technology of Water Resources, 27–30 (2007)
Duan, G.-L., Zha, J.-Z., Xu, A.-P.: The applications of heuristic algorithms in engineering. Machine Design, l–5 (2008)
Gan, T.-A., Tian, F., Li, W.-Z.: Operational Research, 3rd edn. Pek University, Beijing (2008)
Zhao, C.-Y., Zhang, L.: A Good-point Set Genetic Algorithm for TSP. Computer Engineering and Applications, 103–105 (2008)
He, J.-Y., Bai, S.-Q.: Research on critical chain schedule optimization. Management and Practice, 33–36 (2008)
Zhang, Y.-N., Sun, X.-X.: Research on Improved PERT Model Application in Analysis of Schedule Risk of Project. Science and Technology Progress and Policy 25(10), 94–96 (2008)
Zheng, X.-L., Li, F., Di, P.: Research on Application of Integral Programming PSO Algorithm to Spare Part Optimizing. Ship Electronic Engineering 29(3), 133–135 (2009)
Zhang, H.-P., Qiu, W.-H.: A Modified Genetic Algorithm for Scheduling Multiple Projects with Resource Constraint. Chinese Journal of Management Science 15(5), 78–82 (2007)
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2012 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Yunning, Z., Yao, J. (2012). Resources Allocation of Multi-project in Railway Construction. In: Zhang, T. (eds) Instrumentation, Measurement, Circuits and Systems. Advances in Intelligent and Soft Computing, vol 127. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-27334-6_79
Download citation
DOI: https://doi.org/10.1007/978-3-642-27334-6_79
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-27333-9
Online ISBN: 978-3-642-27334-6
eBook Packages: EngineeringEngineering (R0)