Abstract
Why planning? Along a supply chain hundreds and thousands of individual decisions have to be made and coordinated every minute. These decisions are of different importance. They comprise the rather simple question “Which job has to be scheduled next on a respective machine?” as well as the very serious task whether to open or close a factory. The more important a decision is, the better it has to be prepared.
Keywords
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
References
Anthony, R. (1965) Planning and control systems: A framework for analysis, Harvard University, Boston
Domschke, W.; Scholl, A. (2005) Grundlagen der Betriebswirtschaftslehre, Springer, Berlin, 3rd ed.
Fleischmann, B.; Meyr, H. (2003) Planning Hierarchy, Modeling and Advanced Planning Systems, in: A. de Kok; S. Graves (Eds.) Supply Chain Management: Design, Coordination, Operation, Handbooks in Operations Research and Management Science, vol. 11, North-Holland, Amsterdam, 457–523
Hax, A.; Meal, H. (1975) Hierarchical integration of production planning and scheduling, Logistics: TIMS Studies in Management Sciences, vol. 1, North-Holland, Amsterdam, 53–69
Hoekstra, S. (1992) Integral logistic structures, Industrial Press, Inc., New York
Miller, T. (2001) Hierarchical Operations and Supply Chain Planning, Springer, Berlin
Nahmias, S. (2005) Production and operations analysis, McGraw-Hill, Boston, 5th ed.
Orlicky, J. (1975) Material requirements planning, McGraw-Hill, New York
Rohde, J.; Meyr, H.; Wagner, M. (2000) Die Supply Chain Planning Matrix, PPS Management, vol. 5, no. 1, 10–15
Schneeweiss, C. (2003) Distributed Decision Making, Springer, Berlin, 2nd ed.
Silver, E.; Pyke, D.; Peterson, R. (1998) Inventory management and production planning and scheduling, Wiley, New York, 3rd ed.
Stadtler, H. (1986) Hierarchical production planning: Tuning aggregate planning with sequencing and scheduling, in: S. Axsäter; C. Schneeweiss; E. Silver (Eds.) Multistage production planning and inventory control, Lecture Notes in Economics and Mathematical Systems, vol. 266, Springer, Berlin et al., 197–226
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2008 Springer-Verlag Berlin Heidelberg
About this chapter
Cite this chapter
Fleischmann, B., Meyr, H., Wagner, M. (2008). Advanced Planning. In: Stadtler, H., Kilger, C. (eds) Supply Chain Management and Advanced Planning. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-74512-9_5
Download citation
DOI: https://doi.org/10.1007/978-3-540-74512-9_5
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-540-74511-2
Online ISBN: 978-3-540-74512-9
eBook Packages: Business and EconomicsBusiness and Management (R0)