Skip to main content

Creation of Hydroelectric System Scheduling by Simulation

  • Chapter

Part of the book series: Understanding Complex Systems ((UCS))

This is a preview of subscription content, log in via an institution.

Buying options

Chapter
USD   29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD   84.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD   109.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD   109.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Learn about institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

References

  • Allen, E. et al., 2001, ’“Interactive Object-Oriented Simulation of Interconnected Power Systems Using SIMULINK”’, IEEE Transactions on Education, Vol. 44, No. 1, pp. 87–95.

    Article  Google Scholar 

  • De Cuadra, G., 1998, Operation Models for Optimization and Stochastic Simulatiuon of Electric Energy Systems (original in Spanish), PhD Thesis, Universidad Pontificia Comillas.

    Google Scholar 

  • Law, A.M. and Kelton, W.D., 2000, Simulation modelling and analysis, 3rd edition, McGraw-Hill.

    Google Scholar 

  • Roman, J., & Allan, R.N., 1994, ’“Reliability assessment of hydro-thermal composite systems by means of stochastic simulation techniques”’, Reliability Engineering & System Safety, Vol. 46, No. 1, p. 33–47.

    Article  Google Scholar 

  • Sankarakrishnan, A. and Billinton, R., 1995, ’“Sequential Monte Carlo simulation for composite power system reliability analysis with time varying loads”’, IEEE/PES Winter Meeting.

    Google Scholar 

  • Turgeon A. and Charbonneau R., 1998, ’“An aggregation-disaggregation approach to long-term reservoir management”’, Water Resources Research Vol. 34, No. 12, p. 3585–3594.

    Article  Google Scholar 

  • Van Hecke, J. et al., 1998, ‘‘Sequential probabilistic methods for power system operation and planning’’, CIGRE TF38.03.13, Elektra No. 179.

    Google Scholar 

  • Wirfs-Brock, R., Wilkerson, B., Wiener, L., 1990, Designing Object-Oriented Software Prentice Hall.

    Google Scholar 

  • Wood, A.J. and Wollenberg, B.F., 1996, Power generation, operation, and control, 2nd edition John Wiley & Sons.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2008 springer

About this chapter

Cite this chapter

Latorre, J.M., Cerisola, S., Ramos, A., Bellido, R., Perea, A. (2008). Creation of Hydroelectric System Scheduling by Simulation. In: Qudrat-Ullah, H., Spector, J., Davidsen, P. (eds) Complex Decision Making. Understanding Complex Systems. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-73665-3_5

Download citation

Publish with us

Policies and ethics